Karachi Nuclear Power Plant (KANUPP)

Karachi Nuclear Power Plant (KANUPP)

Karachi Nuclear Power Plant (KANUPP), Pakistan’s first nuclear plant, is undergoing a 2.2 GW capacity extension with two pressurized water reactor units of Chinese design (PWR, Hualong 1).

This historical power plant has been in service with a single 137 MW reactor unit (KANUPP-1) since 1972. It is owned and operated by the Pakistan Atomic Energy Commission (PAEC).

The construction of the KANUPP-2 and KANUPP-3 reactors began in August 2015 and May 2016, with commercial operations scheduled to begin in 2021 and 2022, respectively.

The Dextra Griptec coupler was selected for connecting steel rebars to reinforce the reactor’s concrete shell, which is designed to successfully withstand an aircraft crash (APC).

More than 1 million units of Griptec standard, position, and transition couplers—mainly with a diameter of 40 mm—have been delivered.

Griptec is well-known for its reliability and performance in tension, compression, and fatigue, thanks to its unique design that complies with the world’s most stringent project specifications, particularly for nuclear reactor building construction.

Related Solutions

Expertise

At every moment of your customer journey, Dextra teams dedicate themselves to the production of smart construction solutions that allow our customers to reach higher productivity and safety levels on their construction sites.

Dextra holds physical stocks on several continents, complemented in each country by the local inventories of our distributors. With this extended network, Dextra makes sure our products are always at reach no matter where our partners are.

For solutions that require to be customized, Dextra can also go beyond our standard delivery times and offer accelerated delivery schemes. Consult us for more information.

From 3 major industrial sites located in Bangkok (Thailand), Guangzhou (China), and Pune (India), Dextra completely owns its manufacturing facilities and processes. This allows us to have complete control over the timing of our operations and the quality of the solutions produced.

An independently accredited material testing laboratory, accredited to ISO-IEC17025, is located at Dextra’s main Bangkok factory, allowing the testing of material and products.

Dextra aims to supply products that exceed the most demanding international technical approvals and it is our goal to create maximum customer satisfaction by complying with our clients’ needs and specified requirements.