Oman Botanic Garden

Oman Botanic Garden

The Oman Botanic Garden is a project located on 423 hectares in Muscat, Oman, aiming to cultivate, study and conserve Oman’s native flora in a sustainable way, and to illustrate the plant-related cultural traditions of the country.

The garden will showcase the native plant species in a series of created habitats, from the dry deserts to the rich monsoon cloud forests.

Dextra supplied sonic tubes for Cross Sonic Logging test to determine the structural integrity and homogeneity of concrete within bored piles, drilled 17-30 meters deep into the ground at the garden building site.

The 20,000 tubes were installed with ease thanks to their enlarged bell-mouth design that allows fast and seamless connections.

Once completed, the Oman Botanic Garden will be one of the largest botanic gardens in the world.

Yangon Landmark Development and Peninsula Hotel

Yangon Landmark Development and Peninsula Hotel

The Yangon’s Landmark Development, also called Yoma Central, is a mixed-used development project located in the center of Yangon, the commercial capital of Myanmar.

This project includes a large retail shopping center, offices towers, hotel and luxury apartments. The whole project wraps around the historic headquarter of the Burma Railway Company, which is being renovated as an hotel of the Peninsula chain.

Dextra delivered its rebar couplers and equipment to the contractor join venture BYMA/Taisei (BYMA is a collaboration between Dragages Singapore & Yoma). More than 200,000 Bartec® couplers are being delivered to the site and will be used for rebar splicing from foundations to super structure.

As of end of 2017, this major construction complex marks actually Dextra’s largest ever construction project in Myanmar and the first to receive Bartec® rebar coupler solution. Bartec® system is well fit for Myanmar, as a Type-2 splice it is recommended for large structures in seismic countries such as Myanmar.

For the first phase of the project, Bartec® rebar couplers 20, 25, 28 and 32mm are being used for foundation works in the D-Walls surrounding the area (vertical connections and horizontal slabs reconnections). Couplers are also used in large concrete beams which will support the Peninsula hotel.

The full project, scheduled for completion in 2021, embodies the modern ambitions and rich history of the fast changing country which is Myanmar.

Queen Sirikit National Convention Center (QSNCC) Renovation

Queen Sirikit National Convention Center (QSNCC) Renovation

Queen Sirikit National Convention Center (QSNCC) is a convention center and exhibition hall in Bangkok, Thailand.

The convention center closed for a 15,000-billion-baht renovation on April 26, 2019, after nearly 30 years of hosting various conferences, exhibitions, and international events. It is scheduled to reopen in September 2022 with five times the original venue space.

For this massive renovation, Dextra supplied almost 200,000 Bartec rebar couplers for the connection of d-walls, columns, beams, and core walls.

In November 2022, the convention center will also host the Asia-Pacific Economic Cooperation (APEC) summit.

Yellow Wood 3 Warehouse & Office

Yellow Wood 3 Warehouse & Office

Yellow Wood 3 is an approximately 40,000-square-meter warehouse and office building in Samut Prakan, Thailand.

Groutec S couplers were used to connect precast concrete columns for easy and fast installation on the site. Groutec S has a smaller outside diameter which makes it slimmer and ideal for slim panels and narrow columns, thus making it useful in smaller scenarios.

Bartec couplers were also installed inside the precast columns as rebar splices.

One Nine Elms: changing the skyline of London

One Nine Elms: changing the skyline of London

One Nine Elms is a new mixed-use high-rise project in London, facing the Thames river.

This real estate venture will replace the 44-year-old Market Towers with a 56-storey skyscraper called City Tower and a 42-storeys called River Tower, 18 floors of which will be dedicated to a 173-rooms luxury hotel.

High performance rebar connectors are required in order to reinforce the structure of these two iconic towers: Dextra was entrusted with this job, and provided 70,000 Griptec couplers, well-known for their unrivaled performance in tension, compression, and fatigue conditions.

Supported by high-productivity rebar preparation equipment, Griptec couplers were installed in columns, beams, starter bars for slabs and other parts of the structure.
Furthermore, the homogeneity of concrete within the buildings’ bored piles was tested using the Cross Sonic Logging (CSL) methodology, requiring a transmitter and a receiver to be inserted in parallel water-filled tubes down the pile depth to measure the speed of ultrasonic pulses and ensure the integrity of the foundations.

Dextra’s SONITEC tube facilitated the test thanks to its easy installation into reinforcement cages: 4,000m of ST50 sonic tubes were provided for this project.

Upon completion, anticipated to be in 2022, the City Tower will become one of the tallest residential projects in London and the United Kingdom.

Urban Deca Homes Ortigas

Urban Deca Homes Ortigas

Urban Deca Homes Ortigas is one of the largest residential projects currently developed in the Philippines, involving the construction of 22 residential buildings with 19,000 one- and two-bedroom units on a 13-hectare property in Metro Manila, Philippines.

The developer is expecting to appeal to the young working families of the surrounding areas of Ortigas, Eastwood and Vertis North, offering affordable accommodations starting from as little as 30,000 USD per unit.

Dextra has supplied almost 150,000 Groutec couplers for 20 of the residential buildings: model S25 and S28 are used to connect rebars in load-bearing shear walls.
This typology of mechanical splices is designed to simplify installation of precast concrete elements such as panels or columns.

At the site, connections are made in few seconds by injecting non-shrink grout into the Groutec’s cavity.

The project is expected to be completed by 2022.

Xiao En Cheras

Xiao En Cheras

Xiao En Cheras is a 15 story, 3 basement memorial center in Kuala Lumpur, Malaysia, owned by Xiao En Group, a bereavement care provider who offers professional counselling for grieving families and the Malaysian community.

Dextra Sonitec tubes were installed to test the structural integrity and consistency of concrete within the building’s bored piles using crosshole sonic logging (CSL) testing method.

Sonitec is the steel pipe system specifically designed and manufactured for CSL concrete testing. Since 1999, over 50 million feet of Sonitec CSL tubes have been used on over 400 projects around the world.

Xiao En Cheras memorial center will emphasize not only the functions of traditional funeral services, but also integrate memorial activities, cultural and educational activities.

Trilogy Limassol Seafront

Trilogy Limassol Seafront

Trilogy Limassol Seafront is a prestigious construction project located in the beautiful city of Limassol, Cyprus. It is a massive development consisting of three towers, featuring luxury apartments and offices with private facilities. The construction of Trilogy Limassol Seafront required the use of over 200,000 Bartec couplers and headed bars for slab and column connections.

Bartec BF couplers provide reliable and robust connections. They are designed to join reinforcement bars quickly and easily. The couplers were used for the slab, column, and column-to-slab connections in all three towers of Trilogy Limassol Seafront.

The use of Bartec BF couplers and headed bars dia. 40, grade 500C, ISO 15835 S (Seismic) provides exceptional seismic resistance, a crucial factor for buildings in areas prone to earthquakes. Bartec BF couplers have been tested and certified to meet the highest standards for seismic performance, ensuring the safety and durability of the new landmark beachfront buildings.

Image credit: https://trilogylimassol.com/

The Reef at King’s Dock Condominium

The Reef at King’s Dock Condominium

The Reef at King’s Dock, a prestigious waterfront development in Singapore, has introduced an impressive feature to its residential project. Boasting the country’s first-ever 180-metre floating deck, this luxury development offers residents a truly unique experience. With a total of 429 units spread across 10 residential blocks, the development is situated in the Harbourfront precinct, within the Greater Southern Waterfront area.

In the construction of this remarkable project, Dextra provided the new Groutec F couplers, marking the first introduction of this innovative product in Singapore for precast household shelter connections.

Groutec, a mechanical splicing system specifically designed for connecting precast elements, offers superior strength and reliability. The Groutec F model stands out due to its fully grouted system, which enables the connection of two rebars without the need for any threading procedure, setting it apart from the well-known Groutec L and S models.

The incorporation of the Groutec F couplers by Dextra in The Reef at King’s Dock exemplifies the commitment to innovation and quality within the construction industry. This cutting-edge technology not only enhances the structural integrity of the development but also simplifies and streamlines the construction process.

Expansion of Lai King Building in Princess Margaret Hospital

Expansion of Lai King Building in Princess Margaret Hospital

The expansion project of the Lai King Building, established in 2001 at Princess Margaret Hospital in Hong Kong, aims to enhance ambulatory care services and ensure compliance with infection control and service standards in modern healthcare settings.

The project involves the demolition of the existing structure, construction of a new extension block, renovation and refurbishment of the existing building, construction of link bridges connecting the new extension block and the existing building, as well as external works and landscaping.

Dextra is actively involved in the site formation and foundation works, which commenced in August 2021. Our contribution includes supplying Astec GFRP (Glass Fiber Reinforced Polymer) soil nails with a diameter of 32 for temporary support during excavation. These soil nails are renowned for their lightweight composition, making them easier to handle and install. This characteristic significantly reduces labor requirements and construction time, thereby allowing for greater productivity on-site.

Furthermore, the GFRP material used in these soil nails exhibits high resistance to corrosion, distinguishing it from traditional steel soil nails. This attribute ensures the longevity and durability of the temporary support system, ultimately reducing the need for costly maintenance and replacements in the future.

The exceptional tensile strength of the GFRP soil nails plays a crucial role in effectively restraining the lateral displacement of the soil, thereby minimizing the risk of ground movement and potential collapse.

The construction works for the entire project are expected to be completed by 2026.