デクストラグループ |信頼性の高い接続

検索
この検索ボックスを閉じます。
検索
この検索ボックスを閉じます。

My Enso Loft, Philippines

 

My Enso Lofts, Philippines

 

Dextra has played a key role in the construction of the My Enso Lofts condominium project in Quezon, Philippines, by supplying cutting-edge reinforcement solutions. For this high-rise development, Dextra provided Bartec rebar splicing systems for the raft foundation, columns, and core walls, ensuring robust structural integrity and efficient load transfer across these critical elements.

Additionally, Dextra supplied Groutec S couplers for the precast shear wall and column connections. These couplers are designed for rapid assembly, which accelerated the construction timeline and enhanced the project’s overall structural stability.

By delivering these innovative solutions, Dextra continues to support the construction of resilient and durable buildings in the Philippines, reinforcing their commitment to excellence in infrastructure projects worldwide.

 

Chennai Metro Phase 2, India

 

Chennai Metro Phase 2, India

 
 

The Chennai Metro Phase 2 project is set to redefine urban transportation in one of India’s largest cities, promising enhanced connectivity and efficiency. Playing a pivotal role in the success of this ambitious project, Dextra has supplied an array of cutting-edge construction solutions to meet the project’s demanding structural and safety requirements.

Ensuring Robust Connections with Bartec Rebar Couplers

Dextra supplied nearly 2 million Bartec rebar couplers, essential for creating secure connections across various structural components. These couplers have been utilized extensively in the connections for diaphragm wall (d-wall) caging and slabs, pile cages, piers, and pier caps. By ensuring high-strength rebar connections, Bartec couplers contribute to the overall durability and resilience of the metro structure, particularly important in a densely populated and busy urban environment like Chennai.

Precision Testing with Sonitec CSL Testing Tubes

To ensure the highest standards of concrete integrity, Dextra provided over 80,000 Sonitec crosshole sonic logging (CSL) testing tubes. These tubes facilitate rigorous testing of piles and d-walls, helping to identify potential flaws within the concrete structure. This meticulous testing process enables project engineers to detect and address any irregularities, safeguarding the integrity and longevity of the metro’s foundations.

Supporting Complex Structures with CR Bar 1080 Post-Tensioning Bars

For the support of double-decker piers and the pre-tensioning of U-girders, Dextra supplied 68 CR Bar 1080 post-tensioning bars. These high-strength, fully threaded bars are critical in handling the complex loads and stresses that the elevated sections of the metro will endure. The inclusion of these bars ensures that the metro can withstand heavy traffic and operational demands over time, contributing to the long-term safety and functionality of the infrastructure.

Facilitating Tunnel Boring with GFRP Soft-Eyes

In the tunneling phase, Dextra also provided 42 GFRP soft-eyes, specifically designed for tunnel boring machine (TBM) operations. These soft-eyes allow TBMs to pass through concrete walls smoothly, ensuring safe and efficient tunneling while reducing the risk of structural damage. GFRP’s non-corrosive properties make it an ideal choice for underground construction, where durability and performance are paramount.

Building a Safer, Stronger Future

Dextra’s commitment to supplying top-tier construction materials and solutions underscores its dedication to the Chennai Metro Phase 2 project. As the metro takes shape, Dextra’s innovations contribute not only to the project’s success but also to the future of Chennai’s urban infrastructure, setting new standards in construction excellence and sustainability.

Mumbai Metro Line 2B, India

 

Mumbai Metro Line 2B, India

 
 

Mumbai Metro Line 2B, an essential link connecting several key areas of the city, is a significant infrastructure project aimed at alleviating Mumbai’s traffic congestion and providing efficient public transport. As part of this ambitious project, Dextra has made a valuable contribution, supplying engineered construction materials to ensure the durability and reliability of the structure.

CR Bar 1080 for U-Girder Stressing and Pre-Tensioning

One of the critical components of the project is the elevated section of the metro, which relies on U-girders for support. To enhance the strength and resilience of these U-girders, Dextra supplied its innovative CR Bar 1080 cold-rolled fully threaded post-tensioning bars. These bars, with a diameter of 75mm, are specifically designed to withstand high stress during both U-girder stressing and pre-tensioning operations. The hexagonal nuts provided as part of the system allow for secure fastening and easy adjustment, ensuring precise tensioning to meet the structural demands.

 

Fully Threaded (FT) Bar for Segment Stitching and Temporary Stressing

For segment stitching and temporary stressing operations during the construction of the metro viaduct, Dextra supplied its fully threaded (FT) bars. These bars provide secure connections between precast segments and offer flexibility for adjustments during the stitching process, ensuring that the structural alignment is perfect before the segments are permanently joined.

Unitec Couplers for Rebar Connections

In addition, Dextra supplied Unitec couplers, designed for connecting rebars at construction sites without the need for pre-threading. These couplers offer a convenient and robust solution, allowing for seamless connection of two rebars, ensuring structural continuity and strength without delays in the construction process.

Sonitec CSL Testing Tubes for Concrete Pile Integrity

In addition to supplying post-tensioning bars, Dextra also provided Sonitec Crosshole Sonic Logging (CSL) testing tubes for the integrity testing of the concrete piles supporting the metro structures. These tubes enable highly accurate non-destructive testing of the concrete, allowing engineers to detect any potential flaws or weaknesses in the piles. This testing is vital for ensuring the piles meet the necessary strength and quality standards, thereby supporting the entire metro system safely and effectively.

Enhancing Metro Connectivity with Quality Solutions

As the Mumbai Metro Line 2B progresses towards completion, Dextra’s contributions to the project highlight its role in providing advanced engineering solutions for infrastructure development. The combination of CRバー1080 for post-tensioning, fully threaded bars for segment stitching, Unitec couplers for rebar connection, and Sonitec CSL testing tubes for pile integrity showcases Dextra’s commitment to quality, innovation, and safety in major construction projects.

By contributing to this key metro line, Dextra is playing a part in shaping the future of urban mobility in Mumbai, ensuring that the metro system will be reliable and capable of supporting the city’s growing transportation needs for years to come.

Sonitec EPD Report Published

ソニテック, a crosshole sonic logging (CSL) tube for concrete structure integrity testing solution from Dextra, now has an EPD (Environmental Product Declarations) report and officially listed on the EPD Hub website!

Our previously approved solutions include:

✅ 鉄筋カプラー

✅ GFRP Rebars

✅ マリンタイバー

✅ Steel Ground Anchors

✅ Steel Self-Drilling Rock-Bolts

✅ Steel Combination Bolts

Stay tuned as we work on EPDs for even more of our solutions!

EPD Report for Sonitec

EPD Report for Sonitec

PDF ファイルを表示できません。 ダウンロード その代わり。

マリーナベイサンズ

マリーナベイサンズ

Marina Bay Sands is a spectacular resort featuring more than 2,500 rooms, a casino, many restaurants, topped by a unique sky garden. The project was completed and opened to the public in 2010.

For this project, Dextra supplied between 2007 and 2008 solutions for the reinforcement splicing, as well as Sonitec tubes.

Bartec rebar coupler were used in the foundations for Diaphragm Walls, answering a double challenge.

First rebar couplers may be used vertically to connect D-Wall cages together, allowing to achieve longer cage length.

Then couplers may also be used horizontally as pending connections for slabs. In that case, the coupler is usually installed on a hook bars and cast in concrete. At a later stage, the coupler may be reconnected with second phase rebar to start the slab reinforcement.

Couplers were also used for underground tunnels and ventilation building.

For the foundations, Dextra also supplied more than 100,000 linear meters of Sonitec tubes, which are easy to set up in reinforcement cages and reconnect, increasing the productivity and removing the need for tedious and unreliable welding operations. Once installed, the tubes are firmly in place, supporting without issue the cage lifting and handling.

ドバイ空港

ドバイ空港

ドバイ空港はアラブ首長国連邦の主要空港です。ドバイ市から数キロ北に位置するこの有名な空港は、有名なエミレーツ航空の本拠地です。ドバイ国際空港は、国際旅客数の点で世界で #1 の空港です。

同じくドバイに拠点を置く Dextra Middle-East は、特に 2003 年から 2005 年にかけて、第 3 ターミナルと関連するコンコースの建設を中心に、ドバイ空港建設の数多くのパッケージに携わってきました。

ドバイ内部プロジェクトのために、Dextra は人気の高い製品を提供しました。
バーテック カプラー ソリューション、UAE の #1 鉄筋カプラー ソリューション。ドバイ国際空港では 150 万個のカプラーが使用されています。

上部構造

Bartec カプラーは、柱と梁の間、および壁と梁の間の第 2 段階鉄筋の再接続を可能にする技術的ソリューションを提供しました。

鉄筋カプラーは、鉄筋に一時的な開口部を作成するためにも使用され、人や設備の通過を可能にしました。

基礎

基礎杭にはバーテックカプラーを使用しました。この用途では、カプラーは非常に統合され自動化されたケージ製造プロセスの一部となり、最小限の時間で大径の鉄筋を接続できるようになり、ケージの生産量を最大化できます。

Bartec 鉄筋カプラー ソリューションを補完するものとして、Dextra Sonitec チューブを使用して、ケージの長さ全体に沿った音波チューブの迅速な設置と再接続を確実に行いました。 Sonitec チューブは、プッシュフィットのゴム製口のおかげで取り付けが特に簡単で、溶接されたヘッドのおかげでケージ内に簡単にセットアップできます。長年にわたってドバイ国際空港には 1,800,000 メートルを超えるソニテック チューブが設置されてきました。

バンコク BTS

バンコク BTS

バンコク大量輸送システム (BTS) は、タイの首都バンコクを横断する大規模な都市スカイトレイン システムです。この制度は1999年にスタートしました。

2017 年現在、このシステムは 24 の高架駅と、サイアム中央駅で交差する 2 本の幹線で編成される 37 km の高架鉄道で構成されています。

BTS システムは 2 つの主要路線の延伸工事を進めており、2019 年と 2020 年に路線セグメントと駅が開業する予定です。

基礎

デキストラは長年にわたり、さまざまなパッケージにソニテック チューブを供給してきました。これは、駅やレールの下のコンクリート杭基礎の試験に使用されます。

合計で、Dextra は約 40,000 リニア メートルの Sonitec チューブを供給しました。これは、BTS システム自体の長さと実際に等しい距離です。

パイロン

パイロンの垂直バー接続については、Dextra が提供した
バーテック 繋がり。
バーテック シンプルな鉄筋カプラーを使用してプレハブ鉄筋ケージを簡単に接続できるため、オーバーラップする場合と比較して鋼材を節約でき、現場作業が迅速化されます。

タイでは、ねじ切り作業は便利なバンコク北東に位置する Dextra の工場でサポートされています。請負業者は、すでに準備され、鉄筋カプラーで取り付けられた鉄筋を受け取ります。

AVE パレンシア - サンタンデール HSR パッケージ 1 (パレンシア – パレンシア ノルテ) & パッケージ 2 (パレンシア ノルテ – アムスコ)

AVE パレンシア - サンタンデール高速鉄道プロジェクトは、スペインのパレンシアとサンタンデールを結ぶことを目的とした重要なインフラ事業です。このプロジェクトには大規模な鉄道網、高架橋、橋の建設が含まれており、強固で弾力性のある基礎の必要性が強調されています。プロジェクト管理者は、コンクリート杭の構造的完全性を確保することが極めて重要であることを認識し、高度な試験方法を模索しました。

デキストラは、Sonitec Crosshole Sonic Logging (CSL) 試験管を供給することで、プロジェクトの基盤の堅牢性を確保する上で極めて重要な役割を果たしました。これらのチューブは、AVE パレンシア - サンタンデール USR パッケージ 1 (パレンシア – パレンシア ノルテ) およびパッケージ 2 (パレンシア ノルテ – アムスコ) のコンクリート杭の包括的な構造完全性試験の実施に役立ちました。

クロスホールソニックロギングは、コンクリート杭の品質と完全性を評価するために広く採用されている非破壊検査方法です。これには、2 つのアクセス チューブ間のコンクリートを透過する音波の使用が含まれ、エンジニアが材料の特性を評価し、潜在的な欠陥を特定できるようになります。

Sonitec チューブは、クロスホールソニックロギング用に特別に設計されており、構造完全性テスト中に正確で信頼性の高いデータ収集を保証します。これらのチューブは建設中にコンクリート杭に埋め込まれ、音波伝達のためのアクセス ポイントとなります。

あなたの情報を入力してください

お問い合わせ

   あなたの情報を私たちと共有してください。できるだけ早くご連絡させていただきます。