Dextra Group | Reliable Connections

 

Hong Kong International Airport Terminal 2

Hong Kong International Airport (HKIA) stands as a global aviation hub, ranking among the world’s busiest airports for both cargo and passenger traffic. As part of its commitment to excellence and efficiency, the recent Terminal 2 Expansion project aimed to enhance the airport’s capacity and infrastructure. Dextra’s contribution played a pivotal role in ensuring the project’s success.

With the continuous growth in air travel and cargo shipments, HKIA recognized the need to expand and upgrade its facilities to accommodate the increasing demand. Terminal 2, a vital component of the airport’s infrastructure, became the focus of an extensive expansion project. This redevelopment aimed not only to increase passenger capacity but also to improve operational efficiency and provide a seamless experience for travelers.

Dextra, a leading provider of engineered construction products, played a crucial role in the success of the Terminal 2 Expansion project. The company supplied an impressive 200 tons of post-tensioning bars, specifically the M78 and M88 sizes, Grade 1080. These post-tensioning bars were instrumental in several key aspects of the construction process.

Connection of Jacking Towers:

The expansion project involved intricate engineering, requiring the precise connection of jacking towers to ensure the structural integrity of the new terminal. Dextra’s post-tensioning bars provided the necessary reinforcement, allowing for a secure and reliable connection between the towers.

Heavy Lifting of Roof Structure:

Terminal 2’s redevelopment included the installation of a robust and aesthetically pleasing roof structure. The weight and complexity of the roof required a sophisticated lifting mechanism. Dextra’s Grade 1080 post-tensioning bars played a key role in the heavy lifting process, ensuring that the roof structure was securely and efficiently positioned.

As HKIA continues to uphold its status as a global aviation leader, the Terminal 2 Expansion project, along with Dextra’s significant contribution, stands as a remarkable example of innovation and excellence in airport infrastructure development.

Related Solutions

Expertise

At every moment of your customer journey, Dextra teams dedicate themselves to the production of smart construction solutions that allow our customers to reach higher productivity and safety levels on their construction sites.

Dextra holds physical stocks on several continents, complemented in each country by the local inventories of our distributors. With this extended network, Dextra makes sure our products are always at reach no matter where our partners are.

For solutions that require to be customized, Dextra can also go beyond our standard delivery times and offer accelerated delivery schemes. Consult us for more information.

From 3 major industrial sites located in Bangkok (Thailand), Guangzhou (China), and Pune (India), Dextra completely owns its manufacturing facilities and processes. This allows us to have complete control over the timing of our operations and the quality of the solutions produced.

An independently accredited material testing laboratory, accredited to ISO-IEC17025, is located at Dextra’s main Bangkok factory, allowing the testing of material and products.

Dextra aims to supply products that exceed the most demanding international technical approvals and it is our goal to create maximum customer satisfaction by complying with our clients’ needs and specified requirements.