デクストラグループ |信頼性の高い接続

DEXTRA WEBINAR: Headed Bars Design According to ACI 318

Dextra Headed Bars Webinar

We are pleased to invite you to our live webinar on “Headed Bars Design According to ACI 318”, presented by Richard Goodman, Technical Manager, Dextra Europe, on Wednesday, 28th April, 2021 from 3 to 4 p.m. (GMT+7).

The webinar will introduce the basis of how to design with headed bars in accordance with ACI 318 principles, as well as giving practical advice and information about their use.

With over 25 years of experience in the design of steel products for construction, Richard will share his knowledge and insights on how your can apply the FRP rebar to your next construction projects.

今すぐ登録

過去のウェビナーの録画を見る

このメールアドレスはスパムボットから保護されています。表示するにはJavaScriptを有効にする必要があります。

New CAD/BIM tools for Groutec F!

The new Groutec F couplers for precast element connection without the need of thread preparation were added to the Dextra design tool ranges.

Groutec F is designed for the connection of precast elements, without the need of threading, available for rebar sizes 12-43mm (#4-#14).

The CAD/BIM tools allow designers to quickly and accurately model and detail building structures by importing the provided components to the software of choice.

Download the components now and take advantage of our easy-to-use components for AutoCAD, Revit and Tekla, available in all dimensions

Groutec F Tools

どうやって始めるのか?

1. Download and install Groutec F component:

    • AutoCADユーザーの方はダウンロードしてください ここ “AutoCAD Rebar Coupler Tool” package (registration required)

    • Revitユーザーの場合はダウンロードしてください ここ “Revit Groutec (F)” (registration required)

    • Teklaユーザーの方はダウンロードしてください ここ “Tekla Groutec (F)” (registration required)

2. ラップトップ上の目的のフォルダーにファイルを抽出します。

3. 「インストール」という名前のファイルに詳細に記載されているステップバイステップの指示に従います。

4. プロジェクトの要件に基づいて、適切なバー サイズを選択します。完全な構造を描きます。

5. 最終的には、AutoCAD、Revit、Tekla に製品仕様メモを直接追加できるようになります。
Groutec F tools: tutorial videos



Dextra America launches US made Sonitec CSL tubes

Sonitec US

Dextra America has launched a US made “push fit” designed sonic tube system for Crosshole Sonic Logging (CSL) testing of concrete. Sonitec tubes facilitate the integrity testing of foundations using the CSL testing method and are compliant with ASTM D6760. Sonitec CSL tubes are designed specifically for CSL testing and provide a safer and quicker solution when secured in 強化 ケージ。

Sonitec comes in two different models, the Sonitec Plus and Sonitec Slim. The Sonitec Plus is 2” Schedule 40 steel pipes with an enlarged end in a bell mouth shape for instant connection: it makes for quick and easy push-fit installation. It is produced in compliance to AASHTO (American Association of State Highway and Transportation Officials) standard.

Sonitec Slim sports a lighter design, with a thinner wall thickness of .49” and a diameter of 2”, resulting in over 70% weight reduction. It also features the same “push fit” design for quick and easy installation.

Both models are tested and qualified in the U.S.A and exceed pressure of 725 psi for one minute.

Despite being a recent addition to Dextra America’s product portfolio, Sonitec CSL tubes have been trusted on jobs for over 20 years and are the preferred solution for 積み上げ and general contractors worldwide. Sonitec saves time and labor in the field and offers a safe and quick solution for a perfect CSL testing environment.

Sonitec is now proudly made in the U.S.A. with U.S. steel, thus fully compliant with Buy America and Buy American Acts.

Download Sonitec US brochure

Dextra’s GFRP solutions on Australian projects – the Melbourne Metro case

Melbourne Metro

The Melbourne Metro Tunnel will connect the Sunbury line with the Pakenham and Cranbourne lines

Call our Authorized Agent in Australia, RHE24: +61 424 204 366

Glass Fiber Reinforced Polymer (GFRP) solutions are frequently used for several applications in civil engineering due to its many benefits compared to alternative, conventional materials:

light weight

A 1/4 of the weight, but 2x stronger in tension compared to steel rebar
corrosion-free

For corrosive resistance in acidic and alkali environments
cutability

Ideal for temporary applications
100 years of lifetime

Suitable for permanent applications

In mining and tunneling this composite technology has successfully been used for decades, and GFRP is now also available for soil nails and tieback ground anchors.

A perfect showcase of latest GFRP solutions available is the Melbourne Metro Tunnel project, a major enhancement to Melbourne’s rail network: a multibillion-dollar project comprising the design and construction of twin nine-kilometer tunnels and five underground stations.

Dextra supported the project team with its technical expertise on GFRP at design stage and manufactured the GFRP solutions as per the project’s requirements:

combination bolt

ASTEC GFRP Combination Bolts were used as temporary measure to secure the center walls of the 19m wide caverns of the two major CBD stations during construction of two conventional 7m tunnels, built in parallel. Easy removal after completion enabled faster construction progress.

soil nail

GFRP Astec soil nails secure the stations walls under construction. Some of the anchors are located outside the boundary of the project and can remain in the ground as material properties allow for easy cutting at later stage via commonly used excavation equipment.

soft-eyes

GFRP ASTEC Soft-Eyes enabled disruption-free penetration of the Tunnel Boring Machines (TBM) through the thick concrete diaphragm walls of five stations. No demolition equipment needed, and no workers required to access the shaft to guarantee the maximum level of safety and efficiency.

To learn more about Dextra GFRP solutions in Australia please:

  • Contact our Dextra Sales Representative: このメールアドレスはスパムボットから保護されています。表示するにはJavaScriptを有効にする必要があります。
  • Or call our Authorized Agent in Australia, RHE24: +61 424 204 366
  • Headed Bar calculation tool (ACI 318) released

    Dextra Headed Bar Calculation Tool ACI 318

    のリリースを発表できることを嬉しく思います。 Headed Bar Calculation Tool as per ACI 318, available for:

  • バーテック – ACI 318(ヤードポンド法/米国)
  • Rolltec – ACI 318 (帝国/米国)
  • Bartec – ACI 318M(メートル法/世界)
  • Fortec – ACI 318M(メートル法/ワールド)
  • Rolltec – ACI 318M(メートル法/ワールド)
  • このドキュメントにより、設計者は Dextra ヘッドバーの最小エッジおよび間隔要件、拘束補強、および必要に応じて鉄筋結合寄与を簡単に計算できるようになります。

    作業を簡素化し、Dextra ツールを活用しましょう。

    計算ツールをダウンロードする

    Dextra seminar with Bouygues-Thai

    Dextra held a seminar on building construction technology with Bouygues-Thai on Friday, September 18, 2020 at Dextra Manufacturing office and factory in Bangkok, Thailand.

    The one-day seminar featured innovative precast element connection technology, tension and compression bar systems, crosshole sonic logging testing method, a technical detailing training and a factory visit.

    Dextra-Bouygues-Thai seminar

    Read more about Dextra solutions

    WEBINAR – Challenges and Opportunities for Ports and Shipping in ASEAN

    These are extraordinary times, creating unique obstacles and unexpected opportunities for ports professionals around the world.

    Join us at this upcoming webinar event to discuss about the situation in Southeast Asia:

    CURRENT CHALLENGES AND FUTURE OPPORTUNITIES FOR PORTS AND SHIPPING IN ASEAN

    Thursday, September 24, 2020

    10.00 to 11.30AM (CEST)

    The webinar features prestigious panelists in the port and shipping industry of Indonesia, Malaysia and Philippines, along with Dextra experts in port expansion solutions.

    Register now for free

    New CAD/BIM tools for Marine Tie Bars!

    Marine Tie Bars Tools

    New CAD/BIM components of Marine Tie Bars are available for AutoCAD, Revit and Tekla.

    デクストラマリンタイバーは、港湾建設において水辺の構造物を固定するために使用されます。防波堤をアンカーウォールに繋留するためのアンカーとして機能し、あらゆるシートパイルプロファイル、コンビウォール、コンクリート構造物に適合します。 地中隔壁.

    これらの CAD/BIM ツールを使用すると、設計者は提供されたコンポーネントを任意のソフトウェアにインポートすることで、建物の構造を迅速かつ正確にモデル化し、詳細化することができます。

    今すぐコンポーネントをダウンロードして、あらゆる寸法とグレードで利用できる、AutoCAD、Revit、Tekla 向けの使いやすいコンポーネントを活用してください。

    Marine Tie Bars Tools

    どうやって始めるのか?

    1. Download and install Marine Tie Bars component:

        • AutoCADユーザーの方はダウンロードしてください ここ (登録が必要です)

        • Revitユーザーの場合はダウンロードしてください ここ (登録が必要です)

        • Teklaユーザーの方はダウンロードしてください ここ (登録が必要です)

    2. ラップトップ上の目的のフォルダーにファイルを抽出します。

    3. 「インストール」という名前のファイルに詳細に記載されているステップバイステップの指示に従います。

    4. プロジェクトの要件に基づいて、適切なバー サイズを選択します。完全な構造を描きます。

    5. 最終的には、AutoCAD、Revit、Tekla に製品仕様メモを直接追加できるようになります。

    Dextra Marine Tie Bars tools: tutorial videos





    Dextra to attend WTC 2020 virtual exhibition

    Dextra WTC 2020


    Click here for more information and registration

    Dextra is showcasing innovative ground engineering solutions, featuring GFRPソフトアイズ そして Rock-Bolts, at the World Tunnel Digital Congress (WTC) 2020 on September 14-16, 2020.

    WTC is one of the world’s leading tunneling event that explores the latest innovations, trends and advances in all areas of tunneling, from tunnel project development to both design and construction.

    The event is moved to a fully digital platform due to the impact of COVID-19: it will include online technical paper presentations, along with training courses, and virtual exhibitions by companies from all over the world.

    Dextra features a wide range of underground temporary and permanent support solutions, with a focus on cuttable glass fiber reinforcement polymer (GFRP) technology: join us at the virtual exhibition at booth no. SS11 (Silver Sponsor)!

    Read more about Dextra solutions