ズアリ橋 – 西インドのゴアにある印象的な斜張橋とアプローチ

ズアリ橋 – 西インドのゴアにある印象的な斜張橋とアプローチ

The Zuari bridge is a 640-meter long 8-lane cable-stayed bridge laying across the massive river Zuari in Goa. The project also includes 450-meter long elevated approaches with only 2 pillars, along with a 12-kilometer detour. The total value of the project is estimated at $227M.

This new bridge will solve the long commute problems across the two banks of the river. Additionally, with the wider span than the old one, this shall also take care of the growing vehicular traffic which its predecessor built some 30 years back.

With the new bridge, the Public Work Department (PWD) aims to improve road safety and ease traffic flow. Two towers and viewing galleries will also be added for tourism purposes. Being started in 2016, the project is planned to be finished in 2019.

Parallel-threaded rebar couplers for the bridge’s pile cages and pylons

For this massive project in Goa, Dextra has been supplying its popular parallel-threaded rebar splicing solutions Bartec for Fe 500 and Fe 600 Grade steel. More than 110K Bartec couplers are getting installed in Pile cages and Pile caps. This is one of the iconic bridge project, may be one of its kind, with Fe 600 grade steel to be a part of Pile caps and Fe 500 grade steel in piles up to 48 meter deep. Pylon is 103 meter in height and designed with Fe 600 grade steel as well.

Bartec is a full performance mechanical rebar couplers, with no reduction of cross-section area of the bar thanks to their parallel-threads. This characteristic makes the rebar connections a strong point of the structure, and can also simplify the project’s inventory: one type of coupler for both standard and position applications.

The bar-end preparation is also supported by 3 high-productivity machines which prepare each bar in sequence: cutting, cold forging and threading.

Dextra post-tensioning bars for precast elements and segment castings

In addition to Bartec couplers, for the bridge’s precast segments, the contractors also opted for Dextra post-tensioning bar systems. PT bars helps the project’s stakeholders carry out the erection of precast segments and the casting of the segments in time, and in a quality controlled manner.

More than 500 sets of pt bars were delivered to the project as of November 2018. Dextra has made supplies to Dilip Buildcon for Yard applications and Launching.

Also, for phase III of the project, Dextra has made supplies to NRS for PT bars and accessories.

関連ソリューション

専門知識

Dextra チームは、カスタマー ジャーニーのあらゆる瞬間において、お客様が建設現場でより高い生産性と安全性のレベルを達成できるようにするスマート建設ソリューションの生産に専念します。

Dextra は複数の大陸に物理的な在庫を保有しており、各国の代理店の現地在庫によって補完されています。この拡張されたネットワークにより、Dextra はパートナーがどこにいても、当社の製品が常に手の届くところにあることを保証します。

カスタマイズが必要なソリューションの場合、Dextra は標準納期を超えて、迅速な配送スキームを提供することもできます。詳細については、お問い合わせください。

Dextra は、バンコク (タイ)、広州 (中国)、プネー (インド) にある 3 つの主要な産業拠点から、製造施設とプロセスを完全に所有しています。これにより、業務のタイミングと生成されるソリューションの品質を完全に制御できるようになります。

ISO-IEC17025 の認定を受けた独立認定の材料試験ラボがデクストラのバンコク本社工場にあり、材料と製品の試験が可能です。

Dextra は、最も要求の厳しい国際技術承認を超える製品を供給することを目指しており、クライアントのニーズと指定された要件に準拠することで最大限の顧客満足を生み出すことが私たちの目標です。

あなたの情報を入力してください

お問い合わせ

   あなたの情報を私たちと共有してください。できるだけ早くご連絡させていただきます。