デクストラグループ |信頼性の高い接続

DEXTRA
検索
この検索ボックスを閉じます。
私のデクストラ
検索
この検索ボックスを閉じます。

Cairo Metro – Line 3

Cairo Metro – Line 3

Since the first 29km segment of the Metro Line 1 opened in 1987, the Cairo Metro project has revolutionized the transit system in the capital.
Currently the whole network comprises 3 operational lines numbered from 1 to 3. Line 3 consists of four phases, and the first segment started operation in 2012.

Three new metro stations were opened as part of the fourth phase of the third line on June 15, 2019, a week before the kickoff of the 2019 African Cup of Nations (AFCON) in Cairo.

Dextra has continuously provided construction solutions since the operation of Line 2 in 2000, delivering since then more than:

-1,400,000 rebar couplers

-7,000 sonic tubes

-60 soft-eyes

Bartec rebar couplers are used for rebar reinforcement of tunnel and station structures on both underground and elevated metro lines as a way to reduce steel congestion and improve tensile connection.

Moreover, the integrity test of the metro foundations using the Cross Sonic Logging (CSL) testing method was facilitated by the usage of SONITEC sonic tubes, designed for easy assembly and installation in reinforcement cages.

Dextra’s ASTEC soft-eyes are made of GFRP rebar to reinforce D-Walls in underground tunnels, which can easily be cut by Tunnel Boring Machine (TBM), resulting in time and money savings.

The project is still ongoing and the fourth line of the Cairo Metro is expected to start operation in 2020.

地下鉄ナーグプール駅、地下鉄ゼロマイル駅

地下鉄ナーグプール駅、地下鉄ゼロマイル駅

マハーラーシュトラ州ナーグプール市で行われている交通機関/駐車場/商業複合プロジェクトのナーグプール地下鉄ゼロマイル駅。市内を北から南に横断する新しい地下鉄線上にあります。ゼロ マイル ステーションは、商業エリアと 430 台収容の駐車場を備えた 12 階建ての建物を組み合わせた地下鉄駅です。

このプロジェクトでは、デクストラは 2017 年に、掘削エリア周囲の地盤を安定させるためのグラウンド アンカーの供給と設置に参加しました。

Dextra は、革新的な ASTEC (FRP) アクティブ アンカー ソリューションを提供しました (AAA)、一時的な用途の場合、たとえ敷地境界線を超えて伸びていたり、将来のトンネルにぶつかったりしても、プロジェクト終了後に地面に残すことができる特別なタイプのグラウンドアンカーです。

実際、FRP アンカーバーの主な利点の 1 つは、アンカーを従来の掘削装置で完全に切断できることであり、最後に力任せに地面から取り外す必要がある鋼製アンカーである従来の取り外し可能なアンカーの最良の代替品になります。プロジェクトの。

Dextra ASTEC アクティブ アンカーは持ち運びが軽く、作業員が最終的な場所まで運ぶことができます。ドリルで開けられた穴に挿入されると、各アンカーにグラウトが注入され、その後 FRP アンカーに接続された従来の PT ストランドを使用して応力が加えられます。追加のプロジェクト管理が必要であり、耐用年数が終了したアンカーの撤去費用が発生する従来の取り外し可能なアンカーとは異なり、設置後もアンカーを地中に残すことができます。

インドにおける Dextra アンカリング ソリューションの詳細については、弊社までお問い合わせください。 ムンバイ事務所.

ホーチミン市地下鉄 – 1 号線 (ホーチミン市地下鉄、ベトナム)

ホーチミン市地下鉄 – 1 号線 (ホーチミン市地下鉄、ベトナム)

ホーチミン市地下鉄 – 1 号線は、都市鉄道管理局 (MAUR) が実施する巨大都市の 109 キロメートルの鉄道プロジェクトの最初の部分です。

大量交通システムが実現すると、ホーチミン市地域は地下鉄6路線でカバーされ、住民や観光客が市内を簡単かつ便利に通勤できるようになり、都市生活の質が向上します。

プロジェクトの第 1 段階では、ベンタイン市場とスオイティエン公園を結ぶ 19.7 キロメートルの鉄道線の建設が行われます。 11駅を含む17.1キロの高架鉄道と、3駅を含む2.6キロの地下線の建設も含まれる。

ベトナム最大の都市の建設のために、Dextra はコンクリート補強材と鉄筋システムの両方のソリューションを提供してきました。
強く補強されたエリアでの鋼材の混雑を軽減するために、請負業者の清水・前田共同運用会社はデクストラのエンドアンカーを選択しました。ヘッド付きバーは、鉄筋フックの簡単な代替品です。

設置はコンパクトアンカープレートを補強バーの先端にねじ込むだけです。このソリューションにより最終的にプロセスが容易になり、コンクリートの品質が向上します。

Grand Paris Express – Line 15

Grand Paris Express – Line 15

The Grand Paris Express is currently the largest transport project in development in Europe.

The new 200-km, 68-station automated railway network consists of a ring route around Paris (line 15) and three additional lines (16, 17 and 18) connecting adjacent neighborhoods.

These 4 new lines will circle the capital and link to 3 airports and many business districts. It will transport 2 million commuters a day. The lines are planned to open in stages, with the full completion of the project scheduled for 2030.

The construction of line 15 started in 2015, with its first section between Pont de Sèvres Métro station and Noisy – Champs RER A station.

Dextra was involved at that stage by providing 100,000 Fortec rebar couplers to connect the columns of the stations’ structure.

Additionally, Dextra supplied 15,000 meters of Sonitec sonic tubes to facilitate the structural integrity testing using the CSL (Cross Sonic Logging) method, thus ensuring the homogeneity of concrete within the deep piles and diaphragm walls that are being constructed for the future underground stations.

The first section of line 15 is scheduled to open in 2020.

深層トンネル下水道システム (DTSS) – フェーズ 2

深層トンネル下水道システム (DTSS) – フェーズ 2

深部トンネル下水道システム (DTSS) は、シンガポールの長期的なきれいな水のニーズを満たすために、シンガポール公共事業委員会 (PUB) によって開発されている中古水インフラ プロジェクトです。

DTSS は、沿岸地域にある 3 つの集中水再生プラント (WRP) に使用済み水を運ぶために深いトンネルを展開しています。

使用済みの水は処理され、さらに精製されてきれいな水となり、ブランド名「NEWater」として供給され、過剰な処理排水は放水管を通じて海に排出されます。

このプロジェクトでは、地下約 50 メートルに直径 6.5 メートル、全長 80 km の 2 本の大型トンネルを建設し、3 か所の集中 WRP に下水を運びます。

プロジェクトは 2 つのフェーズで開発されます。第 1 段階は 2008 年に完成し、既存の重力式下水道から東のチャンギ WRP と北のクランジ WRP まで水の流れを導く、長さ 48 km の深部トンネル システムで構成されています。

第 2 段階では、長さ 30 km の南トンネル、60 km の接続下水道、トゥアス WRP、および 12 km の深海放水路を通ってトンネル システムを西に拡張します。

第 2 段階では、Dextra はトンネル掘削を安定させるために 1,210 個のロックボルトと、TBM 突破のために GFRP ソフトアイを 8 個供給しました。

Soft Eye & Rock Bolt

2022 年に予定されているフェーズ 2 の完了時には、トゥアス WRP の NEWater 工場はシンガポールの総水需要の 55% に貢献することになります。

さらに、Tuas WRP は 1 日あたり 800,000 立方メートルの使用済み水を処理し、世界最大の膜バイオリアクター施設となります。

テルアビブレッドライン、市内初のライトレールシステム

テルアビブレッドライン、市内初のライトレールシステム

The Red Line is the first section of the new Light Rail system currently in development in Tel Aviv, Israel. The line will run from Bat Yam in the southwest to Petah Tikva in the northeast.

The total projected length of the line is 24km, comprising 34 stations, 10 of which are underground, including an interchange with Israel Railways services.

For this project, Dextra is currently supplying products for the construction of six of the underground stations including Bialik, Abba Hillel, Arlozorov, Shaul HaMelech, Yehudit and Allenby.

More than 200,000 Bartec rebar couplers were supplied for diaphragm walls and for the construction of the station boxes.

Dextra also provided 50,000m of Sonitec ST50 to facilitate the testing of the structural integrity of foundation piles using the CSL (Crosshole Sonic Logging) method.
Sonitec is an easy-to-assemble and time-saving sonic tube solution, preferred among piling and general contractors worldwide for more than 20 years.

The line is currently scheduled for completion in October 2021, making it the second underground service operating in Israel.

スンガイ ブロー - セルダン - プトラジャヤ (SSP) MRT 線

スンガイ ブロー - セルダン - プトラジャヤ (SSP) MRT 線

The Malaysian SSP Line is the second line of Klang Valley’s MRT System. The main purpose of this project is to provide a better railway infrastructure and transport system in order to serve Malaysia’s growing population.

Commuting through the heart of the Capital

The Malaysian SSP Line will connect Sungai Buloh to Putrajaya, running through the center of Kuala Lumpur and its suburbs. With its 35 stations, among which 11 will be providing connections to other lines, the SSP Line will allow commuters to transfer with ease to and from existing and planned rail lines.
The rail transit system involves the construction of more than 52 km: 13.5km of underground line and a 38.7km of elevated rail. Once operational, it is expected to have a ridership of 529,000 passengers per day.

Rebar couplers for D-wall and slab

For this large metro project, the contractor joint venture MMC-Gamuda has chosen Dextra’s popular rebar reinforcement solution Bartec, supported by 3 sets of bar-end high-productivity equipment. Approximatively 200,000 pieces have been delivered as of April 2018.
Dextra Bartec have been used for productivity reasons. Couplers were embedded in the diaphragm walls surrounding the underground stations, providing horizontal connection points at a later stage of the project. After excavation, couplers are used to connect bars and start the station’s slabs.

For more information about our solutions in Malaysia, please contact Dextra’s Kuala Lumpur office.

Ahmedabad Gandhinagar metro line India – Phase I

Ahmedabad Gandhinagar metro line India – Phase I

The Ahmedabad-Gandhinagar Metro Rail Project is a new mass-transit rapid transit system in Gujarat, West India. The project is being implemented by Metro Link Express for Gandhinagar and Ahmedabad (MEGA) and aims to meet the city’s growing population while providing commuters with a better transport system.
The total length of the metro’s first phase is 39.26 km, with 33.26km of elevated section and 6 kilometers underground. The metro will connect suburbs in Ahmedabad along east-west and north-south axis, and the route will also be extended to Gandhinagar in Phase-2.
The construction of the first phase, comprising 32 stations connecting the four corners of the city, has been undergoing since 2015. Being expected to operate in 2020, the first trial run of the metro line is scheduled for January 2019.

Steel sonic logging tubes for concrete integrity tests

For the first phase of the Ahmedabad metro, Dextra is involved in supplying its CSL solution Sonitec for the 6-kilometer long viaduct. Sonitec is Dextra’s sonic logging tube system for Cross-hole sonic logging tests. CSL method allows the contractors to verify the homogeneity of concrete in D-walls, bored piles, drilled shafts, barrettes or in concrete piles. Sonitec helps facilitate the assembly and installation of long tubes in reinforcing cages by its Instant Connection characteristic. Thanks to its large bell-mouth, the tubes can be easily connected seamlessly.

Bangkok MRT Pink Line & Yellow Line

バンコクMRTピンクライン&イエローライン

The MRT Pink Line & Yellow Line are elevated mass rapid transit line being built and operated by the BSR joint venture (BTS Group Holdings, Sino-Thai Engineering and Construction STEC, and Ratch Group RATCH) in Bangkok, Samut Prakan, and Nonthaburi Provinces, Thailand.

The MRT Pink Line monorail will be 34.5 kilometers long and have 30 stations. It will connect the northern districts of Bangkok and Nonthaburi with 5 mass transit lines that run along a key east-west transportation route.

The 30.4-kilometer Yellow Line will have 23 stations and will connect 6 other mass transit lines. It will provide mass transit along the heavily congested Lat Phrao road and Srinagarindra road corridors.

Dextra was involved in these 2 MRT line extension projects by providing Bartec splicing systems. More than 440,000 pieces of the couplers, size 16-32mm, were installed inside connecting slabs to connect guideway beams.

In addition, the contractor chose Dextra’s Headed Bars as an alternative to rebar hooks to avoid steel congestion in severely reinforced areas such as beam-column connections. Around 530,000 small headed bars were supplied to the construction sites.

The MRT Pink Line is expected to be operational by June 2022, with the Yellow Line following a year later.

ウダンプール - スリナガル - バラムラ鉄道リンク (USBRL)、インド

ウダンプール - スリナガル - バラムラ鉄道リンク (USBRL)、インド

Udhampur-Srinagar-Baramulla Rail Link (USBRL) is a gigantic infrastructure project by Indian Railways in the Himalayan Mountains, designed to provide rail connectivity to Jammu and Kashmir valleys. This project aims to enable access to the rail network from all parts of the country and connect faraway areas with the rest of India, in response to Prime Minister’s vision of a New India by 2022.

The project is divided into three sections – the 25 km Udhampur-Katra, the 129 km Katra-Qazigund and the 118 km Qazigund-Baramulla tracks. Parts of the lines have already been completed and made operational.

For this massive project, Dextra supplied 3,000 sets of Self-Drilling Rock Bolts to stabilize loose rock mass after excavation.
The Self-Drilling Rock Bolt is a bolting solution for unstable ground conditions and fractured rock formations. The loosening of the rock strata is prevented by drilling a hole in the rock, placing standard sacrificial drill bit and a hollow bar (made of steel or FRP): cementitious grout is then injected into the hollow bar.

As the mega infrastructure project nears completion, the USBRL will link Jammu with Kashmir, opening up a new page for the Indian transportation system.

あなたの情報を入力してください

お問い合わせ

   あなたの情報を私たちと共有してください。できるだけ早くご連絡させていただきます。