Icon Siam complex | ไอคอนสยาม

Icon Siam complex | ไอคอนสยาม

Icon Siam complex, located on the right bank of the Chao Phraya river in the West of Bangkok, is a new multipurpose commercial/residential complex consisting of two highrise buildings and a shopping mall. This new massive project aims to give back its glamour to the banks of the Chao Praya river.

The two towers are expected to reach 280m (SuperLux Tower) and 315m (Magnolia Tower) respectively. The Magnolia Tower will thus be slightly taller than the MahaNakhon Tower, Bangkok’s tallest building since 2015.

Dextra is supplying Thai-Obayashi (contractor of the shopping mall structure) and Italian-Thai (contractor of both towers) with its Bartec rebar splicing solution.

Dextra engineers performed operator trainings and do preventive maintenance directly on site to guarantee maximum output in thread production.

In total, more than 800,000 Bartec rebar couplers and 20,000 Bartec Headed Bars are being used in foundations and superstructure in the following applications:

L-shaped dowel bars (wall-slab connections)

This is a typical application used in foundation D-Walls to avoid protruding rebar. it is also used in the superstructure to allow the sliding formwork to climb up without any disturbance

Substitution of hooked bars with end anchors

When the wall reinforcement is especially congested, the use of Headed Bars (also called end anchors) allows to anchor the reinforcement in the wall without the need to produce hooks.

Double-ended connection in shear-walls

This solution allows to create a continuity inside the column or wall by bridging two horizontal slabs or beams.

Welded couplers for composite structures

Sometimes it is necessary to start reinforcement from the steel structure. In that case, weldable couplers are the ideal solution: Made of a low-carbon steel, they can be welded easily and allow connection to a threaded rebar.

Landmark 81, Ho Chi Minh City

Landmark 81, Ho Chi Minh City

Landmark 81 is a new highrise tower project located on the bank of the Saigon river in Ho Chi Minh City. The project is owned by Vietnamese company Vingroup.

The tower, whose construction started end of 2014, is expected to reach the height of 462 meters, a new height record in Vietnam. Landmark 81 will the 11th tallest tower building in the world.

For this project, Dextra is supplying its renowned
Bartec solution to contractor Coteccons. Bartec solution has been approved by ARUP, owner’s representative consultant, and MACE International, structural consultant.

In total, 250,000 Bartec couplers will be used for vertical rebar connection in the corewall and columns as well as for horitonzal applications such as corewall-to-beam and corewall-to-slab connections.

The use of rebar couplers allows the climbing ormwork to move its way up unencumbered as well as connect slabs starting bars in a very productive manner. Those technologies combined with state-of-the-art concrete monitoring allow very fast construction cycles as short as 35 hours per floor.

For composite applications (steel columns to beams), Dextra also supplied 20,000 weldables couplers.


Example of weldable Bartec coupler on beam

The fast-paced construction site is supported by three sets of Dextra Bartec equipment, installed directly on site. The equipment is maintained by Dextra and operated by Dextra’s distributor in Vietnam, Lotus Greentech.

Concrete works were completed ahead of schedule early 2018.

The Plum condominium | พลัมคอนโด

The Plum condominium | พลัมคอนโด

The Plum Central station is a 38-floors condominium project, made of 2 towers and located near Bang Yai elevated metro station, in the North West of Bangkok. The residential building will host 1,013 appartments.

The Phase 1 of the project (first tower) started in September 2015 and will be completed aroundMarch 2018. The fast pace construction is madepossible by the use of “fully precast” concrete techniques.

The owner of the project Pruksa is operating its own precast plant for this project.

For this project, the objective of Pruksa was to be able to quickly erect precast panels (acting as shear walls) for all levels above ground. Dextra suggested for that purpose the use of Groutec couplers.

Groutec couplers, mounted on rebar Ø25mm previously prepared with Bartec thread. The couplers, installed at the bottom of each precast element, are then cast as part of the precast wall panel element.

After lifting the element to the upper floor at site, reconnection to protruding reinforcement is achieve by injecting non-shrink mortar. It is to be noted that Dextra does not provide the mortar, which instead can be sourced locally, generating significant savings. After injecting grout, bracing around each panel can be removed after 3 days.

For more information about The Plum Central Station and Groutec application, please refer to our case study.

 

ONE Limassol Tower

ONE Limassol Tower

ONE Limassol Tower is a commercial building and a new landmark of Limassol, Cyprus. The project aims to position the island on the international luxury property market, enhancing the attractiveness of the country for foreign investment by offering world-class residence, amenities and services. This will also boost Cyprus’ economy, while increasing local employment opportunities.

At 170 meters above ground with 33 storeys in total, the ONE Limassol Tower is the tallest seafront residential project in Europe. The building will host 83 luxurious apartments, including a three-storey penthouse.

For the reinforcement of this landmark building, Dextra delivered its rebar couplers and bar-end preparation machine sets to the contractor J&P and ACC JV, which is a joint-venture between Joannou & Paraskevaides Group (J&P) and Arabian Construction Company (ACC).

More than 60,000 Bartec couplers were used for rebar splicing in rafts and vertical parts of the building.

The completion of this iconic project is scheduled in 2019.

National Bank of Kuwait – New Headquarter

National Bank of Kuwait – New Headquarter

The new headquarters building of the National Bank of Kuwait is a 300m-tall tower that covers a total floor area of 127,000m2 with a design concept inspired by pearl shells and located in the heart of Kuwait City’s financial district.

The main construction comprises composite concrete and steel, while the cladding on the fins and glass façades is predominantly glass-reinforced concrete.

Dextra took part in reinforcing the concrete structure of the building by providing these solutions:

  • 100,000 Bartec couplers were installed for columns reinforcement, construction joints in raft and slab/beam to core wall connections.
  • 35,000 headed bars act as shear studs in raft.
  • 1,500 Unitec bolted couplers were used to extend existing reinforcing bars that were either not threaded or too short for lapping. It is a convenient solution to connect rebars by using a simple pneumatic wrench at the construction site, without the need of any rebar preparation.
  • Act One | Act Two Tower

    Act One | Act Two Tower

    Act One | Act Two Tower is a premium residential project in the Opera District of Downtown Dubai.

    The project consists of two towers called Act One (52 stories) and Act Two (46 stories).

    With their prime location, these residential towers offer views of the Dubai Fountain and the Burj Khalifa and they are few minutes away from Dubai Metro and from major attractions like the Dubai Mall and the Souk al Bahar.

    For this exceptional residential project, Dextra was entrusted with the reinforcement of the buildings’ structures, including raft foundations, columns, slabs and construction joints.

    150,000 Bartec rebar couplers along with rebar preparation machines were delivered to the construction site.

    Bartec rebar couplers help speed up the construction with a faster and more convenient way of connecting rebars than the traditional rebar lapping method.

    The thread on the rebar can be extended from a half-coupler to a full coupler length, allowing to perform the connection without any bar rotation.

    The project is scheduled to be completed in November 2020.

    Big Box Retail

    Big Box Retail

    This new 4-story retail center has been designed to have the smallest carbon footprint possible, with an innovative optimization of the air-condition load.

    It is located in Jebel Ali, Dubai, UAE with an 81,000 sqm floor area and a leasable area for over 100 retail and concept stores.

    Dextra Groutec couplers contained in the precast panels made the assembly on site easy and fast. More than 1,100 units of Groutec L 25 and 32mm were delivered.

    Groutec is a high-performance precast connection solution which is convenient to set up and fast to install on site by grout injection. It supports the connection of precast concrete columns, panels and beams.

    The first phase of the retail center is set for completion in 2019. The second phase will include a residential area to create a new lifestyle hub in Dubai.

    Trinity Tower La Défense

    Trinity Tower La Défense

    The Trinity Tower in the business district of La Défense, West of Paris, is a new 33-floor and 140-meter-high office tower which will feature over 52,000 square meters of office space.

    The project aims to achieve both social and environmental local impact by adding large outdoor public spaces reconnecting areas previously disconnected by the road. It will also feature green spaces, a rooftop space, openned facades and will achieve a LEEDS certification.

    For this project, Dextra supplied through its French distributor SNAAM Vernon over 18,000 FORTEC® rebar connections.

    Rebar couplers allow to speed up construction pace by providing a fast and safe way to connect rebars: one bar at the time, by bundles or cages. In the case of bundles and cages, those can be assembled off site and simply reconnected by couplers once arrived at the final location.

    The Trinity Tower is aimed for completion in 2019.

    For more information about the availability of rebar splicing solutions in France, please contact our Paris office for more information.

    Floresta Gardens Towers – The Pearl

    Floresta Gardens Towers – The Pearl

    The Floresta Gardens project involves construction of the towers inside The Pearl Qatar.

    The project consists with the construction of mid-rise residential towers and villas within three gated villa communities, including a 2,452-square meter retail center. The precinct has a gross floor space of 267,471 square meters, 145,967 square meters of developable land, and 5,000 residential units.

    In the precast construction of the towers, Dextra Groutec played a significant role. Over 30,000 Groutec L couplers in sizes 20 mm to 40 mm were inserted inside columns for vertical connections on the construction site.

    Groutec precast coupler is an innovative solution for fast and easy connection of precast concrete elements. It is widely used in residential and commercial construction projects around the world.

    Jeddah Tower

    Jeddah Tower

    Jeddah Tower (previously known as Kingdom Tower) is a landmark skyscraper located along the Red Sea in the North of Jeddah, Saudi Arabia.

    The commercial building is designed to pass for the first time the 1-km mark with a total expected height of 1,008 meters, making it the tallest building in the world.

    Jeddah Tower will ultimately host a 200-room Four Seasons hotel, serviced apartments, several floors of offices and an observatory. A total of 59 elevators will allow visitors to move between floors.

    The tower structure has been engineered by consulting firm Thornton Tomasetti and is built by contractor Saudi Bin Laden, to which Dextra is delivering through the support of its local partner Bahra Steel.

    Dextra is proud to deliver 100% of the rebar couplers on the structure, both in the foundations and the superstructure.

    Two main types of rebar couplers are used on the structure:

    • For all foundation, columns and vertical connection, standard Bartec couplers are used. These allow fast connection of prefabricated cages.
    • For slab connections, special bridging couplers are also used in order to connect each leg of the U-shape rebar to a column.

    The tower is still under construction, with expected completion around 2019.