Dextra Group | Reliable Connections

Nagpur Metro, Reach-1 (Line 1)

Nagpur Metro, Reach-1 (Line 1)

Nagpur, the second capital of Maharashtra and one of the fastest developing cities in India, is witnessing major growth in terms of infrastructure. The development primarily focuses on connectivity, with the Metro rail playing a major role.

Launched in 2016, the metro project has been widely praised for its speed of execution and the quality of construction.

Within the city boundaries, the project requires the highest safety standards, including seismic analysis for structural integrity throughout its service life.

Project Requirements

The fast-track project features a typical structure for its Line 1 alignment, where the viaducts support two levels of pathways: the lower one for NH-7 and the upper one for the metro rail.

Impact loading due to train movement was a major concern. Since the stretch is always busy with traffic, a solution was required that would not require revising the existing design. Additionally, minimizing delays to this fast-moving project was critical, a concern shared by all stakeholders, especially the General Consultant (GC), who sought to maintain project agility while ensuring a sustainable solution.

Solution

Dextra introduced Shear Key Bars for the priority section, allowing the structure to neutralize seismic forces. This not only helped the contractor complete the work faster but also enabled the client to conduct the trial run earlier than expected.

Related Solutions

Expertise

At every moment of your customer journey, Dextra teams dedicate themselves to the production of smart construction solutions that allow our customers to reach higher productivity and safety levels on their construction sites.

Dextra holds physical stocks on several continents, complemented in each country by the local inventories of our distributors. With this extended network, Dextra makes sure our products are always at reach no matter where our partners are.

For solutions that require to be customized, Dextra can also go beyond our standard delivery times and offer accelerated delivery schemes. Consult us for more information.

From 3 major industrial sites located in Bangkok (Thailand), Guangzhou (China), and Pune (India), Dextra completely owns its manufacturing facilities and processes. This allows us to have complete control over the timing of our operations and the quality of the solutions produced.

An independently accredited material testing laboratory, accredited to ISO-IEC17025, is located at Dextra’s main Bangkok factory, allowing the testing of material and products.

Dextra aims to supply products that exceed the most demanding international technical approvals and it is our goal to create maximum customer satisfaction by complying with our clients’ needs and specified requirements.