Chennai Metro Phase 2, India

 

Chennai Metro Phase 2, India

 
 

The Chennai Metro Phase 2 project is set to redefine urban transportation in one of India’s largest cities, promising enhanced connectivity and efficiency. Playing a pivotal role in the success of this ambitious project, Dextra has supplied an array of cutting-edge construction solutions to meet the project’s demanding structural and safety requirements.

Ensuring Robust Connections with Bartec Rebar Couplers

Dextra supplied nearly 2 million Bartec rebar couplers, essential for creating secure connections across various structural components. These couplers have been utilized extensively in the connections for diaphragm wall (d-wall) caging and slabs, pile cages, piers, and pier caps. By ensuring high-strength rebar connections, Bartec couplers contribute to the overall durability and resilience of the metro structure, particularly important in a densely populated and busy urban environment like Chennai.

Precision Testing with Sonitec CSL Testing Tubes

To ensure the highest standards of concrete integrity, Dextra provided over 80,000 Sonitec crosshole sonic logging (CSL) testing tubes. These tubes facilitate rigorous testing of piles and d-walls, helping to identify potential flaws within the concrete structure. This meticulous testing process enables project engineers to detect and address any irregularities, safeguarding the integrity and longevity of the metro’s foundations.

Supporting Complex Structures with CR Bar 1080 Post-Tensioning Bars

For the support of double-decker piers and the pre-tensioning of U-girders, Dextra supplied 68 CR Bar 1080 post-tensioning bars. These high-strength, fully threaded bars are critical in handling the complex loads and stresses that the elevated sections of the metro will endure. The inclusion of these bars ensures that the metro can withstand heavy traffic and operational demands over time, contributing to the long-term safety and functionality of the infrastructure.

Facilitating Tunnel Boring with GFRP Soft-Eyes

In the tunneling phase, Dextra also provided 42 GFRP soft-eyes, specifically designed for tunnel boring machine (TBM) operations. These soft-eyes allow TBMs to pass through concrete walls smoothly, ensuring safe and efficient tunneling while reducing the risk of structural damage. GFRP’s non-corrosive properties make it an ideal choice for underground construction, where durability and performance are paramount.

Building a Safer, Stronger Future

Dextra’s commitment to supplying top-tier construction materials and solutions underscores its dedication to the Chennai Metro Phase 2 project. As the metro takes shape, Dextra’s innovations contribute not only to the project’s success but also to the future of Chennai’s urban infrastructure, setting new standards in construction excellence and sustainability.

Mumbai Metro Line 2B, India

 

Mumbai Metro Line 2B, India

 
 

Mumbai Metro Line 2B, an essential link connecting several key areas of the city, is a significant infrastructure project aimed at alleviating Mumbai’s traffic congestion and providing efficient public transport. As part of this ambitious project, Dextra has made a valuable contribution, supplying engineered construction materials to ensure the durability and reliability of the structure.

CR Bar 1080 for U-Girder Stressing and Pre-Tensioning

One of the critical components of the project is the elevated section of the metro, which relies on U-girders for support. To enhance the strength and resilience of these U-girders, Dextra supplied its innovative CR Bar 1080 cold-rolled fully threaded post-tensioning bars. These bars, with a diameter of 75mm, are specifically designed to withstand high stress during both U-girder stressing and pre-tensioning operations. The hexagonal nuts provided as part of the system allow for secure fastening and easy adjustment, ensuring precise tensioning to meet the structural demands.

 

Fully Threaded (FT) Bar for Segment Stitching and Temporary Stressing

For segment stitching and temporary stressing operations during the construction of the metro viaduct, Dextra supplied its fully threaded (FT) bars. These bars provide secure connections between precast segments and offer flexibility for adjustments during the stitching process, ensuring that the structural alignment is perfect before the segments are permanently joined.

Unitec Couplers for Rebar Connections

In addition, Dextra supplied Unitec couplers, designed for connecting rebars at construction sites without the need for pre-threading. These couplers offer a convenient and robust solution, allowing for seamless connection of two rebars, ensuring structural continuity and strength without delays in the construction process.

Sonitec CSL Testing Tubes for Concrete Pile Integrity

In addition to supplying post-tensioning bars, Dextra also provided Sonitec Crosshole Sonic Logging (CSL) testing tubes for the integrity testing of the concrete piles supporting the metro structures. These tubes enable highly accurate non-destructive testing of the concrete, allowing engineers to detect any potential flaws or weaknesses in the piles. This testing is vital for ensuring the piles meet the necessary strength and quality standards, thereby supporting the entire metro system safely and effectively.

Enhancing Metro Connectivity with Quality Solutions

As the Mumbai Metro Line 2B progresses towards completion, Dextra’s contributions to the project highlight its role in providing advanced engineering solutions for infrastructure development. The combination of CRバー1080 for post-tensioning, fully threaded bars for segment stitching, Unitec couplers for rebar connection, and Sonitec CSL testing tubes for pile integrity showcases Dextra’s commitment to quality, innovation, and safety in major construction projects.

By contributing to this key metro line, Dextra is playing a part in shaping the future of urban mobility in Mumbai, ensuring that the metro system will be reliable and capable of supporting the city’s growing transportation needs for years to come.

キング・アブドラ金融街

キング・アブドラ金融街

キング アブドラ金融街 (KAFD) は、サウジアラビアのリヤドにある多目的ビジネスおよび住宅複合施設です。この地区は 50 以上のタワーで構成されており、最終的には約 12,000 人の労働人口を収容できるはずです。

同じくドバイに拠点を置くDextra Middle-Eastは、プロジェクトの主請負業者であるサウジ・ビンラディン・グループへのいくつかの建築パッケージの供給に2009年から参加している。

基礎杭

基礎杭に垂直接続を提供するために、Dextra はパートナーの製造業者を通じて人気のある
バーテック 鉄筋カプラー ソリューション、中東の #1 鉄筋接合ソリューション。

Bartec カプラーを補完するものとして、Dextra は基礎杭から突き出るバーの継続に使用される Unitec カプラーも供給しました。 Unitec はバーエンドを事前に準備する必要がないため、請負業者にとって柔軟なソリューションです。必要なのはインパクトレンチだけなので、離れた建築現場でも簡単に作業できます。

いかだと柱

バーテック カプラーは、厚い基礎ラフトの水平接続と突き出た柱の垂直接続にも使用されました。

コアウォールからビームまでの用途

建物の上部構造では、Dextra Bartec カプラーを使用して芯壁からの水平接続を提供し、梁補強の作成に必要な第 2 フェーズのスターター バーを挿入できるようにしました。

サンパウロのシダーデ公園

サンパウロのシダーデ公園

Parque Da Cidade は、サンパウロの南部に位置する複数の塔から成る多目的の緑豊かな建物複合施設です。このプロジェクトには、5 つの企業オフィスタワー、ホテル、住宅ビル、ショッピングモールが含まれています。

このプロジェクトでは、DextraDoBrasil が請負業者 Odebrecht に Rolltec 鉄筋カプラー ソリューションを提供しました。

Rolltec はブラジルで最も人気のある鉄筋スライス ソリューションであり、ラップ スプライスに代わる競争力のある代替手段を提供し、さらに重要なことに、プロジェクトの管理と運用を簡素化する高度なアプリケーションを可能にします。

Parque Da Cidade では、Rolltec 鉄筋カプラーを使用して柱と梁を接続しました。このソリューションは、現場に設置された Rolltec 機器によってサポートされ、Dextra の現地エンジニアによって保守されました。

この用途では、各階の柱補強材内に鉄筋カプラーが水平に並べられ、コンクリートで鋳造されます。 Dextra はカプラーにネジ保護キャップを備えているため、液体コンクリートがカプラーに漏れる危険はありません。

プロジェクトの後の段階では、継続バーをカプラーに直接接続して、梁またはスラブの補強に便利なスターター バーを提供できます。

さらに、Parque Da Cidade では、Dextra が Unitec ソリューションを提供しました。ユニテックは鉄筋の準備が不要なボルトカプラーです。これは、2 つのプレキャスト要素から突き出た鉄筋間の接続を提供するために Parque Da Cidade で使用されました。

ジャムナガル製油所の拡張

ジャムナガル製油所の拡張

インド西部のグジャラート州にあるジャムナガル製油所は、生産能力において世界最大です。 Reliance Industries が所有し、1998 年に就役し、表面積 50 km2 に広がっています。

第 3 段階だけでも、30 万 5,000 トンを超える鉄筋が使用され、10 万人を超えるエンジニアと建設労働者が関与した 36 か月のプロジェクトです。

Dextra は初期の頃から Jamnagar に関与しており、プロジェクトのフェーズ 1、2、および 3 で鉄筋接合ソリューションを提供しました。

特にフェーズ 3 では、3 つの鉄筋カプラー ソリューションが使用されました。

Bartec ソリューションは、現場での鋳造用途、基礎、杭ケージ、柱ケージの棒と棒の接続に使用されました。バーテック カプラーは、混雑したいかだやパイル キャップでバーを接合する方法としても使用されました。

パイプラックの場合は、プロジェクトのプレキャスト工場の一部からプレキャスト要素から構築されました。梁と柱の接続にはGroutecカプラーが使用されています。底部要素に配置され、グラウトが充填されているため、現場での湿式接合の必要性が都合よく回避されました。

image06

 

鉄筋の長さが短すぎて従来のオーバーラップができない他の用途には、Unitec カプラーが使用されました。

Jamnagar の詳細については、ケーススタディをダウンロードしてください。

AVE パレンシア - サンタンデール HSR パッケージ 1 (パレンシア – パレンシア ノルテ) & パッケージ 2 (パレンシア ノルテ – アムスコ)

AVE パレンシア - サンタンデール高速鉄道プロジェクトは、スペインのパレンシアとサンタンデールを結ぶことを目的とした重要なインフラ事業です。このプロジェクトには大規模な鉄道網、高架橋、橋の建設が含まれており、強固で弾力性のある基礎の必要性が強調されています。プロジェクト管理者は、コンクリート杭の構造的完全性を確保することが極めて重要であることを認識し、高度な試験方法を模索しました。

デキストラは、Sonitec Crosshole Sonic Logging (CSL) 試験管を供給することで、プロジェクトの基盤の堅牢性を確保する上で極めて重要な役割を果たしました。これらのチューブは、AVE パレンシア - サンタンデール USR パッケージ 1 (パレンシア – パレンシア ノルテ) およびパッケージ 2 (パレンシア ノルテ – アムスコ) のコンクリート杭の包括的な構造完全性試験の実施に役立ちました。

クロスホールソニックロギングは、コンクリート杭の品質と完全性を評価するために広く採用されている非破壊検査方法です。これには、2 つのアクセス チューブ間のコンクリートを透過する音波の使用が含まれ、エンジニアが材料の特性を評価し、潜在的な欠陥を特定できるようになります。

Sonitec チューブは、クロスホールソニックロギング用に特別に設計されており、構造完全性テスト中に正確で信頼性の高いデータ収集を保証します。これらのチューブは建設中にコンクリート杭に埋め込まれ、音波伝達のためのアクセス ポイントとなります。