Dextra Group | Reliable Connections

Search
Close this search box.

London Crossrail

London Crossrail

London Crossrail (given the name Elizabeth line in 2016) is the largest engineering project in Europe. It is a major part of Transport for London’s investment programme and the largest addition to the transport system for 50 years.

The project consists in a 118-km east-west rail link across Greater London which will run from Reading and Heathrow in the west to Shenfield and Abbey Wood in the east.

Since 2009, Dextra has delivered more than 600,000 Griptec connections on more than 20 packages including stations such as :

  • Liverpool Street
  • Paddington
  • Bond Street
  • Canary Wharf
  • Royal Oak portal
  • Pudding Mill Lane

Griptec couplers have been used on D-Wall (vertical and horizontal connections), columns and piles (vertical connections).

Segments of Crossrail are expected to start operating progressively, with full completion scheduled for December 2019.

Related Solutions

Expertise

At every moment of your customer journey, Dextra teams dedicate themselves to the production of smart construction solutions that allow our customers to reach higher productivity and safety levels on their construction sites.

Dextra holds physical stocks on several continents, complemented in each country by the local inventories of our distributors. With this extended network, Dextra makes sure our products are always at reach no matter where our partners are.

For solutions that require to be customized, Dextra can also go beyond our standard delivery times and offer accelerated delivery schemes. Consult us for more information.

From 3 major industrial sites located in Bangkok (Thailand), Guangzhou (China), and Pune (India), Dextra completely owns its manufacturing facilities and processes. This allows us to have complete control over the timing of our operations and the quality of the solutions produced.

An independently accredited material testing laboratory, accredited to ISO-IEC17025, is located at Dextra’s main Bangkok factory, allowing the testing of material and products.

Dextra aims to supply products that exceed the most demanding international technical approvals and it is our goal to create maximum customer satisfaction by complying with our clients’ needs and specified requirements.

Please enter your information

Contact us

   Share your information with us and we’ll get back to you as soon as possible.