डेक्सट्रा ग्रुप | विश्वसनीय कनेक्शन

खोज
इस खोज बॉक्स को बंद करें.
खोज
इस खोज बॉक्स को बंद करें.

San’ao Nuclear Power Plant 1&2, China

 

San’ao Nuclear Power Plant 1&2, China

 
 

डेक्सट्रा has successfully supplied 340,000 ग्रिपटेक couplers for the anti-aircraft impact shell construction of the San’ao Nuclear Power Plant units 1 and 2, featuring the advanced HPR1000 Hualong reactors.

ग्रिपटेक, recognized as the only 100% proofed splicing system, has gained the trust of over ten nuclear reactors globally, cementing its reputation for reliability and safety in high-stakes environments. The system’s stringent quality assurance processes ensure that each coupler meets the demanding standards required for nuclear applications, providing unparalleled performance and durability.

One of the standout features of ग्रिपटेक is its high-productivity bar end preparation equipment. This state-of-the-art machinery boasts an impressive processing speed of 30 to 45 seconds per bar end, significantly enhancing construction efficiency. Additionally, the equipment is designed for operation by a single operator, optimizing workforce utilization.

Moreover, डेक्सट्रा is the first manufacturer of products for civil works construction whose quality management system is ISO 19443 certified for nuclear safety. This certification underscores डेक्सट्रा‘s commitment to the highest standards of safety and quality in the nuclear industry, reflecting the company’s dedication to excellence and reliability.

The San’ao Nuclear Power Plant project is a key component of China’s strategic initiative to expand its nuclear power capacity, which is vital for meeting the country’s growing energy needs while reducing carbon emissions. By supplying ग्रिपटेक couplers, डेक्सट्रा is playing a crucial role in ensuring the safety and efficiency of this project.

 

A66 Salzbachtal Bridge, Germany

 

A66 Salzbachtal Bridge, Germany

 
 

The A66 Salzbachtal Bridge, located in Wiesbaden, Hesse, is a 304-meter-long, four-lane motorway bridge on the A66. Originally constructed in the mid-20th century, the bridge has been subject to wear and tear due to increasing traffic loads and aging infrastructure.

Foundation piles are fundamental to the stability and longevity of bridge structures. Ensuring their integrity is crucial to preventing potential structural failures. डेक्सट्रा played a pivotal role by supplying approximately 10,000 linear meters of सोनीटेक CSL (Cross Sonic Logging) tubes.

Sonic tubes are essential components in the CSL testing method, which is widely regarded as one of the most reliable techniques for assessing deep foundation integrity. सोनीटेक, designed for easy installation within the reinforcement cage, facilitates accurate cross-hole sonic logging, allowing engineers to precisely detect and locate defects within the piles.

 

(Image credit: PORR Deutschland, Wilhelm Schütz)

Cross Island Line (CRL) MRT, Singapore

 

Cross Island Line (CRL) MRT, Singapore

 
 

डेक्सट्रा has played a pivotal role in the construction of Singapore’s Cross Island Line (CRL) MRT project, supplying Glass Fiber Reinforced Polymer (GFRP) soft-eyes, बार्टेक couplers and सिर वाली बार्स for several crucial packages. डेक्सट्रा continues to support the ongoing packages of this extensive project.

The CRL is set to become Singapore’s eighth MRT line and its longest fully underground line, stretching over 50 kilometers. The project is being executed in three phases, with the first phase anticipated to be operational by 2030.

To minimize the environmental impact on the forested areas of the nature reserve, engineering solutions were meticulously chosen to further mitigate environmental disruption. These solutions include digging deeper into the ground and employing a large diameter boring machine, capable of accommodating two train tracks within a single tunnel. This approach not only reduces the surface footprint but also enhances the efficiency of the tunneling process.

Tunnel Boring Machines (TBMs) are a staple in Singapore’s subterranean infrastructure projects, adept at operating under a variety of ground conditions. The use of GFRP soft-eyes supplied by डेक्सट्रा is integral to these operations. Soft-eyes are essential components in TBM tunneling, acting as temporary openings that allow the TBM to break through concrete walls without compromising structural integrity. The GFRP material is preferred for its high strength-to-weight ratio, corrosion resistance, and ease of installation, ensuring safe and efficient tunneling operations.

डेक्सट्रा‘s expertise and reliable supply of GFRP soft-eyes, बार्टेक couplers and headed bars have significantly contributed to the progress of the CRL project, aligning with Singapore’s commitment to sustainable and innovative infrastructure development. As the CRL project advances, डेक्सट्रा remains a key partner, supporting the construction of this monumental MRT line that will eventually enhance the daily commute for millions of Singaporeans.

 

$23,000 Contribution to Healthcare and Rural Development in India

 

We are thrilled to share that our team in India has contributed over $23,000 this year to support vital community initiatives through our CSR activities!

  1. Donation to Pranav Foundation to support essential dialysis services at government hospitals, ensuring critical healthcare reaches those in need.
  2. Support the rural development programs of ALOG Welfare Foundation by visiting the villages of Ghole, Vaghadi, and Bharad near Charoti (approximately 130 km from Mumbai towards Boisar) and engaging in various activities:
    • Distributed food to elderly residents.
    • Provided qualified teachers and volunteers for English language classes for village students.
    • Offered bag stitching training for women, empowering them with opportunities for economic independence.
    • Distributed wheelchairs to people with disabilities.

We’re proud of our team’s commitment to making a difference and fostering positive change in these communities. Together, we are building a brighter future! 💪🌍❤️

Explore more about our CSR initiatives: https://www.dextragroup.com/sustainability/social-sustainability/

Contact our team in India: https://www.dextragroup.com/contact-us/india/

Dextra Joins France Alumni Day 2024 in Thailand

 

Dextra had an incredible time participating in the France Alumni Day (FAD) 2024 in Thailand! This fantastic event, hosted by the French Embassy in Thailand in partnership with the Alliance Française de Bangkok and the Franco-Thai Chamber of Commerce, was a wonderful gathering of former students and graduates of French higher education.

The “Study & Job Fair” was a highlight, offering a great opportunity to connect with leading French and Thai companies. We were thrilled to meet so many enthusiastic participants at our booth!

As a company founded by French entrepreneurs, we are proud to continue our partnership with major French associations in Thailand. We’re always on the lookout for talented candidates from France, Thailand, and all around the world to join our dynamic team.

Learn more about Dextra: https://www.dextragroup.com/

Be part of our team: https://www.dextragroup.com/life-at-dextra/

Dextra and Arkema Forge Partnership to Revolutionize Composite Solutions

Arkema, a titan in specialty materials with a robust focus on sustainable innovations, has joined forces with Dextra Group, a pioneer in the construction industry known for its cutting-edge Glass Fiber Reinforced Polymer (GFRP) solutions, to unleash groundbreaking composite fiber solutions. This collaboration is set to redefine industry standards, leveraging Arkema’s acclaimed Elium thermoplastic resin and Dextra’s innovative FRP rebar to deliver unique, high-performance materials focused on sustainability and efficiency in construction.

The partnership marks a visionary step towards the future of construction materials, positioning both Arkema and Dextra Group at the forefront of technological acceleration in the composites sector. Through this initiative, they aim to drive the adoption of composite material in construction, emphasizing innovative solutions, sustainability, and the superior qualities of Glass Fiber Reinforced Polymer, thus setting a new benchmark for quality and innovation in the industry.

Dextra’s innovative FRP rebar, combined with Arkema’s Elium® resin, presented at JEC World 2024, encapsulates the essence of this partnership, highlighting Dextra’s leadership in GFRP innovation for the construction industry.

Overview of Arkema and Dextra Group’s Collaboration

In a groundbreaking collaboration, Arkema, a global leader in specialty chemicals, has joined forces with Dextra Group, a trailblazer in the construction industry. This partnership is set to revolutionize the construction sector with the introduction of innovative composite solutions. Below are the key aspects of this collaboration:

  • Arkema’s Contribution:
    • Leveraging its expertise in specialty materials, Arkema brings to the table its pioneering Elium® thermoplastic resin, known for its exceptional performance in enhancing the strength and durability of composites.
  • Dextra Group’s Role:
    • Operating in over 55 countries, Dextra Group’s expertise in engineered steel and fibre-reinforced polymer construction products sets a solid foundation for this collaboration. The focus on sustainability is evident through Dextra’s introduction of Environmental Product Declarations (EPDs) for their products, showcasing a shared vision for a greener future.

This collaboration not only underscores the commitment of both organizations to pioneering sustainable, high-performance materials but also sets Dextra apart as a leader in GFRP innovation within the construction sector.

Arkema’s Elium Thermoplastic Resin and Dextra’s FRP Rebars

At the heart of the collaboration between Arkema and Dextra Group lies the integration of Arkema’s Elium® thermoplastic resin with Dextra’s innovative FRP rebars, setting a new standard in the construction industry for composite fiber solutions. This partnership leverages the unique properties of Elium® resin, including:

  • Hot Bending on Site: Elium® resin allows for the hot bending of FRP rebars directly on construction sites, offering unparalleled flexibility and cost-efficiency. This feature is a game-changer, simplifying logistics and enabling more complex architectural designs.
  • Sustainable and High Performance: This new generation of resin can be made with up to 92% recycled material. At the end of the products lifetime (120+ Years), it can be broken down to separate the resin and fiber elements. This allows the resin to be recycled and reused while the fiber can be upcycled to be used as reinforcement in asphalt and concrete.

Arkema’s collaboration with Dextra to develop bendable reinforcements using Elium® resin further underscores the innovative spirit of this partnership. This endeavor not only makes reinforcements more flexible but also enhances their resistance properties, longevity, and aesthetic appeal, mirroring natural stone.

Through this collaboration, Dextra Group is positioned as a leader in GFRP innovation, differentiating itself from other producers by harnessing the unique benefits of Arkema’s Elium® resin and its unique manufacturing process.

 

Fortec+ Hong Kong Buildings Department Approved!

Dextra, the leading provider of construction solutions, has received official approval for Fortec+ from the Buildings Department (BD) of the Government of Hong Kong. This approval marks a significant milestone not only for Dextra but also for the entire construction sector in the region.

The approval granted by the BD signifies the endorsement of Fortec+’s cutting-edge parallel thread mechanical splice system. This innovative solution has been proven to offer unprecedented efficiency, reliability, and safety in structural projects.

As the regulatory authority responsible for overseeing building construction and safety standards in Hong Kong, the BD’s endorsement serves as a testament to the reliability and compliance of Fortec+’s technology with local regulations and industry best practices.

“Bar Break” splicing system

Fortec+ is a complete tensile splice system, ensuring bar-break performance of up to 800MPa under tensile load.

 

Compliant with Hong Kong standards

Fortec+ meets the Buildings Department’s Code of Practice for Structural Use of Concrete 2013 and is listed on the Central Data Bank List of Building Materials.

 

Reliable solution

The Plus (+) entails additional testing of proof load, ensuring the most reliable connections through a single set of thread preparation equipment.

 

Technical support

Our team in Hong Kong are available to accompany you through each step of the design process using readily available CAD/BIM tools and during onsite installation.

Trusted by Various Iconic Projects Across Hong Kong!

Penny’s Bay and Kai Tak Community Isolation Facility

Central Kowloon Route – Central Tunnel

Trunk Road T2

Tseung Kwan O – Lam Tin Tunnel

Dextra Achieves New Milestone for Hinkley Point C Project

Dextra, in conjunction with our esteemed partners EDF, BYLOR and Express Reinforcements Ltd., is thrilled to announce a significant achievement: the successful provision of an astounding 2.5 million Griptec connections and 3 million headed bars for the monumental Hinkley Point C nuclear power plant project in the UK!

This milestone serves as a testament to Dextra’s dedication to quality, excellence, and the capability to execute large-scale, intricate projects.

The commitment and adaptability of the Dextra team have been pivotal in ensuring the seamless operation of the supply chain, facilitating timely progress at every juncture.

Dextra is privileged to contribute significantly to the advancement of sustainable energy and is honored to play a vital role in shaping the future.

Breaking Ground: GEOTEC Joins Sustainability Drive with EPDs!

We are proud to share the latest addition to our sustainability journey: EPDs (Environmental Product Declarations) for GEOTEC are here! Check out our geotechnical products now officially published on the EPD Hub website:

This another accomplishment builds on our commitment to eco-conscious construction, following EPDs for rebar couplers, GFRP rebar, and marine tie bars. Our dedication doesn’t stop there – stay tuned as we work on EPDs for more of our solutions!

EPD Report for GEOTEC Steel Ground Anchor

EPD Report for GEOTEC Steel Ground Anchor

पीडीएफ फाइल प्रदर्शित करने में असमर्थ. डाउनलोड करना बजाय।

EPD Report for GEOTEC Steel Self-Drilling Rock-Bolt

EPD Report for GEOTEC Steel Self-Drilling Rock-Bolt

पीडीएफ फाइल प्रदर्शित करने में असमर्थ. डाउनलोड करना बजाय।

EPD Report for GEOTEC Steel Combination Bolt

EPD Report for GEOTEC Steel Combination Bolt

पीडीएफ फाइल प्रदर्शित करने में असमर्थ. डाउनलोड करना बजाय।

Dextra’s Quarterly Newsletter: Connection #36

Welcome to our first newsletter of 2024. On behalf of all Dextra employees, we extend our warmest wishes to you and your loved ones for a joyous and prosperous New Year and Chinese New Year!

As we bid farewell to 2023, a remarkable year for us as we celebrated our 40 years of establishment, we want to express our heartfelt gratitude to you for your presence in our celebration events which added a special touch to our milestone.

In 2024, we eagerly look forward to continuing our collaboration with you. Your dedication and support have been instrumental in our success, and we are excited about the opportunities and achievements that lie ahead.

Thank you for being a valued part of the Dextra family!


India’s Longest Sea Bridge

Unveiled for Public Journeys

The 22-km Mumbai Trans Harbour Link (MTHL), connecting Mumbai with Navi Mumbai, features a 6-lane, 27-meter-wide highway with two emergency exit lanes. Recently opened this month, this sea bridge, the longest in India, aims to alleviate Greater Mumbai’s traffic congestion. Dextra’s contribution includes supplying 290,000 Bartec couplers for concrete structure reinforcement and 50,000 Sonitec sonic tubes for CSL testing in barrette piles.

Read more about our contribution

 

More about our latest projects

Click on the pictures to read more:

 

Grand Inauguration of Dextra’s

State-of-the-Art Factory in India!

We are thrilled to announce the successful inauguration of our brand-new factory in Pune, Maharashtra, India!

Equipped with cutting-edge machinery, our 12,000 square-meter facility is now in full swing to meet the highest industry standards. We produce top-quality rebar couplers at double capacity, Sonitec tubes, and have introduced a new facility for manufacturing GFRP rebars. Additionally, it is equipped with an in-house testing laboratory and workspace for the repair and refurbishment of site equipment.

The factory boasts a comfortable working environment designed with the well-being of our incredible team in mind. Safety is our priority, and our new facility reflects our commitment to providing an outstanding workplace for our dedicated employees.

Watch the video to get an exclusive peek into the joyous celebrations that marked this milestone for Dextra.

Watch the video on YouTube

 

Recent activities

Factory 2 in Thailand Achieves Green Industry Level 3 Certification

Following in the footsteps of our Level 3-certified Factory 1 in Bangkok, Thailand, Factory 2 has recently been awarded the same Green System certification by the Ministry of Industry of Thailand. This illustrates our commitment to systematic environmental management, rigorous monitoring, evaluation, and continuous improvement.

Environmental Leadership Honored: Dextra Receives Award in China

Dextra received the Environmental Leadership Award at the Sino-French GBA Business Summit in Guangzhou, China, in recognition of its outstanding contribution to environmental sustainability. Our GFRP rebars, key players in reducing CO2 emissions compared to traditional steel rebars, underscore our commitment to building a greener, more sustainable future.

 

Upcoming events

कृपया अपनी जानकारी दर्ज करें

संपर्क करें

   अपनी जानकारी हमारे साथ साझा करें और हम यथाशीघ्र आपसे संपर्क करेंगे।