Jal Jeevan Mission Water Reservoirs, India

 

Jal Jeevan Mission Water Reservoirs, India

 

The Jal Jeevan Mission of the Government of India is a flagship initiative where attempts are made to ensure adequate supplies of quality drinking water at affordable rates on a long-term basis. It emphasizes the importance of proper water management, infrastructure development, and community participation to achieve the ambitious goal of ‘Har Ghar Jal’ (Water to Every Household).

Considering the widespread geography of India, uneven terrain, and human settlements in remote locations, access to continuous water is a challenge. Therefore, overhead tanks are a good option for efficiently storing and distributing water, particularly in areas with inconsistent water supply patterns. Construction and infrastructure development are yet another key factors that have a direct influence on development.

Precast construction is one such method that has gained tremendous momentum in recent times due to its advantages, such as accelerated productivity, better quality control, environmental friendliness, and optimized material and labor usage. Although this method incurs high initial setup costs, its attractiveness is enhanced by large-scale projects with standardized designs. In the project, our team worked in close coordination with Larsen & Toubro (L&T) from the design stage, carefully selecting Groutec and Bartec couplers to connect the H and U frames of the overhead tanks.

Our range of Groutec couplers is arguably the most reliable mechanical splices, specially designed to connect two precast elements with no requirement for in-situ wet concrete joints. These couplers have been successfully qualified and tested over the years on several major infrastructure projects, including process plant pipe racks, residential and commercial buildings, and data centers, among others.

 

Tai Po Railway Pier – Reconstruction of Tai Po Kau Tide Gauge Station

 

Tai Po Railway Pier – Reconstruction of Tai Po Kau Tide Gauge Station, Hong Kong

 

In the dynamic coastal landscape of Tai Po Kau, New Territories, Hong Kong, infrastructure projects demand robust and resilient solutions. One such endeavor, the Reconstruction of Tai Po Kau Tide Gauge Station project, required innovative materials to withstand the unique challenges posed by its environment. Dextra was chosen to provide approximately 1,000 meters of Glass Fibre Reinforced Polymer (GFRP) rebar for the slab of the Tai Po Railway Pier, showcasing the efficacy of advanced composite materials in marine construction.

The Tai Po Kau Tide Gauge Station project aimed to revitalize the existing infrastructure, enhancing its resilience against tidal forces, corrosion, and environmental degradation. Recognizing the limitations of traditional steel reinforcement in marine environments, the project sought alternatives that could offer superior durability and longevity. Dextra’s GFRP rebar emerged as the ideal solution, offering exceptional resistance to corrosion, rust, and chemical degradation commonly associated with saltwater exposure.

GFRP rebar, composed of high-strength glass fibers embedded in a polymer matrix, delivers mechanical properties comparable to steel but with added benefits. Notably, GFRP rebar exhibits significantly lower thermal conductivity, reducing the risk of thermal bridging and enhancing structural integrity in extreme temperature variations. Furthermore, its non-magnetic properties eliminate electromagnetic interference, making it suitable for sensitive applications such as tide gauge stations.

The application of GFRP rebar within the Tai Po Kau Tide Gauge Station project encompassed both straight and bent bars, catering to the diverse structural requirements of the public pier. Dextra’s expertise in custom fabrication ensured precise bending and shaping of the rebar to fit the intricate geometries of the pier structure, facilitating seamless integration and minimizing construction complexities.

Nestlé LEO Factory, Thailand

 

Nestlé LEO Factory, Thailand

 

Nestlé LEO Factory’s reliance on precast elements necessitated a reliable, efficient method for joining the precast structure of the building. The construction utilized ग्रौटेक एफ, a well-known splicing system engineered by Dextra, to meet the exacting demands of the precast building. ग्रौटेक एफ allows for the connection of rebars without the need for bar end preparation and was used for the precast joint connection of beam and column in this project.

ग्रौटेक एफ is a fully grouted connection solution, ensuring robustness and durability in the face of dynamic operational environments. Engineered and manufactured in compliance with industry-leading standards such as Eurocode 2, BS 8110, ACI 318, IBC, and AASHTO, ग्रौटेक एफ guarantees adherence to rigorous structural specifications. It is compatible with major non-shrink grout brands readily available on the market, reducing logistical complexities and procurement lead times.

 

One Lake Club, Romania

 

One Lake Club, Romania

 

One Lake Club is a prestigious project promises to redefine luxury living in the Romanian capital. It aims to set new standards in urban living, offering residents an unparalleled blend of elegance, comfort, and functionality. The project encompasses a range of residential and recreational facilities, including luxury apartments, lush green spaces, and state-of-the-art amenities. With its ambitious vision and meticulous attention to detail, One Lake Club represents a beacon of modern architectural excellence in Bucharest.

As construction progresses on this ambitious venture, ensuring the structural integrity of the building is paramount. This is where Dextra’s बार्टेक couplers come into play. Renowned for their reliability and versatility, बार्टेक couplers provide robust connections between reinforcing bars, enhancing the strength and durability of concrete structures. In the case of the One Lake Club project, these couplers are specifically tailored for temporary opening applications, offering flexibility and efficiency in construction processes.

The 12mm बार्टेक couplers serve as the linchpin in the construction workflow, enabling seamless integration of reinforcing bars within the concrete framework. Their innovative design ensures quick and easy installation, minimizing construction time while maximizing safety and performance. By facilitating temporary openings in the concrete structure, these couplers enable efficient access for maintenance, inspection, and future modifications, thereby streamlining the construction process and ensuring long-term durability.

 

Uniqlo & Hive Warehouse, Indonesia

 

Uniqlo & Hive Warehouse, Indonesia

 

Indonesia’s building construction sector has driven the demand for rapid and efficient construction methods to accommodate its growing population. Precast construction has emerged as a key solution to these challenges, helping to reduce on-site labor, accelerate project timelines, and ensure consistent quality.

A seamless connection between structural elements is essential for the success of precast construction. Dextra supplied ग्रौटेक precast couplers for projects worldwide, including in Indonesia. ग्रौटेक couplers (20mm) were used in the Uniqlo & Hive Indonesia warehouse building project for joining precast columns, enabling rapid and reliable assembly while ensuring structural integrity.

The use of these couplers has minimized on-site labor requirements and expedited project milestones, leading to cost savings and timely project completion. This allows the building to become operational sooner. Additionally, the high-strength steel composition of the couplers, along with stringent quality control measures, ensures robust connections capable of withstanding dynamic structural loads.

 

एनर्जीकनेक्ट - व्हिटेंस बुरोंगा सबस्टेशन

एनर्जीकनेक्ट - व्हिटेंस बुरोंगा सबस्टेशन

The EnergyConnect project has emerged as a groundbreaking initiative that will revolutionize the sharing of electricity between New South Wales (NSW), Victoria, and South Australia. At the heart of this transformative project lies Dextra’s indispensable contribution—supplying almost 30,000 meters of glass fiber-reinforced polymer (GFRP) rebar in diameters of 13mm, 25mm, and 38mm. This not only marks a monumental step in the realm of construction but also advances the vision of a more sustainable and interconnected future.

एनर्जीकनेक्ट परियोजना

The EnergyConnect project is a testament to Australia’s commitment to enhancing energy infrastructure and promoting cooperation between states. This project aims to create a robust electricity transmission network, enabling the efficient sharing of power resources across three states. As Australia transitions towards cleaner and more sustainable energy solutions, the EnergyConnect project plays a pivotal role in fostering a resilient and interconnected power grid.

डेक्सट्रा का योगदान

Dextra supplied a substantial quantity of GFRP rebar, showcasing its commitment to providing cutting-edge and sustainable construction materials. The use of GFRP rebar is a game-changer in the construction industry, offering a corrosion-resistant alternative to traditional steel reinforcement.

The 30,000 meters of GFRP rebar, ranging in diameters from 13mm to 38mm, were strategically incorporated to reinforce electrical transmission lines और substation structures. This not only enhances the structural integrity of the infrastructure but also aligns with the broader goal of reducing the environmental impact of construction activities.

जीएफआरपी रेबार के लाभ

GFRP rebar, also known as fiberglass-reinforced polymer (FRP) rebar, offers several advantages in construction. Unlike traditional steel reinforcement, GFRP rebar is corrosion-resistant, making it an ideal choice for projects in regions with challenging environmental conditions. The EnergyConnect project, spanning multiple states with diverse climates, benefits immensely from this corrosion-resistant characteristic, ensuring the longevity and durability of the infrastructure.

Furthermore, GFRP rebar is significantly lighter than steel, simplifying transportation and handling during construction. This enhances efficiency and reduces labor costs, making it an attractive choice for large-scale projects like EnergyConnect.

Laem Chabang Port

Laem Chabang Port

The Port of Laem Chabang, located on the Gulf of Thailand, is the largest and busiest port in the country, surpassing even Bangkok Port. It is also the 4th busiest port in Southeast Asia. Situated in the Chonburi province, just a couple of hours’ drive from Bangkok and Dextra’s main production facility. The port plays a critical role in the region’s logistics and trade.

Dextra has been involved with the contractor, Italian-Thai, for the engineering and supply of steel structures for the new pier at Laem Chabang Port.

Dextra engineered and supplied its high-performance समुद्री टाई बार्स in Grade 700, the highest grade in our range. This grade offers an improved performance-to-steel ratio compared to lower grades like 355/510 and 500/660. It allows for the use of smaller diameter bars, leading to steel savings, and simplifies logistics and installation efforts.

The bars used in the long tendons were anchored into concrete piles and spliced using turnbuckles and couplers. In total, Dextra supplied 206 tons of समुद्री टाई बार्स for the Laem Chabang expansion project, contributing to the development of this key infrastructure.

मुबारक अल-कबीर

मुबारक अल-कबीर

Mubarak Al-Kabeer is a significant seaport located on the island of Bubiyan, east of Kuwait, with an open gateway to the Persian Gulf. This seaport plays a vital role in Kuwait’s maritime infrastructure and economic development.

Dextra was involved in Stage 2 of the first phase of the Mubarak Al-Kabeer construction project between 2011 and 2012, collaborating with Hyundai E&C, the contractor for this ambitious project.

For this large-scale development, Dextra supplied marine tie bars to secure and anchor the quay of the offloading facility. The system leveraged Dextra’s large-diameter M134 tie rods, which were anchored into the combiwalls using Ball Cages, offering a ± 10° rotation capability in all directions, and Captive Nuts, allowing ± 5° rotation capability in all directions.

To accommodate the long tendons, provide the necessary adjustment length, and offer additional flexibility during installation, turnbuckles and Hinge Couplers were integrated into the system where required. These Hinge Couplers allowed for ± 90° vertical adjustment, ensuring that the system was adaptable and could be easily installed under varying conditions.

This solution contributed to the project’s success by providing a durable, flexible, and high-performance anchoring system for the quay, ensuring the stability of the offloading facility for years to come.

मनीला इंटरनेशनल कंटेनर टर्मिनल (एमआईसीटी) - बर्थ 7

मनीला इंटरनेशनल कंटेनर टर्मिनल (एमआईसीटी) - बर्थ 7

In 1988, ICTSI secured a 25+25-year concession to operate the Manila International Container Terminal (MICT), one of the Port of Manila’s three terminals. Since then, MICT has grown significantly, increasing its capacity five-fold and becoming the largest and most modern container terminal in the Philippines.

MICT is now globally recognized for its efficiency and modern operations. As part of its expansion, the Berth 7 project was undertaken to alleviate congestion at off-dock container yards by extending Berth 6. Dextra played a key role in this project.

For this expansion, Dextra supplied 110 sets of समुद्री टाई बार्स, each made from Grade 700 steel, with a bar diameter of 85mm. These tie bars were used as anchorages to tie back the main concrete wall, which was cast on top of tubular steel piles. The system was connected to a sheet pile anchor wall, which in turn was linked to the crane rail beam, providing essential stability to the structure.

Dextra’s marine tie bar solution offers three steel grades, with a yield stress of up to 700 MPa, and 22 thread diameters. This wide range ensures that the bars can be precisely matched to meet specific performance requirements, allowing for an efficient and economic use of materials.

By providing high-strength, durable, and reliable marine tie bars, Dextra helped ensure the structural integrity of the expanded berth, supporting MICT’s mission to remain one of the leading container terminals in the world.

अकाबा कंटेनर टर्मिनल

अकाबा कंटेनर टर्मिनल

The Aqaba Container Terminal (ACT) is located on the northern shores of the Gulf of Aqaba in southern Jordan. It is the only container terminal in the country and the second largest on the Red Sea in terms of capacity.

Dextra contributed to the creation of ACT’s new berth between 2011 and 2012 as part of a project aimed at increasing the terminal’s capacity to 1.2 million TEUs. The expansion began operations in 2013.

For this project, Dextra supplied its Marine Tie Bar solutions to BAM International. The rods were provided in Grade 500 in two sizes: M105 and M125.

The long tendons were connected to the combi-wall on one side with a Dextra Ball Cage, allowing for a multidirectional angle of ±10 degrees. This greatly facilitated the installation process while addressing possible soil settlement.

On the opposite wall, the tie rods were anchored using swivel plates and nuts, set up over waling beams. Dextra’s swivel accessories also allow a rotation angle of ±7 degrees in all directions.

मध्य पूर्व में हमारे समुद्री समाधानों के बारे में अधिक जानकारी के लिए कृपया हमसे परामर्श लें दुबई कार्यालय.