The New Champlain Bridge is a 3 km-long bridge spanning the Saint Lawrence River at the southeastern entrance of Montreal, Quebec, Canada. As one of the busiest bridges in Canada, it plays a crucial economic role for the city, serving as a key route to the United States, located 60 km south.

 

Replacing the Older Champlain Bridge

The New Champlain Bridge is replacing the existing Champlain Bridge, which was commissioned in June 1962. The older structure began showing signs of corrosion in 1994. After several temporary safety measures were implemented to keep the bridge operational, a replacement project was initiated in 2007. For a time, both bridges will stand side by side until the older structure is fully dismantled, with most of its materials planned for recycling.

 

A Focus on Corrosion Resistance

The New Champlain Bridge is designed to last at least 125 years and accommodate 50 million vehicle crossings per year. Given the corrosive environment caused by frequent road de-icing, corrosion resistance was a top priority. Duplex stainless steel rebar was installed in critical areas to enhance durability.

For this project, Dextra recommended using Duplex Stainless Steel Rolltec couplers and anchors. This specialized version of our Rolltec® system replaces standard couplers and anchors with an improved duplex steel alternative, offering superior corrosion resistance.

The Rolltec® solution is well-suited to the Canadian market and is approved by the Quebec Ministry of Transport. With a single-operator threading machine and 30-second threading cycles, it provides high productivity, making it ideal for high-labor-cost markets like Canada.

More than 10,000 Stainless Rolltec® couplers were supplied for this project, primarily for bridge spans. These couplers were used to splice large-diameter reinforcement bars, ranging from 35M (#11) to 55M (#18)—the largest size available in our Rolltec® range.

Additionally, about 10,000 Rolltec® stainless steel end anchors were delivered for sizes up to 55M (#18). Rolltec® Headed Bars use the same threading system as the couplers, simplifying production and installation.

Soluções relacionadas

Perícia

Em cada momento da jornada do cliente, as equipes da Dextra se dedicam à produção de soluções construtivas inteligentes que permitem aos nossos clientes atingir maiores níveis de produtividade e segurança em seus canteiros de obras.

A Dextra possui stocks físicos em vários continentes, complementados em cada país pelos stocks locais dos nossos distribuidores. Com esta rede alargada, a Dextra garante que os nossos produtos estão sempre ao alcance, independentemente de onde os nossos parceiros estejam.

Para soluções que precisam ser customizadas, a Dextra também pode ir além dos nossos prazos de entrega padrão e oferecer esquemas de entrega acelerada. Consulte-nos para mais informações.

A partir de três grandes unidades industriais localizadas em Bangkok (Tailândia), Guangzhou (China) e Pune (Índia), a Dextra possui completamente suas instalações e processos de fabricação. Isto permite-nos ter total controlo sobre o timing das nossas operações e a qualidade das soluções produzidas.

Um laboratório de testes de materiais credenciado de forma independente, credenciado pela ISO-IEC17025, está localizado na principal fábrica da Dextra em Bangkok, permitindo o teste de materiais e produtos.

A Dextra visa fornecer produtos que superem as mais exigentes aprovações técnicas internacionais e é nosso objetivo criar a máxima satisfação do cliente, cumprindo as necessidades e requisitos especificados dos nossos clientes.