デクストラグループ |信頼性の高い接続

検索
この検索ボックスを閉じます。
検索
この検索ボックスを閉じます。

ウダンプール - スリナガル - バラムラ鉄道リンク (USBRL)、インド

ウダンプール - スリナガル - バラムラ鉄道リンク (USBRL)、インド

Udhampur-Srinagar-Baramulla Rail Link (USBRL) is a gigantic infrastructure project by Indian Railways in the Himalayan Mountains, designed to provide rail connectivity to Jammu and Kashmir valleys. This project aims to enable access to the rail network from all parts of the country and connect faraway areas with the rest of India, in response to Prime Minister’s vision of a New India by 2022.

The project is divided into three sections – the 25 km Udhampur-Katra, the 129 km Katra-Qazigund and the 118 km Qazigund-Baramulla tracks. Parts of the lines have already been completed and made operational.

For this massive project, Dextra supplied 3,000 sets of Self-Drilling Rock Bolts to stabilize loose rock mass after excavation.
The Self-Drilling Rock Bolt is a bolting solution for unstable ground conditions and fractured rock formations. The loosening of the rock strata is prevented by drilling a hole in the rock, placing standard sacrificial drill bit and a hollow bar (made of steel or FRP): cementitious grout is then injected into the hollow bar.

As the mega infrastructure project nears completion, the USBRL will link Jammu with Kashmir, opening up a new page for the Indian transportation system.

アンダーソン ロード採石場

アンダーソンロード採石場 – 地下道

アンダーソン ロード地下道は、アンダーソン ロード採石場で行われている大規模な土地修復プロジェクトの一部です。九龍の北東に位置する採石場の広大な土地は、最終的には12ヘクタールの面積に2万5000人もの人々が住むために使用される予定だ。

採石場の新時代

60年以上にわたって骨材、アスファルト、石材、コンクリートをインフラプロジェクトに供給してきたこの広大な採石場跡地は、香港の最新の住宅地と商業地に生まれ変わることになる。 ARQ は 12 ヘクタールの面積に 25,000 人を収容できる予定です。

Dextra の地盤工学およびトンネル工事用のスチールおよびロックボルト

アンダーソン道路地下道は、請負業者 Chun Wo、STEC、Vasteam JV の合弁会社が主導し、コンサルティング会社 Aurecon が監督するトンネル プロジェクトです。
このプロジェクトのために、Dextra はトンネルの屋根の支持に使用される鋼製ロックボルトを下請け業者の Shin Yue Engineering Company Ltd. に供給しました。このプロジェクトでは、1,500 本以上の鋼製岩ダボ、100 本の格子桁、500 本の鋼杭の設置に成功しました。

Dextra がこのプロジェクトに選ばれたのは、その広範な内容が理由です。 地盤工学とトンネル工事 香港での豊富な経験を持ち、過去 20 年間にわたり香港で多数の大規模な道路および地下鉄トンネルのプロジェクトを提供してきました。
香港およびマカオにおける当社の地上工学ソリューションの詳細については、当社までお問い合わせください。 香港事務所.

MRT オレンジライン (タイ文化センター – ミンブリー)

MRT オレンジライン (タイ文化センター – ミンブリー)

バンコクの MRT オレンジ ラインは、タイ都市高速交通局 (MRTA) が計画している高速交通路線の 1 つです。この全長 39.5 キロメートルの鉄道路線の主な目的は、バンコクの西部、中部、東部間の接続を改善し、結果としてタイの首都の交通渋滞を緩和することです。このプロジェクトはタイの国民経済を刺激し、インフラを改善する計画の一環でもある。
MRT オレンジ線は、バーンクンノンからタイ文化センターまでと、タイ文化センターからミンブリーまでの 2 つのセクションに分かれており、22 の地下鉄駅と 7 つの高架駅で構成されています。

トンネル建設用 Dextra GFRP ソフトアイ

タイ文化センター – ミンブリー セクションでは、請負業者であるイタリア・タイ開発合弁会社と CKST が、FRP ソフトアイのトンネル掘削用に Dextra のターンキー ソリューションを 40 ユニット以上選択しました。
独自の切断技術でよく知られているガラス繊維強化ポリマー (GFRP) ソフトアイは、トンネルボーリングマシン (TBM) の侵入と侵入を容易にします。実際、これは、追加の人員と設備の動員が必要となる従来の鉄筋補強に代わる最良の方法です。

クロスホールソニックロギング (CSL) テスト用の Dextra Sonitec

深い基礎のコンクリートの完全性を検証するために、イタリアとタイの開発、CKST JV、ユニーク エンジニアリングは、Dextra のクロスホール音響検層チューブ (Sonitec) も選択しました。これらの CSL チューブはいくつかの直径で入手でき、建設速度を加速するために簡単かつ迅速に扱えるように特別に設計されています。 2022 年 3 月の時点で、30,000 本を超えるチューブがプロジェクトに納入されています。

地下鉄の D ウォールに適用される完全な鉄筋接合ソリューション

地中連続壁 (D ウォール) の補強を最適化するために、Dextra の機械式鉄筋接合システムの 1 つである Bartec が設置されました。 Bartec は、取り付けが簡単な特性により、標準カプラーを位置スプライスにも使用できるため、プロジェクトのスケジュールを加速し、在庫を削減するのに役立ちます。 100 万個を超える Bartec カプラーが現場に納入されました。

さらに、構造物の混雑した部分のフックの代替として、約 7,000 本の頭付きバーが鉄筋の端に適用されました。

タイで利用可能な当社のソリューションの詳細については、当社までお問い合わせください。 バンコク事務所.

High Speed 2 (HS2), United Kingdom

High Speed 2 (HS2), United Kingdom

 

The UK’s ambitious High Speed 2 (HS2) project, encompassing 140 miles of track, four state-of-the-art stations, two depots, 32 miles of tunnel, and 130 bridges, is set to redefine sustainable travel and foster economic regeneration for generations to come. Dextra is proud to play a vital role in this transformative endeavor by supplying グリップテック couplers to various HS2 sites, ensuring the structural integrity and resilience of this extensive rail infrastructure.

Picture: Victoria Road Crossover Box Site

 

Our グリップテック couplers, known for their high-performance rebar connections, have been deployed across numerous key sites, including the Long Itchington Wood Tunnel, Old Oak Common Station, Victoria Road Crossover Box, Colne Valley Viaduct, Chiltern Tunnel and Ventilation Shafts, Thame Valley Viaduct, Curzon Street Viaducts, Edgcote Viaduct,  Canterbury Road Works Headhouse and Ventilation Shaft, and many more. The couplers have been integral in connecting rebars for primary collars, piers, base slabs, crown beams, buttresses, and deck segments, ensuring robust and reliable structural connections.

Picture: Chiltern Tunnel and Ventilation Shafts Site

 

Spotlight on Long Itchington Wood Tunnel: A Legacy of Environmental Responsibility

One of the largest construction sites for HS2 is at Long Itchington Wood, where a 1-mile twin bore tunnel is being built. The tunnel serves a critical purpose: preserving the ancient woodland of Long Itchington by diverting the railway underground. To facilitate the launch of the tunnel boring machine (TBM), a massive excavation at the north portal site was necessary. This involved the removal of approximately 250,000 cubic meters of material, which was then repurposed to form environmental embankments along the mainline.

Dextra supplied nearly 20,000 グリップテック standard and position couplers in diameters ranging from 12mm to 40mm for the tunnel construction. These couplers were used in the diaphragm walls, pile caps, and portals, ensuring the durability of connections in the deep and challenging excavation environment. The グリップテック system, comprising one male and one female sleeve extruded onto the rebar, facilitated efficient and secure rebar connections that are essential for large-scale projects like HS2.

グリップテック female sleeves were initially installed at the top of the diaphragm wall. Position assembly—a technique that accommodates non-rotatable rebars—was employed to connect the female sleeves to male sleeves on L-shaped bars within the roof slab. This reinforcement approach was extended to pile caps and later stages of construction, where the couplers reinforced the crown beam by connecting with bent bars through lap length.

Picture: Long Itchington Wood Tunnel Site

 

Empowering Infrastructure with Technological Innovation

As HS2 progresses, Dextra’s グリップテック couplers continue to enable rapid and reliable rebar connections, supporting the project’s commitment to quality, safety, and sustainability. By contributing advanced construction solutions, we are proud to be part of HS2’s legacy of environmentally responsible travel, economic regeneration, and technological innovation. Our role in HS2 reflects Dextra’s dedication to advancing infrastructure through high-performance products that meet the needs of complex and large-scale projects.

The High Speed 2 project is poised to transform the UK’s transportation landscape, and with Dextra’s グリップテック couplers in place, the rail network is set to endure and thrive for generations to come.

カイロモノレール

カイロモノレール

カイロ モノレールは、エジプトのカイロにある 2 線のモノレール高速輸送システムで、現在建設中です。プロジェクトが完了すると、この 2 つの路線により、新行政首都および 10 月 6 日市からカイロ都市圏までの初の公共交通機関が提供されることになります。

新行政都市と東カイロ間の54キロは60分、10月6日市とギザ間の42キロは42分かかる。

Dextra は、2 本の補強バーの接続用に 300,000 個を超える Bartec 標準およびブリッジング カプラーを供給しました。 Bartec は設置が簡単で、専門的な熟練労働者を必要としないため、現場での労力と型枠コストが削減され、現場の安全性が向上します。

約 400,000 本の Bartec 頭付きバーも、コンクリート部材や接続部のストレートバーまたはフック付きバーの代わりに設置されました。

さらに、建設現場では、事前に準備されていない(つまり、ネジがない)2 本の鉄筋の接続のための修復作業で、ユニテックのボルト式カプラーを使用しました。

このシステムの第 1 段階は 2022 年に一般公開され、続いて 2023 年に第 2 段階が公開されます。

フォレストフィールド エアポート リンク

フォレストフィールド エアポート リンク

The Forrestfield Airport Link is a rail infrastructure project lolcated in Perth, Western Australia. The 8.5-km line will connect the existing Midland Line to Perth International Airport and further to the eastern suburbs. The project features two twin-tunnels bored with Tunnel Boring Machines (TBMs) which move up to 26 meter underneath the bed of Swan river, highways and Perth Airport, adding three new stations to the city’s transportation network: Belmont, Airport Central and Forrestfield.

Forrestfield metro plan

For the tunnel boring packages, Dextra supplied a total of 10 GFRP Soft-Eyes between 2016 and 2017 (two for Airport Central Station, two in Abernethy, four in Belmont and two in Bayswater) to the contractor JV of Salini Impregilo and NRW Salini Impregilo. Soft-Eyes are rebar cages made mostly of Glass-Fiber Reinforced Polymer (GRFP) bars and some steel rebar. Soft-Eyes can be cut by the TBMs and allow faster equipment breakthrough, saving precious time while avoiding to damage the TBM heads.

Dextra also supplied a total of 65,000 グリップテック connections for the station works. Griptec is distributed in Western Australia by Dextra’s partner InfraBuild Construction Services. They offer the complete service to the contractor: Cutting the rebar, preparing the bar ends with Griptec sleeves and bending them for final installation on site. This allows the contractor to achieve faster cycle times in rebar connection on site .

Sonitec, Dextra’s steel tubes for Crosshole Sonic Logging tests (to check concrete integrity in bored piles) were also supplied.

The Forrestfield-Airport Link will operate in 2022.

For more information about our solutions in Australia, please consult our バンコク オフィス

ブリュッセル地下鉄3号線

ブリュッセル地下鉄3号線

ブリュッセル メトロは、ベルギーの首都ブリュッセルの大部分を運行する高速交通システムです。従来の地下鉄 4 路線と地下鉄以前の 3 路線で構成されています。

3 号線は、南北軸トンネルを使用して、南のチャーチルから北のエスプラネードまで市内中心部を走るトラム路線です。全行程は10.3kmとなります。

既存の 2 つの地下トンネルを接続するために、ブリュッセル北駅の地下に長さ 150 メートルの新しいトンネルが掘削されています。これは新しい地下鉄リンクの重要なコンポーネントとなるでしょう。

デキストラは、CSL 試験法を使用した基礎の完全性試験を容易にするために発明されたチューブ ソリューションであるソニテックを 3 号線の建設現場に供給しました。13 キロメートルのチューブが長さ 18 メートルの杭ケージに設置されました。

Sonitec システムは、補強ケージ内の長いチューブの組み立てと設置を容易にすることのみを目的として設計されています。

カイロ地下鉄 4 号線 – フェーズ 1

カイロ地下鉄 4 号線 – フェーズ 1

カイロ メトロは、エジプトのカイロ都市圏を走る高速交通システムです。これはアフリカに建設された 3 つの本格的な地下鉄システムのうちの最初のものであり、アラブ世界でも最初のものでした。ヘルワンとラムシス広場の間の 29 キロメートルの距離をカバーする 1 号線として 1987 年にサービスを開始しました。

カイロ地下鉄には現在 74 の駅があり、そのうち 3 駅が乗換駅で、全長は 89.4 キロメートル (2020 年 8 月現在) です。システム内には 3 つの営業路線があり、1 から 3 まで番号が付けられています。

新しい4号線はマクラム・エベイド駅から環状道路近くの警察アカデミー駅まで走り、ドクター・ハッサン・エル・シェリフ通りとアハメド・エル・ゾモール通りに沿ってボーリングトンネルが続く。全長は24キロになります。建設は2019年第3四半期に開始され、2024年に完成する予定です。

Dextra は、ダイヤフラム壁の補強用に 450,000 個の Bartec+ カプラーと 42 個の GFRP ソフトアイを供給してきました。

Bartec+ は、直径 12 ~ 50 mm (ASTM #4 ~ #18) のコンクリート鉄筋を接続するための平行ねじを備えたメカニカル スプライシング システムです。ねじ付きバーエンドは、鉄筋降伏強度 90% で引張試験が行われています。

Dextra の GFRP ソフトアイは、従来の鉄筋の代わりに切断可能なガラス繊維強化ポリマー (GFRP) 補強材を使用する統合ターンキー ソリューションで、トンネル ボーリング マシン (TBM) の貫通が容易に地中連続壁を通過できるようにします。 。

ラクナウ地下鉄 – フェーズ 1

ラクナウ地下鉄 – フェーズ 1

ラクナウ メトロ プロジェクトは、北インドのウッタル プラデーシュ州の人口増加に対応するため、また既存の鉄道システムで接続されていない地域に対応するために建設されます。全長 35 キロメートルの鉄道システムは 22 の駅で構成され、そのうち 19 駅は高架駅になります。
プロジェクトの第 1 段階は、ラクナウの中心部を通過してラクナウの 4 隅を結ぶ 2 つの鉄道路線 (南北および東西回廊) の建設で構成されています。ラクナウ地下鉄鉄道公社 (LMRC) によって実施されるフェーズ 1 は、長さ 22.88 キロメートルの南北通路の建設で構成されます。優先区間はトランスポート・ナガルとチャーバーグを結ぶ8.5キロメートル。
ラクナウ地下鉄が運行されれば、市内の交通が緩和され、通勤者の移動時間も短縮されます。

エティハド鉄道

エティハド鉄道

エティハド鉄道は全長1,200キロメートルの鉄道プロジェクトで、アラブ首長国連邦(UAE)初の国営貨物・旅客鉄道ネットワークとなり、7首長国を結び、首長国およびGCC諸国全体の貿易と社会発展を促進する。

この鉄道プロジェクトは、首長国の都市部および農村部全体にわたる貨物および旅客輸送の持続可能な代替手段となることが期待されています。約1,600万人の乗客と5,000万トンの貨物を運ぶことが見込まれています。道路交通の排出量削減に大きく貢献します。

エティハド鉄道のネットワークは西のカタールとサウジアラビアの国境に達しています。西部区間はグウェイファト経由でサウジアラビアに接続し、東部区間はアル・アイン経由でオマーンに接続します。この鉄道路線はアブダビ、シャルジャ、ドバイを結び、首長国を横断しています。その後、北部首長国とフジャイラへ向かいます。

鉄道網は 3 段階で構築されます。 2016年に開通した鉄道網の第1段階は、アル・ルワイスとシャー間の全長266キロメートルの西側区間である。ルワイスとハブシャンを結び、次にハブシャンとシャーを結びます。

第2段階ではアブダビとドバイを結びます。ジェベル・アリ、ムサファ、ハリファの港とも結ばれています。第 3 段階では、首長国連邦北部の接続が必要となります。第 2 フェーズと第 3 フェーズは 2024 年に完了する予定です。

デキストラは現在、アブダビの200kmの本線とハリファ港までの40kmの支線、ドバイの78kmの本線とジェベルまでの20kmの支線の建設を含む、鉄道ネットワーク建設の第2段階向けにさまざまなエンジニアリングソリューションを提供しています。アリ港、シャルジャからフジャイラまでの98kmの幹線とトーイーンまでの29kmの支線、および関連施設。

これらのソリューションは鉄道トンネル建設現場に納入されました。

  • コンクリート構造物補強用の Bartec カプラー 110,000 個。
  • 基礎杭のCSL(クロスホール音波検層)試験用のSonitecチューブ32,000本。
  • 岩盤掘削を安定させるための 69,000 個の鋼製ロックボルト。
  • GFRP (ガラス繊維強化ポリマー) ロックボルト 400 個。
  • トンネル頭首を安定させるための 660 本の傘パイプ。
  • トップ画像の出典:https://filipinotimes.net/news/2019/12/19/coming-soon-rail-network-linking-dubai-fujairah-khorffakan-ports/

    あなたの情報を入力してください

    お問い合わせ

       あなたの情報を私たちと共有してください。できるだけ早くご連絡させていただきます。