シーワールド アブダビ

シーワールド アブダビ

SeaWorld Abu Dhabi is an under-construction marine life theme park and animal research, rescue and rehabilitation center, planned to open in 2023 on Yas Island in Abu Dhabi, United Arab Emirates.

It will be the first SeaWorld park outside of the US, under a license from SeaWorld Parks & Entertainment. The Abu Dhabi-based company Miral is the owner and operator of the project.

Dextra have supplied 400,000 Bartec couplers for the connection and reinforcement of columns, beams, and slabs.

Moreover, 20,000 linear meters of cuttable GFRP (Glass Fiber Reinforcement Polymer) rebar have also been installed in the overlay slabs of the swimming pools, replacing steel rebars as the product of choice.

Thanks to its durability and corrosion-free nature, GFRP is an ideal material when the concrete structure is surrounded by water.

Dextra GFRP Rebar

Source of images: https://www.constructionweekonline.com/projects-and-tenders/267779-construction-of-mirals-seaworld-abu-dhabi-hits-40-milestone, https://www.thenationalnews.com/lifestyle/things-to-do/2023/05/22/seaworld-abu-dhabi-opens-with-star-studded-event/

ワン シティ センター (OCC)

ワン シティ センター (OCC)

One City Center (OCC) は、タイのバンコク中心部にある 61 階建てのオフィスビル プロジェクトです。

建物は、西側の洗練されたコアと東側のガラス張りのオフィススペースという 2 つの部分で構成されています。タワーはこれら 2 つのボリュームの交差によって定義され、コアを包む対角構造システムによって包まれます。

地下下部工と上部工には、バーテック製鉄筋カプラー15万本、頭付鉄筋2万本が下記の通り設置されています。

地下基礎構造物:

  • 適用時期 地中隔壁.
  • マット基礎の鉄筋を補強します。
  • 簡略化するには、 トップダウン構造 プロセス。
  • マット基礎(有頭棒)のコンクリート打設段階を容易にします。
  • 上部構造:

  • コア壁に適用されます。
  • として使用されます スターターバー用ダボ.
  • 列を接続するには、 柱から梁まで.
  • 工事をスムーズに進めるために、 一時的な開口部.
  • このプロジェクトは 2022 年の最終四半期に完了する予定です。

    画像の出典: https://www.facebook.com/onecitycentrebangkok/

    バタシー発電所開発: 英国のランドマークの再生

    Battersea Power Station Development:

    The Revitalization of a UK Landmark

    Battersea Power Station was a decommissioned coal-fired power station, located on the south bank of the River Thames, in Nine Elms, Battersea, in the London Borough of Wandsworth.

    The power station was one of the world’s largest brick buildings and one of the last major symbols of London’s industrial past.

    After the building remained empty for almost 40 years, a redevelopment plan kicked off with the mission to build a new iconic London landmark.

    The 3rd phase consists in the creation of the so-called ‘Electric Boulevard’, which will include a connection to the Northern Line Extension station, more than 1,300 residential units, a 160-room hotel, retail spaces, restaurants and leisure facilities.

    Dextra has been supplying several rebar coupler solutions to the site.

    More than 100,000 Griptec and Rolltec cast-in-situ couplers were applied in masonry cells to alleviate the problem of rebar congestion due to long lap length.

    Moreover, precast concrete panels reinforced by rebars were used in the building, equipped with 30,000 Groutec couplers for onsite connection of continuation bars.

    The panels were easily lifted into place at the construction site: coupler cavities were then filled with non-shrink grouting mortar through the injection holes.

    Finally, 3,000 Unitec bolted couplers were installed on rebars for repair works. These couplers were used to replace the damaged reinforcements with new ones and to connect to the finished structure.

    The mixed-use community is anticipated to be completed in 2020 and to become a new landmark for locals, tourists and residents.

    ザ リンク ラ デファンス

    ザ リンク ラ デファンス

    The Link is a 242-meter-high skyscraper in France, and one of the most recognizable structures in the heart of Europe’s largest business district. The building, located in Paris La Défense, will be the tallest high-rise in the country and a prime example of innovative engineering and cutting-edge technology in the world of architecture.

    One of the key factors that sets this building apart from others is the use of Dextra’s Fortec coupler for the reinforcement of its structure. Fortec coupler is a highly advanced and innovative solution for reinforcing concrete structures, and it was used throughout the building to ensure maximum strength and stability.

    The building is being constructed with a focus on sustainability and durability. The use of Fortec coupler was an important part of this effort, as it provides a reliable and long-lasting solution for reinforcing concrete structures. The coupler is made of high-strength steel, which makes it extremely durable and able to withstand the harsh weather conditions in the La Défense area.

    Fortec coupler also offers a number of benefits over traditional reinforcement methods. For example, it is faster and easier to install than traditional reinforcement methods, which helps to reduce construction time and costs. It also helps to maintain the structure’s integrity even in the event of an earthquake or other natural disaster.

    The Link La Défense building is set to be a marvel of modern engineering, and the use of Fortec coupler is a critical component in its design. The coupler’s durability, reliability, and sustainability will ensure that the building remains a prominent structure in the La Défense area for many years to come.

    Image credit: www.skyscrapercity.com, thelink-ladefense.com, The Link © PCA-Stream

    グッゲンハイム美術館

    グッゲンハイム美術館

    Guggenheim Abu Dhabi is a museum of modern and contemporary art, located in Saadiyat Island cultural district in Abu Dhabi, United Arab Emirates. As this awe-inspiring museum took shape, numerous challenges needed to be overcome, and Dextra provided crucial reinforcements to the structure, ensuring its stability, durability, and overall success. We supplied an astounding 140,000 Bartec couplers, 30,000 RepairGrip couplers, 50 tons of Geotec rock bolts, and 199 sets of DCP anchors, contributing significantly to the construction of this iconic masterpiece.

    Strengthening the Structure with Bartec Couplers:

    The Guggenheim Abu Dhabi stands tall and proud, thanks to the reinforcement provided by Dextra’s Bartec couplers. With a supply of 140,000 Bartec couplers, Dextra ensured that the concrete reinforcement in the structure remained robust and resilient. These couplers provide a reliable mechanical connection between reinforcing bars, enhancing the overall strength of the structure.

    Seamless Rebar Connection with RepairGrip Couplers:

    The use of 30,000 RepairGrip couplers helps connect rebars with no prepared threads, ensuring a seamless connection of rebars and minimizing the risk of structural failure.

    Stabilizing Rocks with Geotec Rock Bolts:

    In addition to the couplers, Dextra provided 50 tons of Geotec rock bolts to stabilize the rocks surrounding the museum. These rock bolts serve as critical anchors, reinforcing the natural formations and enhancing their stability. By utilizing them, the construction team effectively mitigated the geological risks associated with the site, ensuring a secure foundation for the museum.

    Retaining the Seawall with DCP Anchors:

    The museum, standing gracefully on the shores, required robust seawall retention, and Dextra’s DCP anchors provided the ideal solution. With the supply of 199 sets of DCP anchors, the seawall was reinforced and secured effectively. The anchors offer reliable and efficient retaining solutions for coastal structures, providing stability in the face of dynamic forces such as waves and tides.

    Upon completion, it is planned to be the largest of the Guggenheim museums.

    カタールの巨大貯水池

    カタールの巨大貯水池

    Qatar’s General Electricity & Water Corporation (KAHRAMAA) is currently building fresh water reservoirs to store the equivalent of 7 days of Qatar’s national consumption of fresh water at WHO (World Health Organization) standards. The primary reservoirs are located in five different sites in Doha area: Um Baraka, Um Salal, Rawdat Rashid, Abu Nakhla, and Al Thumama.

    The first phase of the project involves the construction of 5 mega reservoir sites, and will support the expected water demand at horizon 2026. The second phase includes the construction of 16 additional reservoirs within the five existing mega sites. With a capacity of 3.5 million m3 each, the Reservoirs are among the largest of their kind in the world.

    For this project, Dextra Middle East delivered more than 3 million バーテック couplers to the rebar fabricators and contractors involved on the different packages.

    Project requirements regarding corrosion protection specify that the complete reinforcement, including couplers, should be epoxy coated. Dextra is therefore delivering all Bartec couplers with epoxy coating, giving them a distinctive green look.

    qatar-reservoir-epoxy-bartec

    Couplers are used in the raft and columns all over the different reservoirs as a way to reduce steel congestion and generate savings.

    For more information about Dextra solutions and project in the Middle East, please contact our Dubai office.

    バンコクアリーナ

    バンコクアリーナ

    バンコク アリーナは、バンコク東のノンチョク地区にあるマルチスポーツ屋内アリーナです。このアリーナは、サッカーの屋内バージョンであるフットサル トーナメントを開催するために委託されました。現在、アリーナではコンサートだけでなく、バレーボールやバスケットボールのイベントも開催されています。アリーナは最大 12,000 人を収容できます。

    このプロジェクトのために、Dextra は 2012 年に設計し、供給しました。 テンションバー 建物の屋根を吊り下げています。

    建築用の長いバー システムはコンクリート パイロンに固定され、建物の屋根の構造を保持するサスペンダーとして機能します。

    このプロジェクトについて テンションバー 当社の製品範囲の中で最高のグレード 700 で供給されました。最高級グレードでは、より優れた性能/鋼比が得られるため、より小さな直径を選択することが可能になります。これにより、構造がより薄くなり、全体的に美観が向上します。さらに、直径のバーと軽量の要素により、現場での取り扱いと設置作業も容易になります。

    バーの各セグメントは、カプラー (長さ調整なし) またはターンバックル (長さ調整と張力調整が可能) を使用して次のセグメントに接続されます。

    コンクリート構造物への接続は、スチールガセットプレート上に設置されたフォークエンドによって行われます。

    合計すると129トン以上になります。 テンションバー 屋根構造を固定している腱は30メートルを超えています。

    ラス・アブ・アブード・スタジアム、2022 FIFAワールドカップ会場

    ラス・アブ・アブード・スタジアム、2022 FIFAワールドカップ会場

    ラス アブ アブド スタジアムは、カタールのドーハにある建設中のサッカー スタジアムで、収容人数は 40,000 人です。

    このプロジェクトは、2022 年の FIFA ワールドカップ トーナメントに合わせて特別に設計されています。スタジアムは、リサイクルされた輸送用コンテナ、取り外し可能な座席、その他のモジュール式構成要素を使用したモジュール式設計で、イベント後に完全に解体されて再利用されます。

    Dextra は、屋根やボウル構造、さらには階段、キャットウォーク、スロープの交差ブレース用に 600 セット以上の炭素鋼テンション ロッドを供給しました。テンションロッドの棒ネジサイズはM20(直径19mm)からM72(直径70mm)まであります。

    2020 年に完成予定のラス アブ アブード スタジアムは、持続可能な建設設計の新たな基準を打ち立てることになります。

    プネー クリケット スタジアム

    プネー クリケット スタジアム

    プネー クリケット スタジアムは、インドのマハラシュトラ州プネー市の近くにあるクリケット アリーナです。

    このスタジアムは英国の会社ホプキンス・アーキテクツによって設計され、2010年から2011年に建設された。

    スタジアムは最大 37,400 人を収容でき、周囲の山々の素晴らしい景色を眺めることができます。

    このプロジェクトのために、Dextra は 2012 年に設計し、供給しました。 テンションバー 建物の屋根を吊り下げています。

    建築用の長いバー システムは鋼鉄パイロンに固定され、屋根構造を吊り下げます。

    テンションバー セットは鋼グレード 460 で供給されました。各腱は、カプラー (長さ調整なし) またはターンバックル (長さ調整と張力調整が可能) を使用してつなぎ合わされたいくつかのバーセグメントで構成されています。

    合計50トン以上 テンションバー プネー クリケット スタジアムの屋根構造を固定しています。

    オリンピック競輪場

    オリンピック競輪場

    オリンピック競輪場 (現在はリー バレー ヴェロパークと改名) は、イースト ロンドンにある多目的スポーツ施設です。この施設は当初、2012 年のロンドンオリンピックとパラリンピックを開催するために建設されました。この施設には現在もロードコーストラックとBMXトラックがあり、国際自転車競技会が開催されます。

    このプロジェクトのために、Dextra Europe は、Griptec 鉄筋接合ソリューションを請負業者である Sir Robert Mcalpine および Byrne Construction に納品しました。

    グリップテック スプライスは主に、競輪場の柱に垂直の鉄筋接続を提供するために使用されていました。

    当社のグリップテック ソリューションは、鉄筋上へのグリップテック スリーブの押し出しに必要なデエクストラ グリップテック機器をホストするロンドンのデクストラの現地代理店によってサポートされました。

    Griptec は CARES TA1-A、TA1-B、および TA1-C で承認されたソリューションであり、最先端の鉄筋接合アプリケーションや厳しいプロジェクト要件にも適しています。