Qatar’s General Electricity & Water Corporation (KAHRAMAA) is currently building fresh water reservoirs to store the equivalent of 7 days of Qatar’s national consumption of fresh water at WHO (World Health Organization) standards. The primary reservoirs are located in five different sites in Doha area: Um Baraka, Um Salal, Rawdat Rashid, Abu Nakhla, and Al Thumama.
The first phase of the project involves the construction of 5 mega reservoir sites, and will support the expected water demand at horizon 2026. The second phase includes the construction of 16 additional reservoirs within the five existing mega sites. With a capacity of 3.5 million m3 each, the Reservoirs are among the largest of their kind in the world.
For this project, Dextra Middle East delivered more than 3 million बार्टेक couplers to the rebar fabricators and contractors involved on the different packages.
Project requirements regarding corrosion protection specify that the complete reinforcement, including couplers, should be epoxy coated. Dextra is therefore delivering all Bartec couplers with epoxy coating, giving them a distinctive green look.
Couplers are used in the raft and columns all over the different reservoirs as a way to reduce steel congestion and generate savings.