San’ao Nuclear Power Plant 1&2, China

 

San’ao Nuclear Power Plant 1&2, China

 
 

Dextra has successfully supplied 340,000 Griptec couplers for the aircraft impact-resistant shell construction of the San’ao Nuclear Power Plant units 1 and 2, featuring the advanced HPR1000 Hualong reactors.

Griptec, recognized as the only 100% proof-tested splicing system, has gained the trust of over ten nuclear reactors globally, cementing its reputation for reliability and safety in high-stakes environments. The system’s stringent quality assurance processes ensure that each coupler meets the demanding standards required for nuclear applications, providing unparalleled performance and durability.

One of the standout features of Griptec is its high-productivity bar end preparation equipment. This state-of-the-art machinery boasts an impressive processing speed of 30 to 45 seconds per bar end, significantly enhancing construction efficiency. Additionally, the equipment is designed for operation by a single operator, optimizing workforce utilization.

Moreover, Dextra is the first manufacturer of civil construction products with an ISO19443 certified quality management system for nuclear safety. This certification underscores Dextra‘s commitment to the highest standards of safety and quality in the nuclear industry, demonstrating the company’s commitment to excellence and reliability.

The San’ao Nuclear Power Plant project is a key component of China’s strategic initiative to expand its nuclear power capacity, which is vital for meeting the country’s growing energy needs while reducing carbon emissions. By supplying Griptec couplers, Dextra is playing a crucial role in ensuring the safety and efficiency of this project.

Flamanville EPR

Flamanville EPR

Flamanville is the first reactor built after the new generation EPR design (European Pressurized Reactor), after a 100% Chinese design. It will have a capacity of 1.3GWe when entering service in 2019.

Dextra has been present on site since the beginning of the construction works in 2008 and until 2015.

For this challenging project, Dextra has been supplying its Griptec rebar splicing solution through its local fabricator partners. The rebar preparation was supported by an additional machine placed on site.

Griptec is the preferred rebar splicing solution of the nuclear industry thanks to its unique performance level and an automatic testing process which systematically tests all the connections produced as part of its standard cycle: a guarantee that 100% of the connections perform above project requirement.

More than 800,000 Griptec connections have been used on the project, including 400,000 position assemblies, allowing the connection of large diameter rebar without rotating them. The Griptec connections have been installed on the reactor building and APC shell, as well as auxiliary buildings.

In particular, Griptec has been used for the connections of large prefabricated panels.

Four sided panels with Griptec female sleeves and bridging studs

Four-sided panels with Griptec female sleeves and bridging studs

Thanks to its Bridging Assemblies, square panels could be reconnected on four-sided panels while coping for possible misalignment that occurs when lifting the cage.

Akkuyu Nuclear Power Plant

Akkuyu Nuclear Power Plant

Akkuyu Nuclear Power Plant is a nuclear power plant under construction at Akkuyu, in Büyükeceli, Mersin Province, Turkey. It will be the country’s first nuclear power plant.

The four 1,200 MW VVER +3 units, with a total capacity of 4,800 MW, are the world’s first nuclear power plant project implemented on BOO (build-own-operate) principles by a subsidiary of Rosatom – Akkuyu NGS Elektrik Uretim AS (Akkuyu Project Company).

Major construction of the first unit started in March 2018, and it is expected to become operational in 2023.

Construction of the second unit started 2 years later and is anticipated to be completed by 2024, with Unit 3, and 4 to follow in 2025 and 2026, respectively.

Dextra provided more than 700,000 Fortec+ couplers and lock nuts to date, along with bar end preparation equipment, for the use at all 4 reactors and ancillary areas.

Fortec+ is a parallel threaded mechanical splicing system designed especially for nuclear projects for the connection of concrete reinforcing bars from Ø12 to 50 mm (ASTM #4 to #18), in compliance with Eurocode 2, ASME Sec III Div 2.

With the addition of a lock nut, it was fully engaged onto the extended thread of the connecting bar and helps eliminate the residual deformation of the splice.

10 sets of bar end preparation system machines were also delivered at the site. The bar end preparation can be achieved in 3 steps: cutting the end of the rebar, cold forging to enlarge the sawn end of the rebar, and threading.

The Fortec+ system adds a fourth step, consisting of quality testing at the end of the rebar preparation process. The threaded bar end is tensile tested at 90% of the rebar yield strength to guarantee its performance.

Photo credit: https://www.dailysabah.com/business/energy/construction-starts-on-2nd-unit-of-turkeys-1st-nuclear-power-plant-akkuyu?gallery_image=undefined# big (by Energya and Natural Resources Ministry)

Hinkley Point C Nuclear Power Plant

Hinkley Point C Nuclear Power Plant

The Hinkley Point C (HPC) nuclear power station is one of the biggest and most technologically complex projects in Europe.

HPC is the first nuclear power station to be built in the UK in a generation, and its construction requires a highly skilled workforce and the very best construction and engineering solutions.

The HPC Project is located in Somerset, South West England, and will consist of two nuclear reactors capable of generating 3.2GW of low-carbon electricity.

The new power station is being constructed in the same area as the existing Hinkley Point A and B stations. The former ceased operations some time ago, while the latter is decommissioned in 2022.

Dextra was entrusted with the supply of mechanical splices of concrete reinforcement for parts of HPC, particularly the reactor’s aircraft impact protect shell.

More than 2.5 million Griptec couplers have been supplied for the construction of HPC.

Griptec is designed to comply with the most stringent project specifications, and has proven to be a popular system of choice for EPR nuclear power stations, having been used for the construction of the Flamanville 3, Taishan 1, and Taishan 2 power stations.

The Griptec mechanical splice consists of two steel sleeves which are swaged onto the end of the reinforcing bars by a specific machine that was designed and patented by Dextra.

This swaging machine incorporates a systematic, non-destructive pull test. Griptec is the only coupler system that provides an automatic quality control of each processed bar.

Besides Griptec couplers, Dextra is also supplying 3 million headed bars to the project. These are reinforcing bars that are bent on one side and fitted with an anchorage head on the other side and are used for the transverse reinforcement of concrete slabs, rafts, and walls. They allow a much faster and safer site installation than conventional double-bend bars.

When complete, HPC will provide low-carbon electricity for around six million homes.

Fuqing reactors 5 & 6

Fuqing reactors 5 & 6

Fuqing Reactor 5 and 6 are the first reactors of Hualong One, based on a 100% Chinese design. Each reactor has a capacity of 1,000 MW, with operations scheduled to begin in 2019 and 2022.

Dextra has been present on-site since the construction of Reactor 5 began in 2015 and is now involved in Reactor 6.

For this challenging project, Dextra has been supplying its Griptec rebar splicing solution, which is used for rebar splicing in the APC shell.

Griptec is the preferred rebar splicing solution in the nuclear industry due to its unique performance level and automatic testing process, which systematically tests all connections as part of its standard cycle—guaranteeing that 100% of the connections exceed project requirements.

More than a million Griptec connections will be used over the years for these two projects, supported by two Griptec machines installed on-site.

Dextra is also supporting the contractor teams on-site with two Dextra engineers rotating to provide operator training, setup, and preventive maintenance services. This ensures optimal production day and night, especially during peak times.

Taishan EPRs 1&2

Taishan EPRs 1&2

Taishan EPRs are two nuclear reactors of the EPR type, each with a capacity of 1,750 MW, built by Areva and located near Taishan in Guangdong province, China.

Dextra was present on-site from the beginning of construction in 2009 until 2016. Reactor operations were planned to start in 2017.

For this challenging project, Dextra supplied its Griptec rebar splicing solution, which was used in the concrete structure of the reactor.

The Bartec rebar coupler solution, as well as Headed Bars, was also used in other buildings of the project.

Kudankulam Nuclear Power Plant (KKNPP) 3&4

Kudankulam Nuclear Power Plant (KKNPP) 3&4

Kudankulam Nuclear Power Plant (or KKNPP) is the largest nuclear power station in India, situated in Kudankulam in the Tirunelveli district of the southern Indian state of Tamil Nadu.

Two reactors (KKNPP-1 and 2) have been operating since 2013 and 2016, respectively, while two more (KKNPP-3 and 4) are currently under construction following the groundbreaking ceremony held in February 2016.

KKNPP-3 and 4 are pressurized water reactors of Russian design (model VVER-1000/V-412). These reactors are repeated designs of KKNPP-1 and 2, with further improvements based on commissioning and feedback from operational experience.

For the construction of these two units, Dextra supplied 350,000 Bartec couplers to connect rebars in the reactor building, auxiliary building, and spent fuel storage structures.

Bartec is a trusted splicing system, well-known for its high performance in tension, compression, and fatigue. It is widely used in the construction of buildings, bridges, metro systems, nuclear reactors, and more.

Unit 3 is scheduled for completion in March 2023, with Unit 4 following in the subsequent year.

Upon completion, these two reactors will add 2,000 MW of electricity to the existing units, bringing the total site capacity to 4,000 MW.

Sources of images: https://twitter.com/daeindia/status/881395402171404288, https://www.deccanherald.com/content/619873/building-units-3-4-kudankulam.html

Fangchenggang Nuclear Power Plant 3&4

Fangchenggang Nuclear Power Plant 3&4

China is one of the world’s largest producers of nuclear power, and it’s consistently expanding its nuclear power production capacity with new reactors.

Units 1 and 2 of the Fangchenggang Nuclear Power Plant have been operational since 2016, while Units 3 and 4 are currently under construction.

A total of six reactors are expected to be operational at the Fangchenggang site. Units 1 and 2 are both CPR-1000 reactors, while Units 3 and 4 are Hualong One reactors. The planned Units 5 and 6 are also expected to be Hualong One reactors.

Construction of Unit 3 began in December 2015, followed by Unit 4 a year later. Dextra has supplied more than 500,000 sleeves of Griptec coupler for the reinforcement of the APC structure.

Griptec is well known for its reliability and high performance in tension, compression, and fatigue, thanks to its unique design that meets the world’s most stringent project specifications, particularly for nuclear reactor construction.

Rajasthan Atomic Power Project (RAPP) 7&8

Rajasthan Atomic Power Project (RAPP) 7&8

The Rajasthan Atomic Power Project (RAPP) is a nuclear power plant in Rawatbhata, Rajasthan, India, with 6 pressurized heavy water reactor (PHWR) units and a total installed capacity of 1,180 MW.

The plant’s owner and operator, the Nuclear Power Corporation of India (NPCIL), is expanding the plant’s capacity by building 2 additional reactors, Units 7 and 8.

In July 2011, the first pour of concrete (FPC) for the 7th reactor, with a capacity of 700MW, was completed. The unit’s start-up transformer (SUT) was also commissioned.

The 8th reactor, which will similarly have a capacity of 700MW, is scheduled to be finished in December 2021.

Dextra has supplied almost 500,000 Bartec couplers for the reinforcement of reactor buildings, auxiliary buildings, and spent fuel storages.

The 2 PHWR reactors will boost the plant’s existing capacity by 1,400MW, 700MW of which will be allocated to the state of Rajasthan.

Kakrapar Atomic Power Station 3&4

Kakrapar Atomic Power Station 3&4

Kakrapar Atomic Power Station is a nuclear power station in India, which lies in the proximity of Surat and Tapi river in the state of Gujarat.

Unit 3&4 is India’s first pair of indigenously designed Pressurized Heavy Water Reactors (PHWRs) of 700 MW unit size located at Kakrapar in Gujarat, where two units of 220 MW PHWRs are already in operation.

The first concrete pour for Kakrapar 3 and 4 took place in November 2010 and March 2011 respectively, after Atomic Energy Regulatory Board (AERB) approval.

Since then, Dextra had supplied 540,000 Bartec rebar couplers, to connect slabs and columns of reactor and control buildings.

Moreover, Unitec bolted couplers were installed to connect rebars without the need of any thread preparation.

Finally, headed bars were mounted onto the reinforcement bar end, drastically reducing rebar congestion.

The commercial operation of Unit-3 is expected to be in March 2021 while its twin unit, Unit-4, is anticipated to start a year later.

Sources of images: https://en.wikipedia.org/wiki/Kakrapar_Atomic_Power_Station, https://www.nucnet.org/news/kakrapar-3-indigenous-phwr-achieves-first-criticality-7-3-2020, https://www.asiavillenews.com/article/a-look-at-the-kakrapar-3-reactor-54367