Jeddah Tower

Jeddah Tower

Jeddah Tower (previously known as Kingdom Tower) is a landmark skyscraper located along the Red Sea in the North of Jeddah, Saudi Arabia.

The commercial building is designed to pass for the first time the 1-km mark with a total expected height of 1,008 meters, making it the tallest building in the world.

Jeddah Tower will ultimately host a 200-room Four Seasons hotel, serviced apartments, several floors of offices and an observatory. A total of 59 elevators will allow visitors to move between floors.

The tower structure has been engineered by consulting firm Thornton Tomasetti and is built by contractor Saudi Bin Laden, to which Dextra is delivering through the support of its local partner Bahra Steel.

Dextra is proud to deliver 100% of the rebar couplers on the structure, both in the foundations and the superstructure.

Two main types of rebar couplers are used on the structure:

  • For all foundation, columns and vertical connection, standard Bartec couplers are used. These allow fast connection of prefabricated cages.
  • For slab connections, special bridging couplers are also used in order to connect each leg of the U-shape rebar to a column.

The tower is still under construction, with expected completion around 2019.

King Salman Energy Park (SPARK)

King Salman Energy Park (SPARK)

King Salman Energy Park (SPARK) is a new industrial city project being constructed and located between Dammam and Al-Ahsa in the Eastern Province of Saudi Arabia.

The project aims to respond to the ever-growing demand for energy related products and services of the country, including exploration, production, refining, petrochemicals, conventional power, water production and treatment, and drilling.

By the completion of the first phase in 2021, SPARK will be divided into 5 main zones which are industrial zone, dry port and logistics zone, business district, training centers and residential compounds, and commercial activities.

Dextra supplied around 700,000 ASTEC GFRP (Glass Fiber Reinforced Polymer) rebars, model GR45P in straight and bending shape, for buildings and sidewalks.

ASTEC GFRP GR45P rebar provides modulus elasticity at 45GPa and tensile strengths as per ASTM 7205 – 06. It can be used as strengthening material for both new and existing constructions.

Upon the expected completion of the 3rd phase in 2035, it will occupy 50 square kilometers and is anticipated to create 100,000 jobs.

One Za’abeel

One Za’abeel

One Za’abeel by Ithra Dubai is an iconic development that will set new standards and push the limits of design and engineering in Dubai with “The Link,” the world’s largest cantilever dissecting the two buildings providing 360-degree views of the city.

The high-rise mixed-use development incorporates luxury residences, an ultra-luxury hotel, serviced apartments, premium office spaces, a retail podium, and a panoramic sky concourse.

Dextra delivered over 400,000 units of Bartec standard rebar couplers for the connection of rafts, columns, slabs to core walls, as well as for the temporary openings and starter bars.

Bartec weldable couplers are also installed to connect the cantilever’s concrete structures.

Ithra Dubai is anticipating the finalization of the full cladding of all of Tower A, Tower B and The Link by the end of 2021, therefore bringing exterior works on One Za’abeel to completion. Interior construction and fitting will then resume with greater focus.

Source of images: https://gulfbusiness.com/work-progresses-on-one-zaabeel-project-in-dubai-with-tower-b-topped-out/, https://www.cbnme.com/news/ithra-dubais-one-zaabeel-the-link-lifted-to-its-final-position-100-meters-above-ground-level/, https://alemco.ae/projects-archive/one-zaabeel/, https://alec.ae/portfolio-item/one-zaabeel/, https://gulfnews.com/photos/business/another-milestone-with-the-link-now-lifted-at-iconic-one-zaabeel-100-meters-above-ground-level-1.1599134222596 ?slide=1

The Key Rama 3

The Key Rama 3

The Key Rama 3 is a 484-unit high-rise condominium by Land & Houses with sizes ranging from 29 to 61 square meters. The project is located near the Chaopraya river on Rama 3 road, approximately 12 km. from Charoen Krung intersection to Na Ranong junction at Klongtoey in Bangkok, Thailand.

The condominium is a fully precast concrete building with no cast-in-place concrete on its main structural elements.

This type of construction required less workers, materials like rebars, and concrete on the site, which resulted in a shorter construction period and fewer complaints from the neighboring community regarding noise and waste.

Grouted mechanical sleeves were used to join the precast elements, and Dextra Groutec couplers, installed inside shear wall and bearing wall, were an important part of the process.

“The half-grouted mechanism of Groutec L and S sleeves, which have a threaded end on one side, ensured accuracy and reduced mistakes during the grouting process” said Mr. Janeboon Leepipatnavit, Project Director of Taveeporn Technology Co., Ltd., the contractor of this project.

Mr. Janeboon further stated that Dextra was a reliable company with its own facilities in Thailand that could provide immediate support if required.

Zakhr City

Zakhr City

Zakhr City is one of the largest real estate projects in Mecca, Saudi Arabia. This mixed-development project consists of three to four-star hotels, residential towers as well as markets, health centers, police and fire stations. It is designed to accommodate more than 200,000 people.

Since the construction site is located in a mountainous area, a bolting system was fundamental in order to secure the loose rock mass created after excavation. Dextra delivered almost 3,000 steel fully threaded Rock Bolts to stabilize the site.

The rock bolts work by knitting the unstable rock strata together before they can move enough to cause failure. Dextra offers steel and cuttable FRP rock bolts for face bolting or any other tunneling/mining application.

Dextra has been involved from the earliest stages of this project, to provide high quality products and professional support on the construction site.

The iconic crossed-sword design tower in Qatar

The iconic crossed-sword design tower in Qatar

With a unique architectural design inspired by the crossed scimitar swords of the country’s seal, the Katara Towers are set to become the future hospitality landmark of Doha, Qatar.

These 36-story twin arched towers will consist of a luxurious five-star hotel, the first six-star hotel in the country, and private residences.

A man-made satellite beach-front island will complement the project, housing luxury entertainment and recreational facilities.

For this iconic project, Dextra was entrusted with the reinforcement of the concrete structures using 300,000 Bartec rebar couplers.

The couplers were applied inside foundations, columns and core walls to swiftly connect reinforcement bars of various diameters.

Bartec is a parallel-thread rebar coupler that connects two bars in a 3-step process, including the cold-forged enlargement of the bar before the threading.

This patented process guarantees a very high tensile strength, and a bar-break performance.

The tower’s completion is expected in 2021, becoming a focal point for travelers during the 2022 FIFA World Cup.

(photo credit: ProTenders at https://www.protenders.com/en/projects/katara-towers)

MSG Sphere

MSG Sphere

MSG Sphere is an under-construction music and entertainment venue being built in Paradise, Nevada, near Las Vegas Strip. The sphere-shaped venue will have a capacity of 18,000 and will feature LED screens inside and outside of the venue.

The equipped indoor spherical digital display panel will spread across the interior of the venue while an outdoor screen display will show what is going on inside. The venue will be built along with new bars, private suites, a museum and retail space.

The 360-feet tall and 516-feet wide sphere is being built on 18 acres off Sands Avenue between Manhattan Street and Koval Lane. Dextra rebar couplers and headed bars have been used to connect and reinforce columns, core walls and beams of the building’s structure.

Dextra’s Bartec rebar couplers are designed to splice either the same or different diameter bars, whether one bar can be rotated, or not. Bartec spliced bars provide full strength in tension, compression and stress reversal applications. The mechanical splicing solution is accredited by major independent regulatory bodies; for example, the American Society of Mechanical Engineers, UK CARES and Bureau Veritas.

Headed bars are also used to replace hooked bars as end anchorages in congested areas to reduce lapping length for beam-column connections. Standard Bartec mechanical anchorages are circular in shape and are attached by threading onto the rebar.

The construction of MSG Sphere is projected to be completed in 2021.

Sources of images: https://www.fox5vegas.com/news/local/msg-sphere-at-the-venetian-on-track-to-open-in-2021/article_341b5314-ada6-11e9-8bb9-635fb1d12606.html, https://www.reviewjournal.com/business/tourism/msg-sphere-venue-in-las-vegas-moving-forward-with-contractor-1678356/, https://www.reviewjournal.com/?p=2185035?fbclid=IwAR3YwCkehFu8K3luckjLtBg_KObUBrUYt4pBEihylkhDfSNUoENQXMAJDTw

One Bangkok – an integrated mixed-use district

One Bangkok – an integrated mixed-use district

One Bangkok is a new urban development in central Bangkok. This mixed-use project will include offices, retail space, luxury hotels, residences, and cultural and social spaces, with a gross floor area of 1.83 million sq. m. The highlight of the site will be a 430-metre, 90-storey signature tower.

In February 2020, One Bangkok, Co., Ltd, together with CPAC Co., Ltd., and partners: K.C.S. & Associates Co., Ltd., Stonehenge Inter Plc and Italian-Thai Development Corporation Limited completed the largest continuous concrete pouring in Southeast Asia for the mat foundation of one of the first office towers.

The entire process took 33 hours and 15 minutes, with the successful coordination of 547 trucks providing a total 23,725 cubic meters of concrete.

Dextra was behind the connection of 2,200 tons of steel reinforcing mat foundation by supplying 500,000 units of Bartec standard couplers, transition couplers and headed bars.

Bartec standard and transition couplers were applied for various applications which require the joining of reinforcing bars, for example, column to column and beam to column connections.

The transition couplers allowed for the connection of two rebars of different size.

Headed bars were used as an anchor bolt to connect columns to a reinforced concrete foundation. This solution drastically alleviates the congestion of rebars:

Headed Bars as anchor bolts

Concrete foundation anchorage: bent bars vs. headed bars

Upon completion in 2023, One Bangkok will be a new global landmark destination in the heart of the city.

The Amaryllis – Luxury Apartments

The Amaryllis – Luxury Apartments

The Amaryllis is a luxurious residential project with modern amenities located in the premium area of New Delhi, close to the city’s major attractions such as Connaught Place, India Gate, Airport, Rashtrapati Bhawan, and others, making it irresistible to home buyers.

The commitment to completing the project on time was at the heart of this iconic project. As a result, the client was looking to partner with a very dependable coupler agency that has experience executing high-speed projects while delivering a quality product on time.

Thus, Dextra, an ISO 9001: 2015 certified BureauVeritas, is one of the market leaders in the coupler business, having been involved in over 15,000 major construction or industrial projects worldwide and providing unique global experience and expertise.

Almost 1 million pieces of Bartec couplers were delivered to the construction site for the connection of Fe500D, Fe550D and Fe600 grade rebars.

Since the project had stringent schedule and delivery requirements, it was critical to ensure that not only the couplers from Dextra were procured and delivered on site within the specified delivery timeline, but also that the threading equipment installed could cater to an average of 4,000-6,000 ready threads per day.

Furthermore, the main criteria for threading were to use the least amount of equipment possible due to space constraints and to meet the target deliverables. With 3 different size towers connected by a long skywalk, there was an equal amount of pressure on the requirement of threaded rebars to suffice each tower at the same time.

Dextra also supplied Sonitec, an easy-to-assemble and time-saving tube solution, for the CSL (crosshole sonic logging) testing of foundation piles.

The Dextra team in India sent an expert team of supervisors and operators to the site to ensure that the rebar threading and coupler supply were working in tandem. With a strong emphasis on customer satisfaction, all resources were arranged in accordance with the client’s specifications to ensure that there are no delays.

Our goal has always been to provide a quality product to the client, so all quality testing requirements, formalities, and certifications have always been met. Our well-equipped maintenance team was also putting in place the necessary safeguards and provisions to avoid machine breakdowns.

Source of images: https://www.theamaryllis.in/

Expansion of Sha Tau Kok Sewage Treatment Works Phase 1

Expansion of Sha Tau Kok Sewage Treatment Works Phase 1

The Sha Tau Kok Sewage Treatment Works Phase 1 Expansion project stands as a testament to Hong Kong’s commitment to environmental sustainability and efficient wastewater management. It aims to increase the treatment capacity, ensuring that the city’s sewage is processed efficiently and in an environmentally responsible manner. A remarkable feature of this expansion is the use of Groutec S couplers to seamlessly link precast columns of the building.

Groutec is designed for the efficient and easy installation of precast concrete elements, reducing construction time and labor costs while providing full structural connection. For this project, Groutec S diameter 32mm precast couplers have been used to connect precast columns in vertical applications. The Groutec coupler is installed in the bottom element, and then grout is poured by gravity directly into the coupler cavity. This process ensures the structural integrity and longevity of the facility.

Please enter your information

Contact us

   Share your information with us and we’ll get back to you as soon as possible.