ラクナウ地下鉄 – フェーズ 1

ラクナウ地下鉄 – フェーズ 1

The Lucknow Metro project is built to serve the growing population of Uttar Pradesh, North India, as well as to serve the areas that are not connected by the existing rail system. The 35km rail system comprises 22 stations, of which 19 will be elevated.

The first phase of the project consists construction of 2 rail lines (North- South and East-West corridor), connecting the four corners of Lucknow by running through the heart of the city. Being implemented by Lucknow Metro Rail Corporation (LMRC), the Phase 1 comprises the construction of 22.8km long North-South corridor.

The priority section is the 8.5 kilometers linking Transport Nagar to Charbagh.
ラクナウ地下鉄が運行されれば、市内の交通が緩和され、通勤者の移動時間も短縮されます。

ライトレール鉄道 3 号線

ライトレール鉄道 3 号線

The 37km-long Light Rail Transit Line 3 (LRT3) is a light rail line under development in Malaysia. It includes a 35km viaduct and a 2km underground tunnel which will link Bandar Utama with Johan Setia in Klang.

クアラルンプール/クランバレー都市圏 (GKL/KV) の陸上公共交通マスタープランに沿って開発された LRT3 は、GKL/KV の西回廊への鉄道接続を拡張する上で戦略的な役割を果たします。

Dextra provided cuttable Glass Fiber Reinforced Polymer (GFRP) soft-eye solutions, installed in diaphragm walls of escape shafts, in order to facilitate the underground tunnel breakthrough by the Tunnel Boring Machines (TBM).

LRT3 プロジェクトは、クランからペタリン ジャヤまでのクラン バレーの西回廊沿いの接続性を改善し、交通渋滞を緩和し、経済成長を促進することにより、線形全域で 200 万人の人々にサービスを提供すると期待されています。

工事完了は2024年2月の予定。

パナマ地下鉄3号線

パナマ地下鉄3号線

パナマ地下鉄 3 号線は、パナマ地下鉄プロジェクトの一環として開発されている全長 34 km のモノレール路線です。これはパナマ運河の拡張以来、同国最大のプロジェクトとなる。

この路線により、パナマ オエステ県とパナマ県が結ばれ、平均所要時間は 90 分から 45 分へと半分に短縮されます。このモノレールシステムは、アメリカ大陸で初めて日本の技術を導入したものとなる。

Dextra supplied 260,000 バーテック couplers for the elevated monorail structure’s piling column and precast beam connection.

ソニテック tubes were also used to examine the concrete integrity of bore-piles using the crosshole sonic logging testing method.

この路線は2025年半ばに運行開始が予定されており、パナマ・オエステ県の50万人以上の住民に恩恵をもたらすことになる。

画像クレジット: Línea 3 del Metro de Panamá YouTube チャンネル、www.elmetrodepanama.com

リマ地下鉄

リマ地下鉄

リマ地下鉄はペルーの高速交通システムで、現在リマ南部のビジャ エル サルバドル地区と市北東部のサン ファン デ ルリガンチョを結んでいます。地下鉄 1 号線は 2011 年に開業し、26 駅、全長 34.6 キロメートルで、アメリカ大陸最長の地下鉄路線です。

デクストラ is proud to contribute to the construction of Metro Line 2 and the initial phase of Line 4, both of which commenced simultaneously in 2016. Line 2, a 27-kilometer fully underground transit route, will seamlessly connect Lima’s Ate district with the Callao region. Meanwhile, the first 8-kilometer segment of Line 4 will serve as a crucial link between Line 2 and the Jorge Chávez International Airport station, enhancing connectivity for commuters and travelers alike.

More than 160,000 ロールテック rebar couplers have been supplied to the Metro construction site to avoid rebar congestion of the traditional overlapping method.

Several types of ロールテック couplers were installed in various parts of the stations’ structures, including standard couplers size #8, #11 and #14, and transition couplers size #8 and #11.

全線は2024年に稼働する予定だ。

エティハド鉄道

エティハド鉄道

Etihad Rail is a 1,200-kilometer railway project that will be the first national freight and passenger railway network in the United Arab Emirates (UAE), connecting the seven emirates and promoting trade and social development in the country and across the GCC countries.

この鉄道プロジェクトは、首長国の都市部および農村部全体にわたる貨物および旅客輸送の持続可能な代替手段となることが期待されています。約1,600万人の乗客と5,000万トンの貨物を運ぶことが見込まれています。道路交通の排出量削減に大きく貢献します。

エティハド鉄道のネットワークは西のカタールとサウジアラビアの国境に達しています。西部区間はグウェイファト経由でサウジアラビアに接続し、東部区間はアル・アイン経由でオマーンに接続します。この鉄道路線はアブダビ、シャルジャ、ドバイを結び、首長国を横断しています。その後、北部首長国とフジャイラへ向かいます。

鉄道網は 3 段階で構築されます。 2016年に開通した鉄道網の第1段階は、アル・ルワイスとシャー間の全長266キロメートルの西側区間である。ルワイスとハブシャンを結び、次にハブシャンとシャーを結びます。

第2段階ではアブダビとドバイを結びます。ジェベル・アリ、ムサファ、ハリファの港とも結ばれています。第 3 段階では、首長国連邦北部の接続が必要となります。第 2 フェーズと第 3 フェーズは 2024 年に完了する予定です。

デキストラは現在、アブダビの200kmの本線とハリファ港までの40kmの支線、ドバイの78kmの本線とジェベルまでの20kmの支線の建設を含む、鉄道ネットワーク建設の第2段階向けにさまざまなエンジニアリングソリューションを提供しています。アリ港、シャルジャからフジャイラまでの98kmの幹線とトーイーンまでの29kmの支線、および関連施設。

これらのソリューションは鉄道トンネル建設現場に納入されました。

トップ画像の出典:https://filipinotimes.net/news/2019/12/19/coming-soon-rail-network-linking-dubai-fujairah-khorffakan-ports/

沙田下水処理場の洞窟への移転

沙田下水処理場の洞窟への移転

The Sha Tin Sewage Treatment Works Relocation project was aimed to relocate the Sha Tin Sewage Treatment Works (STW) in Sha Tin, Hong Kong, which is currently located at the mouth of the Shing Mun River, to the cavern site at Nui Po Shan of A Kung Kok on the opposite bank, freeing up the existing site for uses beneficial to people’s livelihood and improving the local living environment.

The future Sha Tin Cavern STW will be the largest of its kind in Hong Kong, occupying 14 hectares of land. It will have the same treatment capacity as the current site, but will use advanced sewage treatment technology to meet local population demands and improve services for residents.

For the tunneling works, Dextra has supplied around 800 pieces of GEOTEC™ GFRP rock-bolts for the tunnel’s temporary supporting.

GEOTEC™ GFRP rock-bolts are made of cut-able glass fiber reinforced polymers, making them perfect for face bolting or any other tunneling and mining application where further excavation is required.

画像の出典: https://ststwincaverns.hk/

シンガポール サークル ライン (CCL) – ステージ 6

シンガポール サークル ライン (CCL) – ステージ 6

The Circle Line (CCL) is an underground Mass Rapid Transit (MRT) line in Singapore. The 35km, 30-station line runs from Dhoby Ghaut to Marina Bay in the Central Area to HarbourFront.

これは、世界最長の無人高速輸送路線の 1 つです。

In 2013, the Circle Line stage 6 was announced, a 4km extension to finally close the circle of the CCL by connecting HarbourFront station to Marina Bay station.

さらに 3 つの駅が建設中で、2025 年に運用開始される予定です。

Well-known expertise and quality in concrete reinforcement solutions were necessary to tackle this project, and Dextra’s バーテック couplers were chosen for several parts of the Circle Line structure, including starter bars, slabs, and column joints.

プロジェクトの終了までに、約 200,000 個のカプラーが現場に納品される予定です。

Moreover, デクストラ provided 3,000m of Glass Fiber Reinforced Polymer (GFRP) rebars, that can boast some key benefits with respect to metal rebars: a lighter weight, no risk of corrosion, and a lower susceptibility to attract lightning strikes.

On top of that, デクストラ was entrusted with the reinforcement of the concrete structure of the tunnels: 8 Astec Soft-Eyes were used to facilitate the penetration of the Tunnel Boring Machines (TBM) through diaphragm walls, thanks to their innovative cuttable GFRP structure.

フォレストシティ・ジョホール州 森林城市

フォレストシティ・ジョホール州 森林城市

フォレスト シティは、マレーシア南端、ジョホール州のイスカンダル地域で行われている大規模な複合都市開発です。開発はジョホールストレートを越えてシンガポールが見える埋立地で行われている。

このプロジェクトは今後10年間にわたって継続され、最終的には70万人もの人が住む30万戸の住宅と多数の商業ビルを建設することを目指している。

The Forest City project is expected to fuel the region’s economy, as well as Singapore, as light rail and road links will ultimately make the connection across the island state.

デクストラ has been involved since the early phases of the project for the supply of its グルーテックS precast solution. グルーテック allow the swift connection of precast columns and panels, without the need of in situ joints, speeding up the construction project. For the Forest City Project, グルーテック S カプラー(コンパクトモデル)を使用してパネルを接続し、住宅用タワーの耐震壁を作成しました。

The Forest City project is supported by the installation at site of several sets of バーテック threading equipment, which prepare the bars with threads in order to perform the connection with the top part of the グルーテックS sleeve. The Dextra aftersales team also provided training and support in order to guarantee high production output during the project duration.

For more information about デクストラ solutions in Asia, please contact our バンコク事務所

Emirates’ Bustanica Vertical Farm, UAE

Emirates’ Bustanica Vertical Farm, UAE

Emirates’ Bustanica Vertical Farm is the world’s largest vertical farm, a sprawling indoor farming facility spanning an impressive 330,000 square feet. This state-of-the-art facility plays a crucial role in providing fresh, locally sourced in-flight food for Emirates and several other airlines operating at Dubai International Airport. At the core of this groundbreaking project lies meticulous engineering, and one crucial component that contributes to its success is the use of Dextra グルーテック couplers for the precast shear wall module connections.

この垂直農場は、制御された環境で多様な作物を栽培するために最先端の技術を採用しています。この施設は、作物を垂直に層状に積み重ねることにより、資源の消費を最小限に抑えながらスペースの利用を最大限に活用します。その結果、外部の気候条件に関係なく、一年中新鮮で高品質の農産物を生産する持続可能で効率的なシステムが実現しました。

Dextra Groutec カプラーの役割

In any construction project, the choice of materials and components is critical to ensuring structural integrity and long-term durability. In the case of the world’s largest vertical farm, the engineers faced the challenge of connecting precast shear wall modules securely. The solution came in the form of グルーテックL couplers with a diameter of 25mm.

グルーテック couplers are renowned for their reliability and strength in connecting precast concrete elements. These couplers provide a robust and efficient means of joining precast concrete components, ensuring the structural stability of the entire facility. The 25mm diameter was carefully selected to meet the specific requirements of the shear wall modules, offering a seamless connection that enhances the overall resilience of the vertical farm.

Groutec カプラーは、垂直農場の構造的完全性を促進するだけでなく、プロジェクトの持続可能性への取り組みとも一致します。これらのカプラーの耐久性と信頼性により、接続が長期間の使用に耐えることが保証され、施設の長寿命化と持続可能な農業への貢献がサポートされます。

AVE パレンシア - サンタンデール HSR パッケージ 1 (パレンシア – パレンシア ノルテ) & パッケージ 2 (パレンシア ノルテ – アムスコ)

AVE Palencia-Santander high-speed rail project is a significant infrastructure undertaking aimed at connecting Palencia and Santander in Spain. This project involves the construction of extensive railway networks, viaducts, and bridges, underscoring the need for a strong and resilient foundation. Recognising the critical importance of ensuring the structural integrity of the concrete piles, the project management sought advanced testing methodologies.

デクストラ played a pivotal role in ensuring the robustness of the project’s foundation by supplying ソニテック Crosshole Sonic Logging (CSL) testing tubes. These tubes were instrumental in conducting comprehensive structural integrity tests on the concrete piles of AVE Palencia-Santander USR Package 1 (Palencia – Palencia Norte) and Package 2 (Palencia Norte – Amusco).

クロスホールソニックロギングは、コンクリート杭の品質と完全性を評価するために広く採用されている非破壊検査方法です。これには、2 つのアクセス チューブ間のコンクリートを透過する音波の使用が含まれ、エンジニアが材料の特性を評価し、潜在的な欠陥を特定できるようになります。

ソニテック tubes are specially designed for Crosshole Sonic Logging, ensuring precise and reliable data collection during structural integrity tests. These tubes are embedded in the concrete piles during construction, providing access points for the sonic wave transmission.