London Wall Place is large a double tower office development in London built close to the Roman City Wall historical monument.

For this project, Dextra offered contractor Byrne Bros and main consultant WSP a technical solution for the fast installation of precast wall panels.

The concept was to install Groutec couplers in each panel reinforcement, at the bottom of the vertical bars previously prepared with Rolltec thread system, available in the UK through our distributor network.

After bracing the precast panel in its final position, non-shrink grout is injected into the cavity of the coupler, in order to create the rebar connection. Groutec is not reliant on a specific type of grout. Rather, several different brands of grout can be used, facilitating local scouring and helping to keep costs low. The bracing around the panel is then removed after the grout has achieve a prescribed strength.

After straightening and bracing of the precast panel, non-shrink grout is inserted into the cavity by injection. Dextra does not supply grout as Groutec is by design compatible with several brands that can be sourced locally, generating savings and easing project management.After injection, the bracing around the precast panel may then be removed after only 3 days.

The use of Groutec for precast panel is a time-saving and economical way to quickly take advantage of the precast technology. For similar application video, please check The Plum Central Station project page.

UMA Torre Limassol

UMA Torre Limassol

ONE Limassol Tower is a commercial building and a new landmark of Limassol, Cyprus. The project aims to position the island on the international luxury property market, enhancing the attractiveness of the country for foreign investment by offering world-class residence, amenities and services. This will also boost Cyprus’ economy, while increasing local employment opportunities.

At 170 meters above ground with 33 storeys in total, the ONE Limassol Tower is the tallest seafront residential project in Europe. The building will host 83 luxurious apartments, including a three-storey penthouse.

For the reinforcement of this landmark building, Dextra delivered its rebar couplers and bar-end preparation machine sets to the contractor J&P and ACC JV, which is a joint-venture between Joannou & Paraskevaides Group (J&P) and Arabian Construction Company (ACC).

More than 60,000 Bartec couplers were used for rebar splicing in rafts and vertical parts of the building.

The completion of this iconic project is scheduled in 2019.

Banco Nacional do Kuwait – Nova Sede

Banco Nacional do Kuwait – Nova Sede

O novo edifício sede do Banco Nacional do Kuwait é uma torre de 300 m de altura que cobre uma área total de 127.000 m2 com um conceito de design inspirado em conchas de pérolas e localizada no coração do distrito financeiro da Cidade do Kuwait.

A construção principal é composta por concreto misto e aço, enquanto o revestimento das aletas e fachadas de vidro é predominantemente de concreto reforçado com vidro.

A Dextra participou no reforço da estrutura de betão do edifício, fornecendo estas soluções:

  • Foram instalados 100.000 acopladores Bartec para reforço de pilares, juntas de construção em vigas e ligações de laje/viga a parede central.
  • 35.000 barras com cabeça atuam como pinos de cisalhamento na jangada.
  • 1.500 acopladores parafusados Unitec foram usados para estender barras de reforço existentes que não eram rosqueadas ou eram muito curtas para serem lapidadas. É uma solução conveniente para conectar vergalhões usando uma simples chave pneumática no canteiro de obras, sem a necessidade de qualquer preparação de vergalhões.
  • O condomínio Ameixa | Adeus

    O condomínio Ameixa | Adeus

    A estação Plum Central é um projeto de condomínio de 38 andares, composto por 2 torres e localizado próximo à estação elevada de metrô Bang Yai, no noroeste de Bangkok. O edifício residencial abrigará 1.013 apartamentos.

    A Fase 1 do projeto (primeira torre) começou em setembro de 2015 e será concluída por volta de março de 2018. O ritmo acelerado de construção é possível pelo uso de técnicas de concreto “totalmente pré-moldado”.

    O proprietário do projeto, Pruksa, está operando sua própria fábrica de pré-moldados para este projeto.

    Para este projeto, o objetivo da Pruksa era ser capaz de erguer rapidamente painéis pré-moldados (atuando como paredes de cisalhamento) para todos os níveis acima do solo. A Dextra sugeriu para esse fim a utilização de acopladores Groutec.

    Engates Groutec, montados em vergalhões Ø25mm previamente preparados com rosca Bartec. Os acopladores, instalados na parte inferior de cada elemento pré-moldado, são então fundidos como parte do elemento do painel de parede pré-moldado.

    Após a elevação do elemento até ao piso superior no local, a religação à armadura saliente é conseguida através da injeção de argamassa antirretração. De referir que a Dextra não fornece a argamassa, que pode ser adquirida localmente, gerando poupanças significativas. Após a injeção do rejunte, o reforço em torno de cada painel pode ser removido após 3 dias.

    Para obter mais informações sobre a Estação Central Plum e a aplicação Groutec, consulte nosso estudo de caso.

     

    Ato Um | Torre do Ato Dois

    Ato Um | Torre do Ato Dois

    Act One | Act Two Tower is a premium residential project in the Opera District of Downtown Dubai.

    The project consists of two towers called Act One (52 stories) and Act Two (46 stories).

    With their prime location, these residential towers offer views of the Dubai Fountain and the Burj Khalifa and they are few minutes away from Dubai Metro and from major attractions like the Dubai Mall and the Souk al Bahar.

    For this exceptional residential project, Dextra was entrusted with the reinforcement of the buildings’ structures, including raft foundations, columns, slabs and construction joints.

    150,000 Bartec rebar couplers along with rebar preparation machines were delivered to the construction site.

    Bartec rebar couplers help speed up the construction with a faster and more convenient way of connecting rebars than the traditional rebar lapping method.

    The thread on the rebar can be extended from a half-coupler to a full coupler length, allowing to perform the connection without any bar rotation.

    The project is scheduled to be completed in November 2020.

    Grande varejo

    Grande varejo

    This new 4-story retail center has been designed to have the smallest carbon footprint possible, with an innovative optimization of the air-condition load.

    It is located in Jebel Ali, Dubai, UAE with an 81,000 sqm floor area and a leasable area for over 100 retail and concept stores.

    Dextra Groutec couplers contained in the precast panels made the assembly on site easy and fast. More than 1,100 units of Groutec L 25 and 32mm were delivered.

    Groutec is a high-performance precast connection solution which is convenient to set up and fast to install on site by grout injection. It supports the connection of precast concrete columns, panels and beams.

    The first phase of the retail center is set for completion in 2019. The second phase will include a residential area to create a new lifestyle hub in Dubai.

    Torre Trinity La Défense

    Torre Trinity La Défense

    A Trinity Tower, no bairro comercial de La Défense, a oeste de Paris, é uma nova torre de escritórios de 33 andares e 140 metros de altura que contará com mais de 52.000 metros quadrados de espaço de escritórios.

    O projeto visa alcançar impacto social e ambiental local, adicionando grandes espaços públicos ao ar livre, reconectando áreas anteriormente desconectadas pela estrada. Contará também com espaços verdes, espaço na cobertura, fachadas abertas e obterá certificação LEEDS.

    Para este projeto, a Dextra forneceu através do seu distribuidor francês SNAAM Vernon mais de 18.000 FORTEC® conexões de vergalhões.

    Os acopladores de vergalhões permitem acelerar o ritmo de construção, proporcionando uma maneira rápida e segura de conectar os vergalhões: uma barra por vez, por feixes ou gaiolas. No caso de feixes e gaiolas, estes podem ser montados fora do local e simplesmente reconectados por acopladores quando chegarem ao local final.

    A Trinity Tower deverá ser concluída em 2019.

    Para obter mais informações sobre a disponibilidade de soluções de emenda de vergalhões na França, entre em contato com nosso Escritório de Paris Para maiores informações.

    Floresta Gardens Towers – The Pearl

    Floresta Gardens Towers – The Pearl

    The Floresta Gardens project involves construction of the towers inside The Pearl Qatar.

    The project consists with the construction of mid-rise residential towers and villas within three gated villa communities, including a 2,452-square meter retail center. The precinct has a gross floor space of 267,471 square meters, 145,967 square meters of developable land, and 5,000 residential units.

    In the precast construction of the towers, Dextra Groutec played a significant role. Over 30,000 Groutec L couplers in sizes 20 mm to 40 mm were inserted inside columns for vertical connections on the construction site.

    Groutec precast coupler is an innovative solution for fast and easy connection of precast concrete elements. It is widely used in residential and commercial construction projects around the world.

    Torre de Jidá

    Torre de Jidá

    Jeddah Tower (anteriormente conhecida como Kingdom Tower) é um arranha-céu histórico localizado ao longo do Mar Vermelho, no norte de Jeddah, na Arábia Saudita.

    O edifício comercial foi projetado para ultrapassar pela primeira vez a marca de 1 km com altura total prevista de 1.008 metros, tornando-se o edifício mais alto do mundo.

    A Jeddah Tower abrigará um hotel Four Seasons com 200 quartos, apartamentos com serviços, vários andares de escritórios e um observatório. Um total de 59 elevadores permitirão a movimentação dos visitantes entre os andares.

    A estrutura da torre foi projetada pela empresa de consultoria Thornton Tomasetti e construída pela empreiteira Saudi Bin Laden, para a qual a Dextra está entregando com o apoio de seu parceiro local Bahra Steel.

    A Dextra tem o orgulho de entregar 100% de acopladores de vergalhão na estrutura, tanto nas fundações quanto na superestrutura.

    Dois tipos principais de acopladores de vergalhão são usados na estrutura:

    • Para todas as fundações, colunas e conexões verticais, são usados acopladores Bartec padrão. Estes permitem a conexão rápida de gaiolas pré-fabricadas.
    • Para ligações de lajes, acopladores de ponte especiais também são usados para conectar cada perna da armadura em forma de U a um pilar.

    A torre ainda está em construção, com conclusão prevista para 2019.

    A torre pré-moldada mais alta da Índia

    A torre pré-moldada mais alta da Índia

    Galaxy Towers, developed by Aurobindo, is a project to construct 24-storey precast office building in Hyderabad, India.

    It will be the tallest office tower in India built with precast technology.

    The building comprises of 4 basement floors and 24 upper stories with 1.9 million sq. ft. leasable area, which will include health clubs, food courts, cafés, a business center, ample car parking and a waiting lounge.

    The project is expected to be built in half the time of a comparable conventional cast-in-situ construction, illustrating how the precast technology has gained ground thanks to its efficiency.

    For this special project, Dextra supplied a critical part of the precast structure: Groutec coupler, a half-grouted sleeve designed for the connection of precast elements and manufactured in compliance with Eurocode 2, BS 8110, ACI 318, IBC, AASHTO & IS 16172.

    By installing Groutec couplers into the precast columns and walls at the precast factory, the fast and safe connection of walls or columns is achieved by injecting cementitious non-shrink grout through the inlet into the sleeves at site. 102,000 Groutec couplers have been delivered for this project.

    The Galaxy Towers is anticipated to be completed in 2020.

    (photo credit: Aurobindo Realty & Infrastructure Private Limited at https://bit.ly/37DW7IT)

    Por favor insira suas informações

    Contate-nos

       Compartilhe suas informações conosco e entraremos em contato com você o mais breve possível.