Complexo Icon Siam | ไอคอนสยาม

Complexo Icon Siam | ไอคอนสยาม

Icon Siam complex, located on the right bank of the Chao Phraya river in the West of Bangkok, is a new multipurpose commercial/residential complex consisting of two highrise buildings and a shopping mall. This new massive project aims to give back its glamour to the banks of the Chao Praya river.

The two towers are expected to reach 280m (SuperLux Tower) and 315m (Magnolia Tower) respectively. The Magnolia Tower will thus be slightly taller than the MahaNakhon Tower, Bangkok’s tallest building since 2015.

Dextra is supplying Thai-Obayashi (contractor of the shopping mall structure) and Italian-Thai (contractor of both towers) with its Bartec rebar splicing solution.

Dextra engineers performed operator trainings and do preventive maintenance directly on site to guarantee maximum output in thread production.

In total, more than 800,000 Bartec rebar couplers and 20,000 Bartec Barras com cabeça are being used in foundations and superstructure in the following applications:

L-shaped dowel bars (wall-slab connections)

This is a typical application used in foundation D-Walls to avoid protruding rebar. it is also used in the superstructure to allow the sliding formwork to climb up without any disturbance

Substitution of hooked bars with end anchors

When the wall reinforcement is especially congested, the use of Headed Bars (also called end anchors) allows to anchor the reinforcement in the wall without the need to produce hooks.

Double-ended connection in shear-walls

This solution allows to create a continuity inside the column or wall by bridging two horizontal slabs or beams.

Welded couplers for composite structures

Sometimes it is necessary to start reinforcement from the steel structure. In that case, weldable couplers are the ideal solution: Made of a low-carbon steel, they can be welded easily and allow connection to a threaded rebar.

Marco 81, cidade de Ho Chi Minh

Marco 81, cidade de Ho Chi Minh

Landmark 81 is a new highrise tower project located on the bank of the Saigon river in Ho Chi Minh City. The project is owned by Vietnamese company Vingroup.

The tower, whose construction started end of 2014, is expected to reach the height of 462 meters, a new height record in Vietnam. Landmark 81 will the 11th tallest tower building in the world.

For this project, Dextra is supplying its renowned
Bartec solution to contractor Coteccons. Bartec solution has been approved by ARUP, owner’s representative consultant, and MACE International, structural consultant.

In total, 250,000 Bartec couplers will be used for vertical rebar connection in the corewall and columns as well as for horitonzal applications such as corewall-to-beam and corewall-to-slab connections.

The use of rebar couplers allows the climbing ormwork to move its way up unencumbered as well as connect slabs starting bars in a very productive manner. Those technologies combined with state-of-the-art concrete monitoring allow very fast construction cycles as short as 35 hours per floor.

For composite applications (steel columns to beams), Dextra also supplied 20,000 weldables couplers.


Example of weldable Bartec coupler on beam

The fast-paced construction site is supported by three sets of Dextra Bartec equipment, installed directly on site. The equipment is maintained by Dextra and operated by Dextra’s distributor in Vietnam, Lotus Greentech.

Concrete works were completed ahead of schedule early 2018.

Banco Nacional do Kuwait – Nova Sede

Banco Nacional do Kuwait – Nova Sede

O novo edifício sede do Banco Nacional do Kuwait é uma torre de 300 m de altura que cobre uma área total de 127.000 m2 com um conceito de design inspirado em conchas de pérolas e localizada no coração do distrito financeiro da Cidade do Kuwait.

A construção principal é composta por concreto misto e aço, enquanto o revestimento das aletas e fachadas de vidro é predominantemente de concreto reforçado com vidro.

A Dextra participou no reforço da estrutura de betão do edifício, fornecendo estas soluções:

  • Foram instalados 100.000 acopladores Bartec para reforço de pilares, juntas de construção em vigas e ligações de laje/viga a parede central.
  • 35.000 barras com cabeça atuam como pinos de cisalhamento na jangada.
  • 1.500 acopladores parafusados Unitec foram usados para estender barras de reforço existentes que não eram rosqueadas ou eram muito curtas para serem lapidadas. É uma solução conveniente para conectar vergalhões usando uma simples chave pneumática no canteiro de obras, sem a necessidade de qualquer preparação de vergalhões.
  • O condomínio Ameixa | Adeus

    O condomínio Ameixa | Adeus

    A estação Plum Central é um projeto de condomínio de 38 andares, composto por 2 torres e localizado próximo à estação elevada de metrô Bang Yai, no noroeste de Bangkok. O edifício residencial abrigará 1.013 apartamentos.

    A Fase 1 do projeto (primeira torre) começou em setembro de 2015 e será concluída por volta de março de 2018. O ritmo acelerado de construção é possível pelo uso de técnicas de concreto “totalmente pré-moldado”.

    O proprietário do projeto, Pruksa, está operando sua própria fábrica de pré-moldados para este projeto.

    Para este projeto, o objetivo da Pruksa era ser capaz de erguer rapidamente painéis pré-moldados (atuando como paredes de cisalhamento) para todos os níveis acima do solo. A Dextra sugeriu para esse fim a utilização de acopladores Groutec.

    Engates Groutec, montados em vergalhões Ø25mm previamente preparados com rosca Bartec. Os acopladores, instalados na parte inferior de cada elemento pré-moldado, são então fundidos como parte do elemento do painel de parede pré-moldado.

    Após a elevação do elemento até ao piso superior no local, a religação à armadura saliente é conseguida através da injeção de argamassa antirretração. De referir que a Dextra não fornece a argamassa, que pode ser adquirida localmente, gerando poupanças significativas. Após a injeção do rejunte, o reforço em torno de cada painel pode ser removido após 3 dias.

    Para obter mais informações sobre a Estação Central Plum e a aplicação Groutec, consulte nosso estudo de caso.

     

    UMA Torre Limassol

    UMA Torre Limassol

    ONE Limassol Tower is a commercial building and a new landmark of Limassol, Cyprus. The project aims to position the island on the international luxury property market, enhancing the attractiveness of the country for foreign investment by offering world-class residence, amenities and services. This will also boost Cyprus’ economy, while increasing local employment opportunities.

    At 170 meters above ground with 33 storeys in total, the ONE Limassol Tower is the tallest seafront residential project in Europe. The building will host 83 luxurious apartments, including a three-storey penthouse.

    For the reinforcement of this landmark building, Dextra delivered its rebar couplers and bar-end preparation machine sets to the contractor J&P and ACC JV, which is a joint-venture between Joannou & Paraskevaides Group (J&P) and Arabian Construction Company (ACC).

    More than 60,000 Bartec couplers were used for rebar splicing in rafts and vertical parts of the building.

    The completion of this iconic project is scheduled in 2019.

    Ato Um | Torre do Ato Dois

    Ato Um | Torre do Ato Dois

    Act One | Act Two Tower is a premium residential project in the Opera District of Downtown Dubai.

    The project consists of two towers called Act One (52 stories) and Act Two (46 stories).

    With their prime location, these residential towers offer views of the Dubai Fountain and the Burj Khalifa and they are few minutes away from Dubai Metro and from major attractions like the Dubai Mall and the Souk al Bahar.

    For this exceptional residential project, Dextra was entrusted with the reinforcement of the buildings’ structures, including raft foundations, columns, slabs and construction joints.

    150,000 Bartec rebar couplers along with rebar preparation machines were delivered to the construction site.

    Bartec rebar couplers help speed up the construction with a faster and more convenient way of connecting rebars than the traditional rebar lapping method.

    The thread on the rebar can be extended from a half-coupler to a full coupler length, allowing to perform the connection without any bar rotation.

    The project is scheduled to be completed in November 2020.

    Grande varejo

    Grande varejo

    This new 4-story retail center has been designed to have the smallest carbon footprint possible, with an innovative optimization of the air-condition load.

    It is located in Jebel Ali, Dubai, UAE with an 81,000 sqm floor area and a leasable area for over 100 retail and concept stores.

    Dextra Groutec couplers contained in the precast panels made the assembly on site easy and fast. More than 1,100 units of Groutec L 25 and 32mm were delivered.

    Groutec is a high-performance precast connection solution which is convenient to set up and fast to install on site by grout injection. It supports the connection of precast concrete columns, panels and beams.

    The first phase of the retail center is set for completion in 2019. The second phase will include a residential area to create a new lifestyle hub in Dubai.

    Torre Trinity La Défense

    Torre Trinity La Défense

    A Trinity Tower, no bairro comercial de La Défense, a oeste de Paris, é uma nova torre de escritórios de 33 andares e 140 metros de altura que contará com mais de 52.000 metros quadrados de espaço de escritórios.

    O projeto visa alcançar impacto social e ambiental local, adicionando grandes espaços públicos ao ar livre, reconectando áreas anteriormente desconectadas pela estrada. Contará também com espaços verdes, espaço na cobertura, fachadas abertas e obterá certificação LEEDS.

    Para este projeto, a Dextra forneceu através do seu distribuidor francês SNAAM Vernon mais de 18.000 FORTEC® conexões de vergalhões.

    Os acopladores de vergalhões permitem acelerar o ritmo de construção, proporcionando uma maneira rápida e segura de conectar os vergalhões: uma barra por vez, por feixes ou gaiolas. No caso de feixes e gaiolas, estes podem ser montados fora do local e simplesmente reconectados por acopladores quando chegarem ao local final.

    A Trinity Tower deverá ser concluída em 2019.

    Para obter mais informações sobre a disponibilidade de soluções de emenda de vergalhões na França, entre em contato com nosso Escritório de Paris Para maiores informações.

    Floresta Gardens Towers – The Pearl

    Floresta Gardens Towers – The Pearl

    The Floresta Gardens project involves construction of the towers inside The Pearl Qatar.

    The project consists with the construction of mid-rise residential towers and villas within three gated villa communities, including a 2,452-square meter retail center. The precinct has a gross floor space of 267,471 square meters, 145,967 square meters of developable land, and 5,000 residential units.

    In the precast construction of the towers, Dextra Groutec played a significant role. Over 30,000 Groutec L couplers in sizes 20 mm to 40 mm were inserted inside columns for vertical connections on the construction site.

    Groutec precast coupler is an innovative solution for fast and easy connection of precast concrete elements. It is widely used in residential and commercial construction projects around the world.

    Torre de Jidá

    Torre de Jidá

    Jeddah Tower (anteriormente conhecida como Kingdom Tower) é um arranha-céu histórico localizado ao longo do Mar Vermelho, no norte de Jeddah, na Arábia Saudita.

    O edifício comercial foi projetado para ultrapassar pela primeira vez a marca de 1 km com altura total prevista de 1.008 metros, tornando-se o edifício mais alto do mundo.

    A Jeddah Tower abrigará um hotel Four Seasons com 200 quartos, apartamentos com serviços, vários andares de escritórios e um observatório. Um total de 59 elevadores permitirão a movimentação dos visitantes entre os andares.

    A estrutura da torre foi projetada pela empresa de consultoria Thornton Tomasetti e construída pela empreiteira Saudi Bin Laden, para a qual a Dextra está entregando com o apoio de seu parceiro local Bahra Steel.

    A Dextra tem o orgulho de entregar 100% de acopladores de vergalhão na estrutura, tanto nas fundações quanto na superestrutura.

    Dois tipos principais de acopladores de vergalhão são usados na estrutura:

    • Para todas as fundações, colunas e conexões verticais, são usados acopladores Bartec padrão. Estes permitem a conexão rápida de gaiolas pré-fabricadas.
    • Para ligações de lajes, acopladores de ponte especiais também são usados para conectar cada perna da armadura em forma de U a um pilar.

    A torre ainda está em construção, com conclusão prevista para 2019.