National Bank of Kuwait – New Headquarter

National Bank of Kuwait – New Headquarter

The new headquarters building of the National Bank of Kuwait is a 300m-tall tower that covers a total floor area of 127,000m2 with a design concept inspired by pearl shells and located in the heart of Kuwait City’s financial district.

The main construction comprises composite concrete and steel, while the cladding on the fins and glass façades is predominantly glass-reinforced concrete.

Dextra took part in reinforcing the concrete structure of the building by providing these solutions:

  • 100,000 Bartec couplers were installed for columns reinforcement, construction joints in raft and slab/beam to core wall connections.
  • 35,000 headed bars act as shear studs in raft.
  • 1,500 Unitec bolted couplers were used to extend existing reinforcing bars that were either not threaded or too short for lapping. It is a convenient solution to connect rebars by using a simple pneumatic wrench at the construction site, without the need of any rebar preparation.
  • ザ・プラム・コンドミニアム | พลัมคอนโด

    ザ・プラム・コンドミニアム | พลัมคอนโด

    プラム セントラル ステーションは、バンコク北西部のバンヤイ高架地下鉄駅の近くに位置する 2 つのタワーからなる 38 階建てのコンドミニアム プロジェクトです。この住宅棟には 1,013 戸のアパートが入居する予定です。

    プロジェクトのフェーズ 1 (最初のタワー) は 2015 年 9 月に開始され、2018 年 3 月頃に完成する予定です。「フルプレキャスト」コンクリート技術の使用により、ハイペースな建設が可能になりました。

    プロジェクトのオーナーである Pruksa は、このプロジェクトのために独自のプレキャスト工場を運営しています。

    このプロジェクトにおいて、Pruksa の目的は、地上のすべてのレベルにプレキャスト パネル (耐震壁として機能) を迅速に構築できるようにすることでした。 Dextra は、その目的のために Groutec カプラーの使用を提案しました。

    Groutec カプラーは、Bartec スレッドで事前に準備された Ø25mm 鉄筋に取り付けられます。各プレキャスト要素の底部に取り付けられたカプラーは、プレキャスト壁パネル要素の一部として鋳造されます。

    現場でエレメントを上層階に持ち上げた後、無収縮モルタルを注入することによって突き出た鉄筋に再接続します。 Dextra はモルタルを提供していないことに注意してください。モルタルは地元で調達できるため、大幅な節約が可能です。グラウトを注入した後、各パネルの周りのブレースは 3 日後に取り外すことができます。

    The Plum Central Station と Groutec アプリケーションの詳細については、ケーススタディを参照してください。

     

    第一幕 |第 2 幕の塔

    第一幕 |第 2 幕の塔

    Act One | Act Two Tower is a premium residential project in the Opera District of Downtown Dubai.

    The project consists of two towers called Act One (52 stories) and Act Two (46 stories).

    With their prime location, these residential towers offer views of the Dubai Fountain and the Burj Khalifa and they are few minutes away from Dubai Metro and from major attractions like the Dubai Mall and the Souk al Bahar.

    For this exceptional residential project, Dextra was entrusted with the reinforcement of the buildings’ structures, including raft foundations, columns, slabs and construction joints.

    150,000 Bartec rebar couplers along with rebar preparation machines were delivered to the construction site.

    Bartec rebar couplers help speed up the construction with a faster and more convenient way of connecting rebars than the traditional rebar lapping method.

    The thread on the rebar can be extended from a half-coupler to a full coupler length, allowing to perform the connection without any bar rotation.

    The project is scheduled to be completed in November 2020.

    大型小売店

    大型小売店

    This new 4-story retail center has been designed to have the smallest carbon footprint possible, with an innovative optimization of the air-condition load.

    It is located in Jebel Ali, Dubai, UAE with an 81,000 sqm floor area and a leasable area for over 100 retail and concept stores.

    Dextra Groutec couplers contained in the precast panels made the assembly on site easy and fast. More than 1,100 units of Groutec L 25 and 32mm were delivered.

    Groutec is a high-performance precast connection solution which is convenient to set up and fast to install on site by grout injection. It supports the connection of precast concrete columns, panels and beams.

    The first phase of the retail center is set for completion in 2019. The second phase will include a residential area to create a new lifestyle hub in Dubai.

    トリニティ タワー ラ デファンス

    トリニティ タワー ラ デファンス

    パリ西部のラ・デファンスのビジネス地区にあるトリニティ・タワーは、52,000平方メートルを超えるオフィススペースを備えた33階建て、高さ140メートルの新しいオフィスタワーです。

    このプロジェクトは、これまで道路によって分断されていたエリアを再接続する大規模な屋外公共スペースを追加することで、社会的および環境的な地域への影響を達成することを目的としています。また、緑地スペース、屋上スペース、開放的なファサードを備え、LEEDS 認証も取得します。

    このプロジェクトのために、Dextra はフランスの代理店 SNAAM Vernon を通じて 18,000 個以上の製品を供給しました。 フォーテック® 鉄筋の接続。

    鉄筋カプラーを使用すると、束またはケージで一度に 1 本の鉄筋を接続するための迅速かつ安全な方法が提供されるため、建設ペースが向上します。バンドルとケージの場合は、現場以外で組み立てることができ、最終的な場所に到着したらカプラーで簡単に再接続できます。

    トリニティタワーは2019年の完成を目指している。

    フランスで利用可能な鉄筋接合ソリューションの詳細については、弊社までお問い合わせください。 パリオフィス 詳細については。

    Floresta Gardens Towers – The Pearl

    Floresta Gardens Towers – The Pearl

    The Floresta Gardens project involves construction of the towers inside The Pearl Qatar.

    The project consists with the construction of mid-rise residential towers and villas within three gated villa communities, including a 2,452-square meter retail center. The precinct has a gross floor space of 267,471 square meters, 145,967 square meters of developable land, and 5,000 residential units.

    In the precast construction of the towers, Dextra Groutec played a significant role. Over 30,000 Groutec L couplers in sizes 20 mm to 40 mm were inserted inside columns for vertical connections on the construction site.

    Groutec precast coupler is an innovative solution for fast and easy connection of precast concrete elements. It is widely used in residential and commercial construction projects around the world.

    ジェッダタワー

    ジェッダタワー

    ジェッダ タワー (以前はキングダム タワーとして知られていました) は、サウジアラビアのジェッダ北部の紅海沿いにあるランドマーク的な超高層ビルです。

    この商業ビルは初めて 1 km のマークを通過するように設計されており、予想総高さは 1,008 メートルで、世界で最も高いビルとなります。

    ジェッダタワーには、最終的には 200 室のフォーシーズンズ ホテル、サービスアパートメント、数フロアのオフィス、天文台が建設される予定です。合計 59 台のエレベーターでフロア間を移動できます。

    タワー構造はコンサルティング会社ソーントン・トマセッティによって設計され、請負業者サウジ・ビンラディンによって建設され、デクストラは現地パートナーのバーラ・スチールの支援を通じて納入している。

    Dextra は、基礎と上部構造の両方の構造に鉄筋カプラー 100% を提供できることを誇りに思っています。

    構造物では主に 2 種類の鉄筋カプラーが使用されます。

    • すべての基礎、柱、垂直接続には、標準の Bartec カプラーが使用されます。これらにより、プレハブケージの迅速な接続が可能になります。
    • スラブ接続の場合、U 字型鉄筋の各脚を柱に接続するために、特別なブリッジ カプラーも使用されます。

    タワーは現在も建設中で、2019 年頃に完成する予定です。

    インドで最も高いプレキャストタワー

    インドで最も高いプレキャストタワー

    Galaxy Towers, developed by Aurobindo, is a project to construct 24-storey precast office building in Hyderabad, India.

    It will be the tallest office tower in India built with precast technology.

    The building comprises of 4 basement floors and 24 upper stories with 1.9 million sq. ft. leasable area, which will include health clubs, food courts, cafés, a business center, ample car parking and a waiting lounge.

    The project is expected to be built in half the time of a comparable conventional cast-in-situ construction, illustrating how the precast technology has gained ground thanks to its efficiency.

    For this special project, Dextra supplied a critical part of the precast structure: Groutec coupler, a half-grouted sleeve designed for the connection of precast elements and manufactured in compliance with Eurocode 2, BS 8110, ACI 318, IBC, AASHTO & IS 16172.

    By installing Groutec couplers into the precast columns and walls at the precast factory, the fast and safe connection of walls or columns is achieved by injecting cementitious non-shrink grout through the inlet into the sleeves at site. 102,000 Groutec couplers have been delivered for this project.

    The Galaxy Towers is anticipated to be completed in 2020.

    (photo credit: Aurobindo Realty & Infrastructure Private Limited at https://bit.ly/37DW7IT)

    鍵となるラーマ 3 世

    鍵となるラーマ 3 世

    The Key Rama 3 is a 484-unit high-rise condominium by Land & Houses with sizes ranging from 29 to 61 square meters. The project is located near the Chaopraya river on Rama 3 road, approximately 12 km. from Charoen Krung intersection to Na Ranong junction at Klongtoey in Bangkok, Thailand.

    The condominium is a fully precast concrete building with no cast-in-place concrete on its main structural elements.

    This type of construction required less workers, materials like rebars, and concrete on the site, which resulted in a shorter construction period and fewer complaints from the neighboring community regarding noise and waste.

    Grouted mechanical sleeves were used to join the precast elements, and Dextra Groutec couplers, installed inside shear wall and bearing wall, were an important part of the process.

    “The half-grouted mechanism of Groutec L and S sleeves, which have a threaded end on one side, ensured accuracy and reduced mistakes during the grouting process” said Mr. Janeboon Leepipatnavit, Project Director of Taveeporn Technology Co., Ltd., the contractor of this project.

    Mr. Janeboon further stated that Dextra was a reliable company with its own facilities in Thailand that could provide immediate support if required.

    ザフルシティ

    ザフルシティ

    ザフル シティは、サウジアラビアのメッカにある最大規模の不動産プロジェクトの 1 つです。この複合開発プロジェクトは、3 つ星から 4 つ星のホテル、高層住宅、市場、保健センター、警察、消防署で構成されています。 20万人以上を収容できるように設計されています。

    建設現場は山間部に位置するため、掘削後に生じた緩んだ岩塊を固定するためにボルト締めシステムが基本でした。デクストラは、現場を安定させるために、約 3,000 本のスチール製全ねじロック ボルトを納品しました。

    ロックボルトは、破損を引き起こすほど十分に動く前に、不安定な岩層を編み込むことによって機能します。 Dextra は、フェースボルト締めやその他のトンネル掘削/採掘用途向けに、スチール製および切断可能な FRP ロックボルトを提供しています。

    デキストラはこのプロジェクトの初期段階から関与し、高品質の製品と建設現場での専門的なサポートを提供しています。