Dextra Group | Reliable Connections

Search
Close this search box.

Multitowers residential complex in Bangalore

Dream Acres is a large residential complex (81 acres area) located east of Bangalore in India. The ambitious real estate program features 13 towers of 14 floors built in a record time thanks to the use of precast construction methods supported by a purpose-built factory powered by Vollert equipment.

Dextra supplies owner and developer Sobha with the following products and services:

Groutec couplers, used for the swift connection of precast elements either to a footing or directly to another precast element. On Dream Acres, Groutec couplers advantageously splice load-bearing wall panels together, ensuring a high performance connection and speeding up installation compared to more traditional wet in-situ joint methods.

More about Groutec.

Bartec couplers, the high-performance rebar splicing solution is based on two Bartec-threaded bars and a Bartec coupler. Bartec is used across Dream Acres for cast-in-place applications as well as inside the precast elements.

More about Bartec.

Rebar preparation services. Dextra India takes in charge the rebar preparation operations using Bartec equipment which is engineered and manufactured by Dextra. Rebar with Bartec-threaded ends are delivered directly to Sobha according to their schedule. Same bars can be used indifferently with Bartec couplers or Groutec couplers as the two solutions take advantage of the same thread system.

Congratulations to Sobha for already completing the first towers ahead of schedule. Dextra teams are looking forward to more successful precast and in-situ connections on the next phases of the project!

Charity – Two Dextra team running at Peak24 race in Hong Kong

IMG 7157

 

Two teams of 5 runners mixing members of Dextra Guanghzou factory and Hong Kong offices have lined up at the start of Hong Kong’s Peak24 race.

 

This annual 24-miles race raises awareness and funds to fight against modern days human trafficking. As 35 million children and adults are considered to be enslaved around the world today, including in South East Asia, raising awareness of the public opinion is key to promote ethical consumption alternatives and push governments to put an end to those illegal and barbaric practices.

Congratulations to Aileen, Jenny, Shirley, Michelle, Steven, Kelvin, Keefe, Michael, Owen and Navy for running in the name of Dextra for this great event and completing the race with success!

Learn more about modern slavery and Peak24 event.

 

IMG 7163

IMG 7164

Dextra rebar couplers now available for Revit 2017

Autodesk recently released the latest version of Revit, its main 3D drawing and architectural software. 2017 version of the app now includes a new rebar couplers and end anchors tool, directly available from the tool bar.

To support this new feature, Dextra released all its coupler range in Revit Product Family format so it is now very simple to browse and insert couplers into your structure.

All Revit Family attribute files can be downloaded directly from our Download after registration and log in. All instructions are available into the package.

Contact us at This email address is being protected from spambots. You need JavaScript enabled to view it. if you have any question regarding the use of our designer’s tool.

Architectural Bars for Sabah Al-Salem Kuwait University City

Dextra Architectural Bar Solutions are used around the world in a variety of applications: roof structures, façades, pedestrian and road bridges.

Our range is designed with flexibility in mind so that architects and designers can fully express their creativity. No other tension bar range on the market provides such a choice of steel grades, diameters, accessories and surface finishes. It’s all about finding the right product to perfectly match your idea.

One of our latest references in the Middle East is the Sabah Al-Salem Kuwait University City. Tension Bars are anchoring the tent-shaped structures which provide shades to all parking areas.

More than a thousand tension bar systems have been installed across the campus. Steel grade 700 has been systematically preferred in order to use smaller bar diameters (M16 to M33) and accessories. This makes the anchoring less visible and enforces the impression that the “tents” are floating above the ground.

Learn more about tension bar systems

Bangkok MRT Blue Line extension

Bangkok, Thailand.

On the 24th of March 2016, Tunnel Boring Machine successfully broke through Dextra ASTEC Soft Eyes in d-wall of Wang Burapha Station (Burapha/Charoen Krung rd.). Soft Eyes are temporary structures made of cut-able GFRP bars that allow TBMs to pass through, saving much efforts and time for the tunnel creation. More information about ASTEC Soft Eyes.

Rebar couplers for the world’s highest tower

The tower which will soon become the highest building in the world is currently being built in Saudi Arabia. Jeddah Tower (previously called Kingdom Tower) is expected to break the one-kilometer mark, making it 180 meters higher than the Burj Khalifa Tower in Dubai. The tower structure has been engineered by consulting firm Thornton Tomasetti and is built by contractor Saudi Bin Laden.

Jeddah Tower will ultimately host a 200-rooms Four Seasons hotel, service apartments, several floors of offices and an observatory. A total of 59 elevators will allow visitors to move between floors.

To support this engineering prowess, Dextra is proudly delivering Bartec Couplers for both foundations and superstructure packages of the Jeddah Tower. Two main types of Bartec couplers are used: Standard and Bridging Assemblies.

See full project

Worldwide teams gather in Thailand to prepare 2016!

Dextra worlwide teams recently gathered in Bangkok, Thailand, to prepare the roadmap for 2016!

The hard work week was topped by a couple of team building days on the seaside near Pattaya, which included diverse activities such as go kart, sailing on a pirate boat, and, of course, degustation of delicious Thai food.

Teams are now ready for 2016! Way to go Dextra teams!

 

teambuilding2015 2

teambuilding2015 3

teambuilding2015 4

​Dextra Industry and Transport – now establishing ISO 14001

With high concern of environment and safety, Dextra Industry and Transport now establishing our Environmental Management System as widely known as ISO 14001 : 2004.

We are proud to communicate our strong intention of environmental care through our environmental policy as follows:

  • We will comply with relevant environmental regulations, registration and all environmental issue.
  • We will continually improve and prevent pollution by disposing of waste according to regulated means.
  • We will educate, train and share our environmental policy and experience with members of our  organization, customers and vendors in order to encourage environmental awareness and excellence.
  • We will incorporate safe practice in usage, through environmental program, objective and target.
  • We strive in the way not creating any global warming or any pollution to the environment.
  • Our aim on environment activities policies is to ensure that we sell product and services  with concept of preservation of ecology and society.

 

Quality & Safety days in Bangkok

Quality excellence and safety first!

This could be the motto of this 3rd edition of the Dextra Manufacturing Quality & Safety days taking place at our Bangkok factory on the 14 and 17 of November.

 

Nouveau !

For two days, Quality and HR departments team up to organize activities promoting quality awareness and safety practices among office staff and factory operators.

This annual event is also an opportunity for the management to reward those who contributed the most through their daily actions to the production of qualitative products in the safest environment possible.

 

With quality and safety key indicators continuously improving over the last 3 years despite the large increase of our production volume, peaking at more than 1.1 million couplers monthly in 2014, there is no doubt that quality efforts of our manufacturing teams paid off in 2014. Congratulations!

qualitydays crowd

Dextra part of Chinese nuclear history

In July, the first Griptec connections were produced on the site of the 5th reactor of Fuqing nuclear power plant, located in the Chinese province of Fujian.

Dextra is thrilled to be part of the construction of the first reactor to be built after a 100% Chinese design. Griptec connections will be used over the next 5 years, mainly in the aircraft protective shell.

Griptec is the preferred rebar splicing solution of the nuclear industry thanks to its unique performance and an automatic proofing process which tests 100% of the connections.

Griptec has been supplied to nuclear projects like Taishan EPR in China and Flamanville 3 EPR in France.

For more information, please refere to Griptec product page.

Please enter your information

Contact us

   Share your information with us and we’ll get back to you as soon as possible.