Grupo Dextra | Conexões confiáveis

Procurar
Feche esta caixa de pesquisa.
Procurar
Feche esta caixa de pesquisa.

Dextra’s Quarterly Newsletter: Connection #36

Welcome to our first newsletter of 2024. On behalf of all Dextra employees, we extend our warmest wishes to you and your loved ones for a joyous and prosperous New Year and Chinese New Year!

As we bid farewell to 2023, a remarkable year for us as we celebrated our 40 years of establishment, we want to express our heartfelt gratitude to you for your presence in our celebration events which added a special touch to our milestone.

In 2024, we eagerly look forward to continuing our collaboration with you. Your dedication and support have been instrumental in our success, and we are excited about the opportunities and achievements that lie ahead.

Thank you for being a valued part of the Dextra family!


India’s Longest Sea Bridge

Unveiled for Public Journeys

The 22-km Mumbai Trans Harbour Link (MTHL), connecting Mumbai with Navi Mumbai, features a 6-lane, 27-meter-wide highway with two emergency exit lanes. Recently opened this month, this sea bridge, the longest in India, aims to alleviate Greater Mumbai’s traffic congestion. Dextra’s contribution includes supplying 290,000 Bartec couplers for concrete structure reinforcement and 50,000 Sonitec sonic tubes for CSL testing in barrette piles.

Read more about our contribution

 

More about our latest projects

Click on the pictures to read more:

 

Grand Inauguration of Dextra’s

State-of-the-Art Factory in India!

We are thrilled to announce the successful inauguration of our brand-new factory in Pune, Maharashtra, India!

Equipped with cutting-edge machinery, our 12,000 square-meter facility is now in full swing to meet the highest industry standards. We produce top-quality rebar couplers at double capacity, Sonitec tubes, and have introduced a new facility for manufacturing GFRP rebars. Additionally, it is equipped with an in-house testing laboratory and workspace for the repair and refurbishment of site equipment.

The factory boasts a comfortable working environment designed with the well-being of our incredible team in mind. Safety is our priority, and our new facility reflects our commitment to providing an outstanding workplace for our dedicated employees.

Watch the video to get an exclusive peek into the joyous celebrations that marked this milestone for Dextra.

Watch the video on YouTube

 

Recent activities

Factory 2 in Thailand Achieves Green Industry Level 3 Certification

Following in the footsteps of our Level 3-certified Factory 1 in Bangkok, Thailand, Factory 2 has recently been awarded the same Green System certification by the Ministry of Industry of Thailand. This illustrates our commitment to systematic environmental management, rigorous monitoring, evaluation, and continuous improvement.

Environmental Leadership Honored: Dextra Receives Award in China

Dextra received the Environmental Leadership Award at the Sino-French GBA Business Summit in Guangzhou, China, in recognition of its outstanding contribution to environmental sustainability. Our GFRP rebars, key players in reducing CO2 emissions compared to traditional steel rebars, underscore our commitment to building a greener, more sustainable future.

 

Upcoming events

Dextra’s New Office in Pune, India

We’re overjoyed to announce the grand inauguration of our brand-new office building at our recently opened Pune factory! This marks a significant milestone in our journey as we expand our services and presence across India.

While our main office continues to thrive in Mumbai, we’re now even closer to our valued customers in Pune with this new addition. Plus, our representatives are readily available in Chennai & Delhi to ensure seamless assistance and support wherever you are.

Big thanks to our dedicated team whose hard work and commitment have made this expansion possible. Once again, here’s to new beginnings, endless opportunities, and continued growth!

Jal Jeevan Mission Water Reservoirs, India

 

Jal Jeevan Mission Water Reservoirs, India

 

The Jal Jeevan Mission of the Government of India is a flagship initiative where attempts are made to ensure adequate supplies of quality drinking water at affordable rates on a long-term basis. It emphasizes the importance of proper water management, infrastructure development, and community participation to achieve the ambitious goal of ‘Har Ghar Jal’ (Water to Every Household).

Considering the widespread geography of India, uneven terrain, and human settlements in remote locations, access to continuous water is a challenge. Therefore, overhead tanks are a good option for efficiently storing and distributing water, particularly in areas with inconsistent water supply patterns. Construction and infrastructure development are yet another key factors that have a direct influence on development.

Precast construction is one such method that has gained tremendous momentum in recent times due to its advantages, such as accelerated productivity, better quality control, environmental friendliness, and optimized material and labor usage. Although this method incurs high initial setup costs, its attractiveness is enhanced by large-scale projects with standardized designs. In the project, our team worked in close coordination with Larsen & Toubro (L&T) from the design stage, carefully selecting Groutec and Bartec couplers to connect the H and U frames of the overhead tanks.

Our range of Groutec couplers is arguably the most reliable mechanical splices, specially designed to connect two precast elements with no requirement for in-situ wet concrete joints. These couplers have been successfully qualified and tested over the years on several major infrastructure projects, including process plant pipe racks, residential and commercial buildings, and data centers, among others.

 

Tai Po Railway Pier – Reconstruction of Tai Po Kau Tide Gauge Station

 

Tai Po Railway Pier – Reconstruction of Tai Po Kau Tide Gauge Station, Hong Kong

 

In the dynamic coastal landscape of Tai Po Kau, New Territories, Hong Kong, infrastructure projects demand robust and resilient solutions. One such endeavor, the Reconstruction of Tai Po Kau Tide Gauge Station project, required innovative materials to withstand the unique challenges posed by its environment. Dextra stepped in to provide approximately 1,000 meters of Glass Fibre Reinforced Polymer (GFRP) rebar for the slab of the Tai Po Railway Pier, showcasing the efficacy of advanced composite materials in marine construction.

The Tai Po Kau Tide Gauge Station project aimed to revitalize the existing infrastructure, enhancing its resilience against tidal forces, corrosion, and environmental degradation. Recognizing the limitations of traditional steel reinforcement in marine environments, the project sought alternatives that could offer superior durability and longevity. Dextra’s GFRP rebar emerged as the ideal solution, offering exceptional resistance to corrosion, rust, and chemical degradation commonly associated with saltwater exposure.

GFRP rebar, composed of high-strength glass fibres embedded in a polymer matrix, delivers mechanical properties comparable to steel but with added benefits. Notably, GFRP rebar exhibits significantly lower thermal conductivity, reducing the risk of thermal bridging and enhancing structural integrity in extreme temperature variations. Furthermore, its non-magnetic properties eliminate electromagnetic interference, making it suitable for sensitive applications such as tide gauge stations.

The application of GFRP rebar within the Tai Po Kau Tide Gauge Station project encompassed both straight and bend bars, catering to the diverse structural requirements of the public pier. Dextra’s expertise in custom fabrication ensured precise bending and shaping of the rebar to fit the intricate geometries of the pier structure, facilitating seamless integration and minimizing construction complexities.

Nestlé LEO Factory, Thailand

 

Nestlé LEO Factory, Thailand

 

Nestlé LEO Factory’s reliance on precast elements necessitated a reliable, efficient method for joining the precast structure of the building. The construction utilized Groutec F, a well-known splicing system engineered by Dextra, to meet the exacting demands of the precast building. Groutec F allows for the connection of rebars without the need for bar end preparation and was used for the precast joint connection of beam and column in this project.

Groutec F is a fully grouted connection solution, ensuring robustness and durability in the face of dynamic operational environments. Engineered and manufactured in compliance with industry-leading standards such as Eurocode 2, BS 8110, ACI 318, IBC, and AASHTO, Groutec F guarantees adherence to rigorous structural specifications. It is compatible with major non-shrink grout brands readily available on the market, reducing logistical complexities and procurement lead times.

 

One Lake Club, Romania

 

One Lake Club, Romania

 

One Lake Club is a prestigious project promises to redefine luxury living in the Romanian capital. It aims to set new standards in urban living, offering residents an unparalleled blend of elegance, comfort, and functionality. The project encompasses a range of residential and recreational facilities, including luxury apartments, lush green spaces, and state-of-the-art amenities. With its ambitious vision and meticulous attention to detail, One Lake Club represents a beacon of modern architectural excellence in Bucharest.

As construction progresses on this ambitious venture, ensuring the structural integrity of the building is paramount. This is where Dextra’s Bartec couplers come into play. Renowned for their reliability and versatility, Bartec BF couplers provide robust connections between reinforcing bars, enhancing the strength and durability of concrete structures. In the case of the One Lake Club project, these couplers are specifically tailored for temporary opening applications, offering flexibility and efficiency in construction processes.

The 12mm Bartec BF couplers serve as the linchpin in the construction workflow, enabling seamless integration of reinforcing bars within the concrete framework. Their innovative design ensures quick and easy installation, minimizing construction time while maximizing safety and performance. By facilitating temporary openings in the concrete structure, these couplers enable efficient access for maintenance, inspection, and future modifications, thereby streamlining the construction process and ensuring long-term durability.

 

Uniqlo & Hive Indonesia Warehouse

 

Uniqlo & Hive Indonesia Warehouse

 

Indonesia’s building construction has spurred a need for rapid and efficient construction methods capable of meeting the demands of a burgeoning population. Precast construction has emerged as a solution to these challenges as it helps minimize on-site labor requirements, accelerates project timelines, and ensures consistent quality.

At the heart of successful precast construction lies the seamless connection between structural elements. Dextra supplied Groutec precast couplers for projects around the world, including Indonesia. Groutec in size 20mm were used in the Uniqlo & Hive Indonesia warehouse building project for joining precast columns, facilitating rapid and reliable assembly while ensuring structural integrity.

The couplers have minimized on-site labor requirements and accelerated project milestones. This not only translates to cost savings but also ensures timely delivery, allowing the building to fulfill its intended purpose sooner. Additionally, the couplers’ high-strength steel composition and stringent quality control measures guarantee robust connections that withstand the rigors of dynamic structural loads.

 

Impulsionando a sustentabilidade: apresenta EPDs para tirantes marítimos

 

Temos o orgulho de anunciar a mais recente adição à nossa jornada de sustentabilidade: EPDs para barras de amarração marítimas!

Essa conquista segue nossos avanços na construção ecologicamente consciente com EPDs (Declarações Ambientais de Produto) para acopladores de vergalhões e vergalhões GFRP. Nosso compromisso continua enquanto nos preparamos para introduzir EPDs para nossos outros sistemas de barras projetados e soluções adicionais. Fique ligado enquanto continuamos a preparar o caminho para um futuro mais verde e sustentável na construção!

 

EPD Report for Dextra Marine Tie Bars

Relatório EPD para barras de ligação Dextra Marine

Não é possível exibir o arquivo PDF. Download em vez de.

Grupo Dextra brilha no Employee Experience Awards Tailândia 2024!

Em meio à atmosfera vibrante do Jantar de Gala do Employee Experience Awards Tailândia 2024, o Grupo Dextra se destacou entre os concorrentes estimados, garantindo quatro vitórias impressionantes. Este importante evento, realizado em 15 de março de 2024, celebrou organizações dedicadas a elevar a experiência dos funcionários, reconhecendo aqueles que se destacam na promoção de ambientes de trabalho excepcionais.

 

Meses de preparação meticulosa culminaram na decisão do Grupo Dextra de competir em seis categorias diversas, refletindo o nosso compromisso inabalável com a excelência. Desde a elaboração de estratégias robustas de recuperação pós-pandemia até a promoção de talentos por meio de programas de certificação inovadores, cada envio destacou nossa dedicação em promover o bem-estar e o crescimento profissional dos funcionários.

 

A competição foi acirrada: 28 empresas conceituadas participaram da competição, com gigantes da indústria como adidas, Mondelēz, EY, Generali, Central Retail e Lenovo, para citar alguns, disputando as principais honras. No entanto, neste contexto, o Grupo Dextra emergiu triunfante, demonstrando a nossa resiliência, inovação e compromisso inabalável com a excelência.

 

Nossas vitórias foram espetaculares:

 

Melhor Gestão de Crises e Liderança: Prêmio Ouro

Melhor Programa ESG: Prêmio Ouro

Melhor Programa de Certificação Interna: Silver Award

Melhor site interno de carreira: Silver Award

 

Estes prémios não só reconhecem as nossas conquistas, mas também reafirmam a nossa posição como pioneiros na inovação e nas melhores práticas de RH. Refletem os esforços coletivos das nossas equipas dedicadas, cuja paixão e perseverança têm sido fundamentais para impulsionar o sucesso da nossa empresa.

 

Ao refletirmos sobre esta importante conquista, sentimo-nos inspirados a continuar a ultrapassar limites, a estabelecer novos padrões e a causar um impacto significativo na nossa organização e na comunidade de RH em geral. Os Employee Experience Awards servem como uma prova do nosso compromisso inabalável com a excelência e um poderoso lembrete do que pode ser alcançado através da colaboração, dedicação e inovação.

Inauguração da nova fábrica da Dextra em Pune, Índia

Notícias emocionantes da Dextra! Temos o prazer de anunciar a inauguração bem-sucedida de nossa nova fábrica em Pune, Maharashtra, Índia!

Equipada com maquinário de última geração, nossa instalação de última geração com 11.869 metros quadrados está agora em pleno funcionamento para atender aos mais altos padrões do setor. Produzimos acopladores de vergalhões de alta qualidade com capacidade dupla, tubos Sonitec, e introduzimos uma nova instalação para a fabricação de vergalhões GFRP. Além disso, está equipado com um laboratório de testes interno e um espaço de trabalho para reparo e reforma dos equipamentos do local.

A fábrica possui um ambiente de trabalho espaçoso e confortável, projetado pensando no bem-estar de nossa incrível equipe. A segurança é a nossa prioridade e as nossas novas instalações refletem o nosso compromisso em proporcionar um excelente local de trabalho aos nossos funcionários dedicados.

Curioso para ver alguns destaques da grande celebração? Assista ao vídeo completo para dar uma olhada exclusiva nos momentos de alegria que marcaram esse marco para a Dextra no YouTube: 

Por favor insira suas informações

Contate-nos

   Compartilhe suas informações conosco e entraremos em contato com você o mais breve possível.