Plum Condo Bangyai Station, Thailand

Plum Condo Bangyai Station, Thailand

Plum Condo Bangyai Station is a 38-story condominium project consisting of two towers, located near Bangyai elevated metro station in the northwest of Bangkok. The residential building will house 1,013 apartments.

Phase 1 of the project (the first tower) began in September 2015 and is expected to be completed around March 2018. The fast-paced construction is made possible by the use of fully precast concrete techniques.

The project owner, Pruksa, is operating its own precast plant specifically for this development.

For this project, Pruksa aimed to quickly erect precast panels (serving as shear walls) for all levels above ground. To meet this requirement, Dextra recommended the use of ग्रौटेक couplers.

Groutec couplers were mounted on Ø25mm rebars, which had been pre-threaded using the बार्टेक system. The couplers, installed at the bottom of each precast element, were then cast as part of the precast wall panel.

After lifting the element to the upper floor on-site, reconnection to the protruding reinforcement was achieved by injecting non-shrink mortar. It is important to note that Dextra does not supply the mortar; instead, it can be sourced locally, generating significant cost savings. Once the grout is injected, bracing around each panel can be removed after three days.

जामनगर रिफाइनरी विस्तार

Jamnagar Refinery Expansion: The World’s Largest Refinery by Production Capacity

Located in Gujarat, western India, the Jamnagar Refinery is the largest refinery in the world by production capacity. Owned by Reliance Industries, it was commissioned in 1998 and spans a vast 50 km² area.

For Phase 3 alone, more than 305,000 tons of steel मजबूतीकरण were used in a 36-month project, involving over 100,000 engineers and construction workers.
Dextra has been involved in Jamnagar since the early phases, supplying rebar splicing solutions for Phases 1, 2, and 3 of the project.

Dextra’s Rebar Splicing Solutions for Phase 3:

Three rebar coupler solutions were used in Phase 3:

  • Bartec Solution
    Used for cast-in-situ applications, including bar-to-bar connections in foundations, pile cages, and column cages.
    Also utilized in heavily congested rafts and pile caps to facilitate efficient रीबार स्प्लाइसिंग.
  • Groutec Couplers
    Applied to pipe racks, which were constructed from प्रीकास्ट elements in a dedicated प्रीकास्ट factory within the project.
    Positioned in the bottom elements and filled with grout, eliminating the need for in-situ wet जोड़ों and ensuring fast, secure connections between beams and columns.
  • Unitec Couplers
    Used in applications where rebar length was too short to allow traditional overlap connections.

image06

फ़ॉरेस्ट सिटी जोहोर 森林城市

फ़ॉरेस्ट सिटी जोहोर 森林城市

फ़ॉरेस्ट सिटी एक व्यापक मिश्रित उपयोग वाला शहरी विकास है जो मलेशिया के दक्षिणी सिरे, इस्कंदर क्षेत्र, जोहोर में हो रहा है। यह विकास सिंगापुर की दृष्टि में जोहोर स्ट्रेट के पार पुनः प्राप्त भूमि पर हो रहा है।

यह परियोजना, जो अगले दशक तक जारी रहेगी, अंततः 300,000 आवासीय इकाइयाँ बनाने का लक्ष्य है, जिसमें 700,000 लोगों के साथ-साथ कई व्यावसायिक इमारतें भी होंगी।

The Forest City project is expected to fuel the region’s economy, as well as Singapore, as light rail and road links will ultimately make the connection across the island state.

डेक्सट्रा has been involved since the early phases of the project for the supply of its ग्रौटेक एस precast solution. ग्रौटेक allow the swift connection of precast columns and panels, without the need of in situ joints, speeding up the construction project. For the Forest City Project, ग्रौटेक एस आवासीय टावरों की कतरनी दीवारें बनाने वाले पैनलों को जोड़ने के लिए कप्लर्स (कॉम्पैक्ट मॉडल) का उपयोग किया गया था।

The Forest City project is supported by the installation at site of several sets of बार्टेक threading equipment, which prepare the bars with threads in order to perform the connection with the top part of the ग्रौटेक एस sleeve. The Dextra aftersales team also provided training and support in order to guarantee high production output during the project duration.

For more information about डेक्सट्रा solutions in Asia, please contact our बैंकॉक कार्यालय