Chennai Metro Phase 2, India

 

Chennai Metro Phase 2, India

 
 

The Chennai Metro Phase 2 project is set to redefine urban transportation in one of India’s largest cities, promising enhanced connectivity and efficiency. Playing a pivotal role in the success of this ambitious project, Dextra has supplied an array of cutting-edge construction solutions to meet the project’s demanding structural and safety requirements.

Ensuring Robust Connections with Bartec Rebar Couplers

Dextra supplied nearly 2 million Bartec rebar couplers, essential for creating secure connections across various structural components. These couplers have been utilized extensively in the connections for diaphragm wall (d-wall) caging and slabs, pile cages, piers, and pier caps. By ensuring high-strength rebar connections, Bartec couplers contribute to the overall durability and resilience of the metro structure, particularly important in a densely populated and busy urban environment like Chennai.

Precision Testing with Sonitec CSL Testing Tubes

To ensure the highest standards of concrete integrity, Dextra provided over 80,000 Sonitec crosshole sonic logging (CSL) testing tubes. These tubes facilitate rigorous testing of piles and d-walls, helping to identify potential flaws within the concrete structure. This meticulous testing process enables project engineers to detect and address any irregularities, safeguarding the integrity and longevity of the metro’s foundations.

Supporting Complex Structures with CR Bar 1080 Post-Tensioning Bars

For the support of double-decker piers and the pre-tensioning of U-girders, Dextra supplied 68 CR Bar 1080 post-tensioning bars. These high-strength, fully threaded bars are critical in handling the complex loads and stresses that the elevated sections of the metro will endure. The inclusion of these bars ensures that the metro can withstand heavy traffic and operational demands over time, contributing to the long-term safety and functionality of the infrastructure.

Facilitating Tunnel Boring with GFRP Soft-Eyes

In the tunneling phase, Dextra also provided 42 GFRP soft-eyes, specifically designed for tunnel boring machine (TBM) operations. These soft-eyes allow TBMs to pass through concrete walls smoothly, ensuring safe and efficient tunneling while reducing the risk of structural damage. GFRP’s non-corrosive properties make it an ideal choice for underground construction, where durability and performance are paramount.

Building a Safer, Stronger Future

Dextra’s commitment to supplying top-tier construction materials and solutions underscores its dedication to the Chennai Metro Phase 2 project. As the metro takes shape, Dextra’s innovations contribute not only to the project’s success but also to the future of Chennai’s urban infrastructure, setting new standards in construction excellence and sustainability.

Mumbai Metro Line 2B, India

 

Mumbai Metro Line 2B, India

 
 

The Mumbai Metro Line 2B, an essential link connecting several key areas of the city, is a significant infrastructure project aimed at alleviating Mumbai’s traffic congestion and providing efficient public transport. As part of this ambitious project, Dextra has made a valuable contribution, supplying engineered construction materials to ensure the durability and reliability of the structure.

CR Bar 1080 for U-Girder Stressing and Pre-Tensioning

One of the critical components of the project is the elevated section of the metro, which relies on U-girders for support. To enhance the strength and resilience of these U-girders, Dextra supplied its innovative CR Bar 1080 cold-rolled fully threaded post-tensioning bars. These bars, with a diameter of 75mm, are specifically designed to withstand high stress during both U-girder stressing and pre-tensioning operations. The hexagonal nuts provided as part of the system allow for secure fastening and easy adjustment, ensuring precise tensioning to meet the structural demands.

 

Fully Threaded (FT) Bar for Segment Stitching and Temporary Stressing

For segment stitching and temporary stressing operations during the construction of the metro viaduct, Dextra supplied its fully threaded (FT) bars. These bars provide secure connections between precast segments and offer flexibility for adjustments during the stitching process, ensuring that the structural alignment is perfect before the segments are permanently joined.

Unitec Couplers for Rebar Connections

In addition, Dextra supplied Unitec couplers, designed for connecting rebars at construction sites without the need for pre-threading. These couplers offer a convenient and robust solution, allowing for seamless connection of two rebars, ensuring structural continuity and strength without delays in the construction process.

Sonitec CSL Testing Tubes for Concrete Pile Integrity

In addition to supplying post-tensioning bars, Dextra also provided Sonitec Crosshole Sonic Logging (CSL) testing tubes for the integrity testing of the concrete piles supporting the metro structures. These tubes enable highly accurate non-destructive testing of the concrete, allowing engineers to detect any potential flaws or weaknesses in the piles. This testing is vital for ensuring the piles meet the necessary strength and quality standards, thereby supporting the entire metro system safely and effectively.

Enhancing Metro Connectivity with Quality Solutions

As the Mumbai Metro Line 2B progresses towards completion, Dextra’s contributions to the project highlight its role in providing advanced engineering solutions for infrastructure development. The combination of सीआर बार 1080 for post-tensioning, fully threaded bars for segment stitching, Unitec couplers for rebar connection, and Sonitec CSL testing tubes for pile integrity showcases Dextra’s commitment to quality, innovation, and safety in major construction projects.

By contributing to this key metro line, Dextra is playing a part in shaping the future of urban mobility in Mumbai, ensuring that the metro system will be reliable and capable of supporting the city’s growing transportation needs for years to come.

Central Kowloon Route (CKR) – Central Tunnel, Hong Kong

 

Central Kowloon Route (CKR) – Central Tunnel, Hong Kong

 
 

Dextra played a pivotal role in the construction of the Central Kowloon Route (CKR) – Central Tunnel project in Hong Kong by supplying Fortec+ couplers, along with steel rock bolts, expandable friction bolts, umbrella pipes, and post-tensioning bars for tunneling works. These mechanical rebar couplers were integral in ensuring strong and reliable connections within the road tunnel structure, meeting the stringent requirements for safety and durability.

The CKR, a major infrastructure project aimed at improving traffic flow across Kowloon, required advanced construction techniques. Dextra’s Fortec+ couplers, used in locations such as precast panels, tunnel access points, and driveways, contributed significantly to the project’s structural integrity and long-term performance. The Fortec+ system includes a rebar preparation process in which the threaded bar end is proof tested with a tensile load, ensuring non-destructive testing within the elastic zone of the reinforcing bar.

 

Image credit: Central Kowloon Route – Highways Department

San Shek Wan Sewage Treatment Works, Hong Kong

 

San Shek Wan Sewage Treatment Works, Hong Kong

 
 

The San Shek Wan Sewage Treatment Works (STW) project in Hong Kong marks a significant step towards addressing the sewage disposal needs of the South Lantau region. As the population of South Lantau is projected to grow, with an ultimate population reaching approximately 12,600 by 2039, the sewage flow is anticipated to increase to 5,800 m³/day. To accommodate this, a comprehensive sewerage system is being constructed, which includes a trunk sewerage system for Pui O area, a secondary STW at San Shek Wan, and a village sewerage system for Lo Uk.

A critical component of this ambitious infrastructure project is the use of advanced materials and technologies to ensure its successful and sustainable completion. Dextra, a global leader in engineered construction products, has played a pivotal role by supplying Glass Fibre Reinforced Polymer (GFRP) soil nails for the excavation and lateral support (ELS) works.

The Role of GFRP Soil Nails in ELS Works

The excavation and lateral support works are essential to the project’s foundation and stability. The challenging geotechnical conditions in Hong Kong, characterized by complex soil and rock formations, necessitate the use of robust and reliable reinforcement solutions. GFRP soil nails, provided by Dextra, are ideal for such conditions due to their high tensile strength, corrosion resistance, and lightweight nature.

GFRP soil nails are used to stabilize slopes and excavations, preventing landslides and soil erosion. Their corrosion resistance is particularly beneficial in environments exposed to moisture and chemicals, such as sewage treatment works. This ensures a longer lifespan and reduced maintenance costs compared to traditional steel reinforcement.

Benefits of Dextra’s GFRP Solutions

  1. Corrosion Resistance: Unlike steel, GFRP does not corrode when exposed to harsh environmental conditions. This makes it an excellent choice for the wet and chemically aggressive conditions present in sewage treatment works.
  2. High Strength-to-Weight Ratio: GFRP offers a high tensile strength comparable to steel but at a fraction of the weight. This ease of handling and installation translates to time and labor savings.
  3. Durability: The longevity of GFRP soil nails ensures the structural integrity of the excavation and lateral support systems over the extended operational life of the sewage treatment works.
  4. वहनीयता: By using GFRP, the project reduces its reliance on steel, thereby contributing to more sustainable construction practices.

Impact on the San Shek Wan STW Project

Dextra’s involvement and the implementation of GFRP soil nails have significantly enhanced the efficiency and sustainability of the San Shek Wan STW project. The advanced materials have ensured that the excavation and lateral support works are not only robust and reliable but also cost-effective over the long term.

Upon completion, the sewage from South Lantau will be conveyed to the newly constructed STW for proper treatment. The treated effluent will then be safely discharged into the sea about 1.4 km off the South Lantau coast, ensuring minimal environmental impact. This project represents a crucial infrastructure upgrade that will support the region’s growth and development while maintaining high environmental and operational standards.

 

Cairo Monorail Bowstring Bridge, Egypt

 

Cairo Monorail Bowstring Bridge, Egypt

 
 

The Cairo Monorail Bowstring Bridge project, a pivotal part of Egypt’s expanding urban infrastructure, has significantly benefited from the expertise and quality products supplied by Dextra. Known for their innovative engineering solutions, Dextra provided critical materials to support the construction of this state-of-the-art transportation link.

In particular, Dextra supplied tension rods in two distinct specifications for the project:

  1. M78/OD75 in Grade CS520 – A total of 60 sets were delivered.
  2. M83/OD80 in Grade CS520 – An additional 8 sets were provided.

These tension rods were specifically used as hangers for the bowstring bridge, ensuring a high level of strength and durability, which is crucial for the safety and longevity of the bridge, to maintain structural integrity and withstand the stresses of daily monorail operations.

Dextra’s tension rods, known for their high tensile strength and resistance to environmental factors while providing architectural pleasure, played a critical role in meeting these demands. This involvement underscores the importance of reliable and advanced engineering solutions in modern infrastructure projects, highlighting Dextra’s commitment to excellence and innovation in the field of civil engineering.

 

Cross Island Line (CRL) MRT, Singapore

 

Cross Island Line (CRL) MRT, Singapore

 
 

डेक्सट्रा has played a pivotal role in the construction of Singapore’s Cross Island Line (CRL) MRT project, supplying Glass Fiber Reinforced Polymer (GFRP) soft-eyes, बार्टेक couplers and सिर वाली बार्स for several crucial packages. डेक्सट्रा continues to support the ongoing packages of this extensive project.

The CRL is set to become Singapore’s eighth MRT line and its longest fully underground line, stretching over 50 kilometers. The project is being executed in three phases, with the first phase anticipated to be operational by 2030.

To minimize the environmental impact on the forested areas of the nature reserve, engineering solutions were meticulously chosen to further mitigate environmental disruption. These solutions include digging deeper into the ground and employing a large diameter boring machine, capable of accommodating two train tracks within a single tunnel. This approach not only reduces the surface footprint but also enhances the efficiency of the tunneling process.

Tunnel Boring Machines (TBMs) are a staple in Singapore’s subterranean infrastructure projects, adept at operating under a variety of ground conditions. The use of GFRP soft-eyes supplied by डेक्सट्रा is integral to these operations. Soft-eyes are essential components in TBM tunneling, acting as temporary openings that allow the TBM to break through concrete walls without compromising structural integrity. The GFRP material is preferred for its high strength-to-weight ratio, corrosion resistance, and ease of installation, ensuring safe and efficient tunneling operations.

डेक्सट्रा‘s expertise and reliable supply of GFRP soft-eyes, बार्टेक couplers and headed bars have significantly contributed to the progress of the CRL project, aligning with Singapore’s commitment to sustainable and innovative infrastructure development. As the CRL project advances, डेक्सट्रा remains a key partner, supporting the construction of this monumental MRT line that will eventually enhance the daily commute for millions of Singaporeans.

 

Grand Paris Express – Line 14

Grand Paris Express – Line 14

ग्रैंड पेरिस एक्सप्रेस फ्रांसीसी राजधानी के चारों ओर होने वाली एक प्रमुख शहरी परिवहन परियोजना है। परियोजना में 4 नई लाइनें (लाइनें 15, 16, 17 और 18) जोड़ी जाएंगी और दो मौजूदा लाइनें (11 और 14) का विस्तार किया जाएगा।

डेक्सट्रा अपने स्थानीय वितरक भागीदारों के माध्यम से कई स्टेशनों के पैकेजों में शामिल रहा है। विशेष रूप से लाइन 14 पर, डेक्सट्रा ने ऑर्से और पोंट कार्डिनेट के स्टेशनों में फोर्टेक रीबार कप्लर्स की आपूर्ति की।

पेरिस के उत्तर में मेट्रो लाइन 4 और भविष्य की लाइन 15 के क्रॉसिंग पर स्थित बैगनेक्स स्टेशन के लिए, डेक्सट्रा ने अपने एएसटीईसी एक्टिव एंकर की आपूर्ति की।

एएसटीईसी एक्टिव एंकर सबवे स्टेशनों के काम के लिए पसंदीदा समाधान हैं क्योंकि टनल बोरिंग मशीनें और अर्थ-मूविंग उपकरण किसी भी स्तर पर एंकर के एफआरपी टेंडन को आसानी से काट सकते हैं, जिससे एंकर को अविश्वसनीय और महंगा हटाने की आवश्यकता समाप्त हो जाती है। इस परियोजना के लिए परामर्श फर्म सिस्ट्रा द्वारा समाधान को मंजूरी दी गई थी।

मध्य पूर्व में कई सफल परियोजनाओं के बाद, यह पहली बार था जब ASTEC एक्टिव एंकर (एक हालिया डेक्सट्रा नवाचार) यूरोप में स्थापित किया गया था।

शा ताऊ कोक सीवेज उपचार कार्य चरण 1 का विस्तार

शा ताऊ कोक सीवेज उपचार कार्य चरण 1 का विस्तार

The Sha Tau Kok Sewage Treatment Works Phase 1 Expansion project stands as a testament to Hong Kong’s commitment to environmental sustainability and efficient wastewater management. It aims to increase the treatment capacity, ensuring that the city’s sewage is processed efficiently and in an environmentally responsible manner. A remarkable feature of this expansion is the use of Groutec S couplers to seamlessly link precast columns of the building.

Groutec is designed for the efficient and easy installation of precast concrete elements, reducing construction time and labor costs while providing full structural connection. For this project, Groutec S diameter 32mm precast couplers have been used to connect precast columns in vertical applications. The Groutec coupler is installed in the bottom element, and then grout is poured by gravity directly into the coupler cavity. This process ensures the structural integrity and longevity of the facility.

दोहा मेट्रो मशीरेब स्टेशन

दोहा मेट्रो मशीरेब स्टेशन

मशीरेब स्टेशन दोहा मेट्रो का प्रमुख इंटरचेंज स्टेशन है। डाउनटाउन दोहा में स्थित, यह सभी तीन लाइनों (लाल, हरा और सोना) को जोड़ता है और 2022 फीफा विश्व कप 2022 स्टेडियमों के लिए एक प्रवेश द्वार प्रदान करेगा।

मशीरेब स्टेशन आकार के हिसाब से दुनिया के सबसे बड़े सबवे स्टेशनों में से एक बन जाएगा।

टीबीएम के लिए सॉफ्ट-आइज़

इस प्रमुख परियोजना के लिए, डेक्सट्रा ने 2013 और 2015 के बीच 8 मीटर व्यास वाले 8 बड़े ASTEC GFRP सॉफ्ट-आइज़ की इंजीनियरिंग और आपूर्ति की। सॉफ्ट आइज़ जीएफआरपी सरिया के पिंजरे हैं, जो स्टील खंडों के बीच डी-दीवारों में स्थित हैं। जीएफआरपी सॉफ्ट-आइज़ टनल बोरिंग मशीनों (टीबीएम) को कम से कम समय में गुजरने की अनुमति देती है क्योंकि टनल मशीन द्वारा सलाखों को आसानी से कुचला जा सकता है।

टाई-बैक एंकर

विशाल डी-दीवारों को मजबूत करने और उत्खनन कार्यों के दौरान किसी भी मिट्टी के विस्थापन को रोकने के लिए, डेक्सट्रा ने अपने एएसटीईसी सक्रिय एंकर (एएए) की भी आपूर्ति की। उन नवोन्मेषी पोस्ट-टेंशन वाले जीएफआरपी-आधारित एंकरों को टनल बोरिंग मशीनों या मानक उत्खनन उपकरणों द्वारा काटे जाने का लाभ मिलता है। क्योंकि इसे आसानी से काटा जा सकता है, इसलिए इसे जमीन से हटाने की आवश्यकता नहीं होती है, भले ही इसका उपयोग अस्थायी अनुप्रयोगों के लिए किया जाता हो।

मशीरेब स्टेशनों के मामले में, डी-वॉल को एंकर करने के लिए सॉफ्ट-आई के केंद्र में मल्टी-टेंडन्स एंकर (इस प्रोजेक्ट पर प्रति एंकर 10) भी स्थापित किए गए हैं। सुरंग तोड़ने के दौरान उन एंकरों को भी काट दिया गया था (नीचे दिए गए वीडियो में दिखाई दे रहा है)। स्टेशन पर कुल 150 लंगर लगाए गए।

बैंकॉक बीटीएस

बैंकॉक बीटीएस

बैंकॉक मास ट्रांजिट सिस्टम (बीटीएस) थाईलैंड की राजधानी बैंकॉक में स्थित एक बड़ी शहरी स्काईट्रेन प्रणाली है। इस प्रणाली का उद्घाटन 1999 में किया गया था।

2017 तक, सिस्टम में 24 एलिवेटेड स्टेशन और 37 किमी एलिवेटेड रेल शामिल हैं जो सियाम सेंट्रल स्टेशन में एक दूसरे को पार करने वाली दो मुख्य लाइनों में व्यवस्थित हैं।

बीटीएस प्रणाली अपनी दो मुख्य लाइनों के विस्तार के दौर से गुजर रही है और लाइन खंडों और स्टेशनों के 2019 और 2020 में परिचालन में आने की उम्मीद है।

नींव

पिछले कुछ वर्षों में विभिन्न पैकेजों के लिए, डेक्सट्रा ने सोनीटेक ट्यूबों की आपूर्ति की है, जिनका उपयोग स्टेशनों और रेल के नीचे कंक्रीट ढेर नींव का परीक्षण करने के लिए किया जाता है।

कुल मिलाकर, डेक्सट्रा ने लगभग 40,000 रैखिक मीटर सोनीटेक ट्यूबों की आपूर्ति की, यह दूरी वास्तव में बीटीएस सिस्टम की लंबाई के बराबर है।

तोरणों

पाइलॉन वर्टिकल बार कनेक्शन के लिए, डेक्सट्रा ने इसकी पेशकश की
बार्टेक कनेक्शन.
बार्टेक एक साधारण रीबार कपलर के उपयोग से पूर्वनिर्मित रीबार पिंजरों को आसानी से जोड़ने की अनुमति देता है, जिससे ओवरलैप की तुलना में स्टील में बचत होती है और साइट संचालन में तेजी आती है।

थाईलैंड में थ्रेडिंग ऑपरेशन को डेक्सट्रा की फैक्ट्री से समर्थन मिलता है, जो सुविधाजनक रूप से बैंकगोक के उत्तर पूर्व में स्थित है। ठेकेदारों को पहले से तैयार सरिया प्राप्त होता है और उन्हें उनके रीबार कपलर के साथ लगाया जाता है।

कृपया अपनी जानकारी दर्ज करें

संपर्क करें

   अपनी जानकारी हमारे साथ साझा करें और हम यथाशीघ्र आपसे संपर्क करेंगे।