Dextra Group | Reliable Connections

Mae Fah Luang Chiang Rai Airport – Renovation & Expansion

Mae Fah Luang Chiang Rai Airport – Renovation & Expansion

Mae Fah Luang Chiang Rai Airport, located in Chiang Rai, Thailand, is a vital transportation hub for the region. Serving as a gateway to popular tourist destinations like Chiang Mai, Chiang Rai, and the Golden Triangle, the airport has recently undergone a significant renovation and expansion project aimed at modernizing its facilities and increasing its capacity. As part of this project, Dextra supplied over 180 tons of dowel bars for use as construction joints in the airport’s runway pavement.

The construction of a runway pavement requires careful planning and preparation. One essential component of the runway pavement is the construction joint, which connects individual concrete slabs. These joints are necessary to ensure that the pavement can withstand the heavy loads of aircraft and endure extreme weather conditions. Without proper construction joints, the pavement may experience cracking, spalling, and other types of damage.

Dowel bars are a critical component of construction joints, as they facilitate load transfer between individual concrete slabs. Typically made of steel, dowel bars are placed perpendicular to the construction joint, allowing for movement between the concrete slabs while providing support and enabling efficient load transfer.

For the Mae Fah Luang Chiang Rai Airport project, Dextra supplied over 35,000 dowel bars, totaling more than 180 tons of steel. The dowel bars were manufactured at Dextra’s facility in Thailand and delivered to the construction site in stages to meet the project’s timeline.

The successful completion of this project has not only increased the airport’s capacity but also improved its safety and reliability, providing a more efficient transportation hub for the region.

Related Solutions

Expertise

At every moment of your customer journey, Dextra teams dedicate themselves to the production of smart construction solutions that allow our customers to reach higher productivity and safety levels on their construction sites.

Dextra holds physical stocks on several continents, complemented in each country by the local inventories of our distributors. With this extended network, Dextra makes sure our products are always at reach no matter where our partners are.

For solutions that require to be customized, Dextra can also go beyond our standard delivery times and offer accelerated delivery schemes. Consult us for more information.

From 3 major industrial sites located in Bangkok (Thailand), Guangzhou (China), and Pune (India), Dextra completely owns its manufacturing facilities and processes. This allows us to have complete control over the timing of our operations and the quality of the solutions produced.

An independently accredited material testing laboratory, accredited to ISO-IEC17025, is located at Dextra’s main Bangkok factory, allowing the testing of material and products.

Dextra aims to supply products that exceed the most demanding international technical approvals and it is our goal to create maximum customer satisfaction by complying with our clients’ needs and specified requirements.