Etiqueta: dextra
Rail Baltica Bridge Over Neris River, Lithuania
Postado em por Kansuda Visesthanakorn
Rail Baltica Bridge over the Neris River, Lithuania
The construction of the Rail Baltica Bridge over the Neris River near Jonava marks a significant milestone in the region’s railway infrastructure. Stretching 1.5 kilometers, this bridge will not only be the longest in Lithuania but also the entire Baltic States. Designed with a variety of spans—including cast-in-place from traveler, cast-in-place supported on falsework, and span-by-span cantilever—the project showcases advanced engineering techniques and a commitment to environmental protection.
Dextra plays a vital role in ensuring the structural integrity of the bridge by supplying Sonitec crosshole sonic logging (CSL) testing tubes for the testing of piles. CSL testing is a crucial procedure that provides real-time insights into the quality and integrity of concrete in the piles, ensuring they meet stringent safety standards. This advanced technology enables engineers to detect anomalies and assess the quality of the concrete, ensuring the long-term durability of the bridge.
O uso de Sonitec is particularly important given the bridge’s engineering complexity and the environmental considerations surrounding its construction. By integrating this technology, Dextra helps to uphold the highest standards of construction and environmental stewardship.
Anterior
Próximo
The Rail Baltica project represents the largest railway infrastructure development in the history of the Baltic States. Once completed, it will provide an electrified double-track European gauge railway line connecting major cities such as Warsaw, Kaunas, Riga, and Tallinn. This ambitious project will span a total of 870 kilometers, with 392 kilometers in Lithuania alone.
With the Rail Baltica Bridge over the Neris River, Dextra is proud to contribute to a landmark project that promises to enhance regional connectivity, promote sustainable transport solutions, and respect the delicate balance between development and environmental conservation. As construction progresses, the bridge will stand as a testament to innovative engineering and collaboration, paving the way for a brighter, more connected future in the Baltics.
Port of Neom, Oxagon, Saudi Arabia
Postado em por Kansuda Visesthanakorn
Port of Neom, Oxagon Port Stage 1 & 2, Saudi Arabia
As part of Saudi Arabia’s ambitious NEOM development, the Port of NEOM project, also known as the “Oxagon Port Stage 1 & Stage 2”, is envisioned to become the world’s largest floating industrial complex. Located on the Red Sea, the Port of NEOM is set to revolutionize the region with its innovative design and focus on sustainable development.
Dextra has been selected by Six Construct Saudi and MBL (Oxagon Stage 1) and Saudi Archirodon (Oxagon Stage 2), to provide high-performance solutions for this vital infrastructure, supplying 7,750 tons of Barras de gravata marítima in various sizes in Grade 500. These tie bars, paired with specialized accessories, are engineered to offer maximum durability and performance, critical to securing the 4-km long quay wall’s stability and longevity in demanding marine conditions.
The Importance of Marine Tie Bars
The quay wall forms the backbone of the new port infrastructure, facilitating vessel docking, cargo handling, and long-term maritime operations. Marine tie bars play an essential role in the integrity of this massive structure.
Dextra’s Barras de gravata marítima, manufactured to the highest standards and key to ensuring the required lifetime of the marine structure.
A Partnership for the Future
Dextra’s involvement in the Port of NEOM project underlines the company’s commitment to providing cutting-edge engineering solutions for large-scale infrastructure developments worldwide. As Saudi Arabia continues to build toward its Vision 2030, Dextra’s expertise and high-performance products are playing a pivotal role in shaping the future of this transformative region.
Anterior
Próximo
Industrial Bridge, Chile
Postado em por Kansuda Visesthanakorn
Industrial Bridge, Chile
Dextra’s engineering expertise and innovative products played a pivotal role in the construction of the Industrial Bridge in Chile. As part of the project, Dextra supplied its Rolltec mechanical splice system, ensuring robust and reliable rebar connections. Additionally, headed bars were provided to enhance anchorage performance, a critical requirement for the bridge’s structural integrity.
The project also utilized Sonitec crosshole sonic logging (CSL) testing tubes, facilitating thorough integrity testing of concrete piles, ensuring long-term safety and performance. These advanced solutions reflect Dextra’s commitment to supporting complex infrastructure projects with high-quality, tailored products.
The Industrial Bridge stands as a testament to modern engineering and showcases the critical role Dextra’s solutions play in shaping resilient and efficient infrastructure worldwide.
Anterior
Próximo
Wynn Al Marjan Island, UAE
Postado em por Kansuda Visesthanakorn
Wynn Al Marjan Island, United Arab Emirates
The Wynn Al Marjan Island, located in Ras Al Khaimah, United Arab Emirates, is set to be an iconic luxury destination, marking Wynn’s first foray into the Middle East. This spectacular development will feature a world-class hotel, upscale dining, entertainment venues, and extensive leisure facilities, all nestled along the pristine shores of the Arabian Gulf. With its signature blend of elegance and grandeur, the Wynn aims to offer an unparalleled experience that combines luxury, relaxation, and entertainment for visitors from around the globe.
Dextra has made a substantial contribution to the construction by supplying 350,000 Bartec couplers. These couplers are essential for the concrete slab and column connections, ensuring robust and reliable reinforcement in both vertical and horizontal applications.
Designed to meet the demanding structural requirements of large-scale developments, Bartec couplers are known for their superior strength and durability. Their use in the Wynn project not only supports the integrity of the structure but also accelerates construction by facilitating efficient load transfer across critical connection points.
Dextra is proud to be part of this landmark project, demonstrating their commitment to delivering high-quality solutions for premier developments worldwide.
Anterior
Próximo
Grand Paris Express – Line 16-18, France
Postado em por Kansuda Visesthanakorn
Grand Paris Express – Line 16-18, France
Dextra has proudly supplied its high-performance Fortec acopladores de vergalhão e Sonitec crosshole sonic logging (CSL) tubes for the construction of the Grand Paris Express Line 16-18 in France, one of Europe’s most ambitious infrastructure projects. This metro expansion aims to improve connectivity between the suburbs and the city center, providing a more efficient transportation network for millions of commuters.
Dextra’s Fortec couplers were utilized for reliable and durable rebar connections, ensuring the structural integrity of the extensive underground tunnels and stations. In addition, the Sonitec CSL tubes were supplied for concrete pile integrity testing, essential for assessing the quality of deep foundations. These innovative solutions have contributed to the project’s success in meeting high safety and performance standards, underscoring Dextra’s commitment to delivering top-quality materials for large-scale infrastructure developments.
With the Grand Paris Express set to transform the city’s transportation landscape, Dextra’s involvement highlights its role in shaping resilient and sustainable urban infrastructure.
Anterior
Próximo
Honoring Two Decades of Dedication from Our Long-Term Employees
Postado em por Kansuda Visesthanakorn
This year, we are thrilled to celebrate a significant milestone for several of our dedicated employees who have spent 20 years with us. Their journey is a testament to the strength of our team and the values we uphold as an organization.
At Dextra, we believe that our people are our greatest asset. Each of these employees has played a vital role in our achievements, contributing their skills, passion, and creativity to help us reach new heights. Their commitment not only reflects their personal dedication but also embodies the spirit of collaboration and innovation that drives our success.
As we celebrate this milestone, we want to express our heartfelt gratitude to these remarkable individuals. Your hard work and loyalty have not gone unnoticed, and we are proud to have you as part of our family.
Together, we look forward to continuing this journey, embracing new challenges, and achieving even greater successes in the years to come.
Thank you for being an integral part of our story!
Dextra Undergoes ISO 19443 Audit with Bureau Veritas
Postado em por Kansuda Visesthanakorn
At Dextra, we are committed to maintaining the highest standards of quality and safety in the nuclear industry. Our manufacturing plants in Thailand and India are currently being audited by Bureau Veritas for the prestigious ISO 19443 Nuclear Certification.
This marks a renewal of the certificate for our Thailand factory, reaffirming our long-standing commitment to excellence, and a new milestone for our India factory, as it undergoes this certification process for the first time.
Why Bureau Veritas?
Bureau Veritas is a global leader in testing, inspection, and certification, with nearly 200 years of experience.
Their reputation for technical expertise, high quality, and integrity makes them the ideal partner for our certification process.
Here are a few reasons why we chose to work with Bureau Veritas:
- Unmatched Expertise: Bureau Veritas has a long-standing history of providing top-notch services in quality management and certification. Their deep-rooted knowledge and experience in the nuclear sector ensure that we are in capable hands.
- Global Reach: With a presence in over 140 countries, Bureau Veritas offers a comprehensive understanding of international standards and practices. This global perspective is crucial for our operations in Thailand and India.
- Commitment to Sustainability: Bureau Veritas is dedicated to promoting sustainable practices. Their focus on environmental responsibility aligns with our own commitment to sustainability and quality.
The Audit Process:
The audit by Bureau Veritas involves a three-week, thorough examination of our quality management systems, safety protocols, and operational procedures. This rigorous process ensures that we meet the stringent requirements of the ISO 19443 standard, which is specifically designed for the nuclear industry.
Looking Ahead:
We are confident that this audit will further solidify our position as a leader in the rebar coupler manufacturing industry.
Achieving ISO 19443 certification will not only enhance our credibility but also provide our customers with the assurance that they are receiving products of the highest quality and safety standards.
Stay tuned for more updates on our certification journey.
We extend our gratitude to Bureau Veritas for their meticulous audit process and to our dedicated teams for their hard work and commitment.
PC Headed Bars Achieves AFCAB & CARES Certifications
Postado em por Kansuda Visesthanakorn
We are thrilled to announce that our new generation of PC (Pressed Connection) Headed Bars has received certification from both AFCAB in France and CARES in the UK!
AFCAB has certified our model 9D (double chamfer) for general applications. Meanwhile, the CARES TA1-B&C certificate no. 5071 has certified both our models 9D and 9A (single chamfer). These CARES certifications cover a wide range of applications, including general and nuclear construction, showcasing the exceptional performance of Dextra’s product solutions.
Dextra PC Headed Bars, ranging from 10mm to 20mm, feature a circular plate forged to the end of the reinforcing bar. The headed bars meet Eurocode requirements with a load-bearing area at least 9 times the cross-section of the reinforcement bar.
Note
- The previous UK Cares certification is now renamed to CARES.
- CARES certification does not cover seismic performance. TA1-B is designated for general applications, while TA1-C is for nuclear applications.
- The headed bars meet Eurocode requirements concerning load-bearing area.
My Enso Loft, Philippines
Postado em por Kansuda Visesthanakorn
My Enso Lofts, Philippines
Dextra has played a key role in the construction of the My Enso Lofts condominium project in Quezon, Philippines, by supplying cutting-edge reinforcement solutions. For this high-rise development, Dextra provided Bartec rebar splicing systems for the raft foundation, columns, and core walls, ensuring robust structural integrity and efficient load transfer across these critical elements.
Additionally, Dextra supplied Groutec S couplers for the precast shear wall and column connections. These couplers are designed for rapid assembly, which accelerated the construction timeline and enhanced the project’s overall structural stability.
By delivering these innovative solutions, Dextra continues to support the construction of resilient and durable buildings in the Philippines, reinforcing their commitment to excellence in infrastructure projects worldwide.
Anterior
Próximo