Dextra Group | Reliable Connections

 

Port of Neom, Oxagon Port Stage 1 & 2, Saudi Arabia

 
 

As part of Saudi Arabia’s ambitious NEOM development, the Port of NEOM project, also known as the “Oxagon Port Stage 1 & Stage 2,” is set to become the world’s largest floating industrial complex. Located on the Red Sea, the Port of NEOM is poised to revolutionize the region with its innovative design and focus on sustainable development.

Dextra has been selected by Six Construct Saudi and MBL (Oxagon Stage 1) and Saudi Archirodon (Oxagon Stage 2) to provide high-performance solutions for this vital infrastructure. We are supplying 7,800 tons of Marine Tie Bars in various sizes, all in Grade 500. These tie bars, paired with specialized accessories, are engineered for maximum durability and performance, essential for ensuring the 7.5 km long quay wall’s stability and longevity in the challenging marine conditions.

The Importance of Marine Tie Bars

The quay wall forms the backbone of the new port infrastructure, enabling vessel docking, cargo handling, and long-term maritime operations. Marine tie bars are critical to the structural integrity of this massive structure.

Dextra’s Marine Tie Bars, manufactured to the highest standards, are key to ensuring the required lifetime of the marine structure, offering long-lasting support and resilience.

A Partnership for the Future

Dextra’s involvement in the Port of NEOM project underscores our commitment to delivering cutting-edge engineering solutions for large-scale infrastructure developments worldwide. As Saudi Arabia progresses toward its Vision 2030, Dextra’s expertise and high-performance products are playing a pivotal role in shaping the future of this transformative region.

Related Solutions

Expertise

At every moment of your customer journey, Dextra teams dedicate themselves to the production of smart construction solutions that allow our customers to reach higher productivity and safety levels on their construction sites.

Dextra holds physical stocks on several continents, complemented in each country by the local inventories of our distributors. With this extended network, Dextra makes sure our products are always at reach no matter where our partners are.

For solutions that require to be customized, Dextra can also go beyond our standard delivery times and offer accelerated delivery schemes. Consult us for more information.

From 3 major industrial sites located in Bangkok (Thailand), Guangzhou (China), and Pune (India), Dextra completely owns its manufacturing facilities and processes. This allows us to have complete control over the timing of our operations and the quality of the solutions produced.

An independently accredited material testing laboratory, accredited to ISO-IEC17025, is located at Dextra’s main Bangkok factory, allowing the testing of material and products.

Dextra aims to supply products that exceed the most demanding international technical approvals and it is our goal to create maximum customer satisfaction by complying with our clients’ needs and specified requirements.