Dextra Group | Reliable Connections

Search
Close this search box.

Kuwait International Airport Expansion: Terminal II Building

Kuwait International Airport Expansion: Terminal II Building

Kuwait International Airport is the country’s main airport located in the South of Kuwait City. The Hub can currently handle more than 9 million passengers per year, and is home to the famous Kuwait Airlines, Jazeera Airways, and Wataniya Airways.

A new state-of-the-art terminal

This newest infrastructure is part of the Airport’s expansion project, aiming to enhance its status as the State of Kuwait’s gateway. When complete, the Terminal II building will form a triangular mark, a symbol of Kuwait reflecting the country’s rich culture and civilization.
Scheduled for completion in 2020, this striking five-storey terminal building will be able to handle 25 million passengers a year, and will be connected to the first terminal via a tunnel.

From the foundations to the roofs

For this project, the lead Turkish contractor Limak Holding and its Kuwaiti agent Kharafi National have chosen Dextra’s Rolltec rebar coupler solution for rebar splicing in all the building’s concrete structures. Thanks to its rolled-parallel threaded system, as well as its simple preparation and installation process, this splicing solution can help shorten construction cycle times.

For the Terminal’s impressive structure, the contractors have also opted for Dextra’s high-performance smooth Post-Tensioning bar systems. Thanks to its smooth carbon steel bars and its rolled threads, the very high-tensile PT Bar system features high fatigue and strength performance, as well as a high impact resistance.

For more information about our products, both in rebar splicing and engineered bar systems, please contact Dextra team in Dubai.

Related Solutions

Expertise

At every moment of your customer journey, Dextra teams dedicate themselves to the production of smart construction solutions that allow our customers to reach higher productivity and safety levels on their construction sites.

Dextra holds physical stocks on several continents, complemented in each country by the local inventories of our distributors. With this extended network, Dextra makes sure our products are always at reach no matter where our partners are.

For solutions that require to be customized, Dextra can also go beyond our standard delivery times and offer accelerated delivery schemes. Consult us for more information.

From 3 major industrial sites located in Bangkok (Thailand), Guangzhou (China), and Pune (India), Dextra completely owns its manufacturing facilities and processes. This allows us to have complete control over the timing of our operations and the quality of the solutions produced.

An independently accredited material testing laboratory, accredited to ISO-IEC17025, is located at Dextra’s main Bangkok factory, allowing the testing of material and products.

Dextra aims to supply products that exceed the most demanding international technical approvals and it is our goal to create maximum customer satisfaction by complying with our clients’ needs and specified requirements.

Please enter your information

Contact us

   Share your information with us and we’ll get back to you as soon as possible.