डेक्सट्रा ग्रुप | विश्वसनीय कनेक्शन

खोज
इस खोज बॉक्स को बंद करें.
खोज
इस खोज बॉक्स को बंद करें.

Cross Island Line (CRL) MRT, Singapore

 

Cross Island Line (CRL) MRT, Singapore

 
 

डेक्सट्रा has played a pivotal role in the construction of Singapore’s Cross Island Line (CRL) MRT project, supplying Glass Fiber Reinforced Polymer (GFRP) soft-eyes, बार्टेक couplers and सिर वाली बार्स for several crucial packages. डेक्सट्रा continues to support the ongoing packages of this extensive project.

The CRL is set to become Singapore’s eighth MRT line and its longest fully underground line, stretching over 50 kilometers. The project is being executed in three phases, with the first phase anticipated to be operational by 2030.

To minimize the environmental impact on the forested areas of the nature reserve, engineering solutions were meticulously chosen to further mitigate environmental disruption. These solutions include digging deeper into the ground and employing a large diameter boring machine, capable of accommodating two train tracks within a single tunnel. This approach not only reduces the surface footprint but also enhances the efficiency of the tunneling process.

Tunnel Boring Machines (TBMs) are a staple in Singapore’s subterranean infrastructure projects, adept at operating under a variety of ground conditions. The use of GFRP soft-eyes supplied by डेक्सट्रा is integral to these operations. Soft-eyes are essential components in TBM tunneling, acting as temporary openings that allow the TBM to break through concrete walls without compromising structural integrity. The GFRP material is preferred for its high strength-to-weight ratio, corrosion resistance, and ease of installation, ensuring safe and efficient tunneling operations.

डेक्सट्रा‘s expertise and reliable supply of GFRP soft-eyes, बार्टेक couplers and headed bars have significantly contributed to the progress of the CRL project, aligning with Singapore’s commitment to sustainable and innovative infrastructure development. As the CRL project advances, डेक्सट्रा remains a key partner, supporting the construction of this monumental MRT line that will eventually enhance the daily commute for millions of Singaporeans.

 

Foundation for Public Housing Development at Pik Wan Road, Hong Kong

 

The Foundation for Public Housing Development at Pik Wan Road, Hong Kong

 
 

The Foundation for Public Housing Development at Pik Wan Road stands as a testament to Hong Kong’s commitment to sustainable urban development and infrastructure enhancement. Situated amidst the vibrant cityscape, this construction project embodies a convergence of innovative engineering and community-focused initiatives.

At the heart of this endeavor lies the crucial aspect of slope stabilization—a fundamental requirement in Hong Kong’s hilly terrain, where land development often necessitates meticulous attention to structural integrity. Recognizing the significance of this aspect, the project turned to advanced solutions, seeking to marry effectiveness with environmental responsibility.

Enter डेक्सट्रा, a renowned provider of engineering solutions renowned for its commitment to quality and innovation. Dextra’s contribution comprised over a thousand pieces of Glass Fiber Reinforced Polymer (GFRP) Soil Nails — a cutting-edge solution designed to address the specific challenges of slope stabilization. GFRP Soil Nails offer superior corrosion resistance, durability, and ease of installation while minimizing environmental impact.

Dextra’s GFRP solutions have earned the esteemed approval of various authoritative bodies in Hong Kong, including the Buildings Department, a crucial entity overseeing building codes, safety standards, and inspections. Additionally, they have garnered recognition from the Hospital Authority, ensuring their reliability and suitability for healthcare infrastructure. Moreover, recognition from the Housing Department and the Construction Innovation & Technology Fund (CITF) signifies their innovative edge and contribution to advancing construction practices in Hong Kong.

 

Jal Jeevan Mission Water Reservoirs, India

 

Jal Jeevan Mission Water Reservoirs, India

 

The Jal Jeevan Mission of the Government of India is a flagship initiative where attempts are made to ensure adequate supplies of quality drinking water at affordable rates on a long-term basis. It emphasizes the importance of proper water management, infrastructure development, and community participation to achieve the ambitious goal of ‘Har Ghar Jal’ (Water to Every Household).

Considering the widespread geography of India, uneven terrain, and human settlements in remote locations, access to continuous water is a challenge. Therefore, overhead tanks are a good option for efficiently storing and distributing water, particularly in areas with inconsistent water supply patterns. Construction and infrastructure development are yet another key factors that have a direct influence on development.

Precast construction is one such method that has gained tremendous momentum in recent times due to its advantages, such as accelerated productivity, better quality control, environmental friendliness, and optimized material and labor usage. Although this method incurs high initial setup costs, its attractiveness is enhanced by large-scale projects with standardized designs. In the project, our team worked in close coordination with Larsen & Toubro (L&T) from the design stage, carefully selecting Groutec and Bartec couplers to connect the H and U frames of the overhead tanks.

Our range of Groutec couplers is arguably the most reliable mechanical splices, specially designed to connect two precast elements with no requirement for in-situ wet concrete joints. These couplers have been successfully qualified and tested over the years on several major infrastructure projects, including process plant pipe racks, residential and commercial buildings, and data centers, among others.

 

Tai Po Railway Pier – Reconstruction of Tai Po Kau Tide Gauge Station

 

Tai Po Railway Pier – Reconstruction of Tai Po Kau Tide Gauge Station, Hong Kong

 

In the dynamic coastal landscape of Tai Po Kau, New Territories, Hong Kong, infrastructure projects demand robust and resilient solutions. One such endeavor, the Reconstruction of Tai Po Kau Tide Gauge Station project, required innovative materials to withstand the unique challenges posed by its environment. Dextra stepped in to provide approximately 1,000 meters of Glass Fibre Reinforced Polymer (GFRP) rebar for the slab of the Tai Po Railway Pier, showcasing the efficacy of advanced composite materials in marine construction.

The Tai Po Kau Tide Gauge Station project aimed to revitalize the existing infrastructure, enhancing its resilience against tidal forces, corrosion, and environmental degradation. Recognizing the limitations of traditional steel reinforcement in marine environments, the project sought alternatives that could offer superior durability and longevity. Dextra’s GFRP rebar emerged as the ideal solution, offering exceptional resistance to corrosion, rust, and chemical degradation commonly associated with saltwater exposure.

GFRP rebar, composed of high-strength glass fibres embedded in a polymer matrix, delivers mechanical properties comparable to steel but with added benefits. Notably, GFRP rebar exhibits significantly lower thermal conductivity, reducing the risk of thermal bridging and enhancing structural integrity in extreme temperature variations. Furthermore, its non-magnetic properties eliminate electromagnetic interference, making it suitable for sensitive applications such as tide gauge stations.

The application of GFRP rebar within the Tai Po Kau Tide Gauge Station project encompassed both straight and bend bars, catering to the diverse structural requirements of the public pier. Dextra’s expertise in custom fabrication ensured precise bending and shaping of the rebar to fit the intricate geometries of the pier structure, facilitating seamless integration and minimizing construction complexities.

Nestlé LEO Factory, Thailand

 

Nestlé LEO Factory, Thailand

 

Nestlé LEO Factory’s reliance on precast elements necessitated a reliable, efficient method for joining the precast structure of the building. The construction utilized Groutec F, a well-known splicing system engineered by Dextra, to meet the exacting demands of the precast building. Groutec F allows for the connection of rebars without the need for bar end preparation and was used for the precast joint connection of beam and column in this project.

Groutec F is a fully grouted connection solution, ensuring robustness and durability in the face of dynamic operational environments. Engineered and manufactured in compliance with industry-leading standards such as Eurocode 2, BS 8110, ACI 318, IBC, and AASHTO, Groutec F guarantees adherence to rigorous structural specifications. It is compatible with major non-shrink grout brands readily available on the market, reducing logistical complexities and procurement lead times.

 

One Lake Club, Romania

 

One Lake Club, Romania

 

One Lake Club is a prestigious project promises to redefine luxury living in the Romanian capital. It aims to set new standards in urban living, offering residents an unparalleled blend of elegance, comfort, and functionality. The project encompasses a range of residential and recreational facilities, including luxury apartments, lush green spaces, and state-of-the-art amenities. With its ambitious vision and meticulous attention to detail, One Lake Club represents a beacon of modern architectural excellence in Bucharest.

As construction progresses on this ambitious venture, ensuring the structural integrity of the building is paramount. This is where Dextra’s Bartec couplers come into play. Renowned for their reliability and versatility, Bartec BF couplers provide robust connections between reinforcing bars, enhancing the strength and durability of concrete structures. In the case of the One Lake Club project, these couplers are specifically tailored for temporary opening applications, offering flexibility and efficiency in construction processes.

The 12mm Bartec BF couplers serve as the linchpin in the construction workflow, enabling seamless integration of reinforcing bars within the concrete framework. Their innovative design ensures quick and easy installation, minimizing construction time while maximizing safety and performance. By facilitating temporary openings in the concrete structure, these couplers enable efficient access for maintenance, inspection, and future modifications, thereby streamlining the construction process and ensuring long-term durability.

 

Uniqlo & Hive Indonesia Warehouse

 

Uniqlo & Hive Indonesia Warehouse

 

Indonesia’s building construction has spurred a need for rapid and efficient construction methods capable of meeting the demands of a burgeoning population. Precast construction has emerged as a solution to these challenges as it helps minimize on-site labor requirements, accelerates project timelines, and ensures consistent quality.

At the heart of successful precast construction lies the seamless connection between structural elements. Dextra supplied Groutec precast couplers for projects around the world, including Indonesia. Groutec in size 20mm were used in the Uniqlo & Hive Indonesia warehouse building project for joining precast columns, facilitating rapid and reliable assembly while ensuring structural integrity.

The couplers have minimized on-site labor requirements and accelerated project milestones. This not only translates to cost savings but also ensures timely delivery, allowing the building to fulfill its intended purpose sooner. Additionally, the couplers’ high-strength steel composition and stringent quality control measures guarantee robust connections that withstand the rigors of dynamic structural loads.

 

एनर्जीकनेक्ट - व्हिटेंस बुरोंगा सबस्टेशन

एनर्जीकनेक्ट - व्हिटेंस बुरोंगा सबस्टेशन

एनर्जीकनेक्ट परियोजना एक अभूतपूर्व पहल के रूप में उभरी है जो न्यू साउथ वेल्स (एनएसडब्ल्यू), विक्टोरिया और दक्षिण ऑस्ट्रेलिया के बीच बिजली के बंटवारे में क्रांतिकारी बदलाव लाएगी। इस परिवर्तनकारी परियोजना के केंद्र में डेक्सट्रा का अपरिहार्य योगदान है - 13 मिमी, 25 मिमी और 38 मिमी व्यास में लगभग 30,000 मीटर ग्लास फाइबर प्रबलित पॉलिमर (जीएफआरपी) सरिया की आपूर्ति। यह न केवल निर्माण के क्षेत्र में एक महत्वपूर्ण कदम है, बल्कि अधिक टिकाऊ और परस्पर जुड़े भविष्य की दृष्टि को भी बढ़ावा देता है।

एनर्जीकनेक्ट परियोजना

एनर्जीकनेक्ट परियोजना ऊर्जा बुनियादी ढांचे को बढ़ाने और राज्यों के बीच सहयोग को बढ़ावा देने के लिए ऑस्ट्रेलिया की प्रतिबद्धता का एक प्रमाण है। इस परियोजना का लक्ष्य एक मजबूत बिजली पारेषण नेटवर्क बनाना है जो तीन राज्यों में बिजली संसाधनों के कुशल बंटवारे को सक्षम करेगा। जैसे-जैसे ऑस्ट्रेलिया स्वच्छ और अधिक टिकाऊ ऊर्जा समाधानों की ओर बढ़ रहा है, एनर्जीकनेक्ट परियोजना एक लचीले और परस्पर जुड़े पावर ग्रिड को बढ़ावा देने में महत्वपूर्ण भूमिका निभाती है।

डेक्सट्रा का योगदान

डेक्सट्रा ने अत्याधुनिक और टिकाऊ निर्माण सामग्री प्रदान करने की अपनी प्रतिबद्धता को प्रदर्शित करते हुए पर्याप्त मात्रा में जीएफआरपी सरिया की आपूर्ति की। जीएफआरपी रीबार का उपयोग निर्माण उद्योग में एक गेम-चेंजर है, जो पारंपरिक स्टील सुदृढीकरण के लिए संक्षारण प्रतिरोधी विकल्प प्रदान करता है।

13 मिमी से 38 मिमी तक के व्यास वाले 30,000 मीटर जीएफआरपी रीबार को विद्युत ट्रांसमिशन लाइन और सबस्टेशन संरचनाओं को मजबूत करने के लिए रणनीतिक रूप से शामिल किया गया था। यह न केवल बुनियादी ढांचे की संरचनात्मक अखंडता को बढ़ाता है बल्कि निर्माण गतिविधियों के पर्यावरणीय प्रभाव को कम करने के व्यापक लक्ष्य के साथ भी संरेखित होता है।

जीएफआरपी रेबार के लाभ

जीएफआरपी रीबार, जिसे फाइबरग्लास रीइन्फोर्स्ड पॉलिमर (एफआरपी) रीबार के रूप में भी जाना जाता है, निर्माण तालिका में कई फायदे लाता है। पारंपरिक इस्पात सुदृढीकरण के विपरीत, जीएफआरपी सरिया संक्षारण प्रतिरोधी है, जो इसे चुनौतीपूर्ण पर्यावरणीय परिस्थितियों वाले क्षेत्रों में परियोजनाओं के लिए एक आदर्श विकल्प बनाता है। विविध जलवायु वाले कई राज्यों में फैली एनर्जीकनेक्ट परियोजना, इस संक्षारण प्रतिरोधी विशेषता से अत्यधिक लाभान्वित होती है, जिससे बुनियादी ढांचे की लंबी उम्र और स्थायित्व सुनिश्चित होता है।

इसके अलावा, जीएफआरपी सरिया स्टील की तुलना में काफी हल्का है, जो निर्माण प्रक्रिया के दौरान परिवहन और हैंडलिंग को सरल बनाता है। यह बढ़ी हुई दक्षता और कम श्रम लागत में योगदान देता है, जिससे यह एनर्जीकनेक्ट जैसी बड़े पैमाने की परियोजनाओं के लिए एक आकर्षक विकल्प बन जाता है।

लीम चबांग

लीम चबांग

थाईलैंड की खाड़ी पर स्थित लाम चबांग बंदरगाह, बैंकॉक बंदरगाह से पहले थाईलैंड का सबसे बड़ा और व्यस्ततम बंदरगाह है, और दक्षिण-पूर्व एशिया में चौथा सबसे व्यस्त बंदरगाह है। यह चोनबुरी प्रूविंग में स्थित है, जो बैंकॉक और डेक्सट्रा मुख्य उत्पादन सुविधा से कुछ घंटों की ड्राइव पर है।

डेक्सट्रा, लेम चबांग नए घाट के पीछे स्टील संरचनाओं की इंजीनियरिंग और आपूर्ति के लिए ठेकेदार इटालियन-थाई के साथ शामिल रहा है।

डेक्सट्रा ने ग्रेड 700 में अपने मरीन टाई रॉड्स सिस्टम की इंजीनियरिंग और आपूर्ति की, जो हमारी रेंज में सबसे अधिक है।

उच्च ग्रेड ग्रेड 355/510 और 500/660 की तुलना में बेहतर प्रदर्शन/स्टील अनुपात प्रदान करते हैं, जिससे छोटे व्यास बार चुनने की अनुमति मिलती है जो अंततः स्टील की बचत प्रदान करती है और रसद और स्थापना प्रयासों को सुविधाजनक बनाती है।

लंबी टेंडन बनाने वाली छड़ों को कंक्रीट के ढेर में बांधा गया और टर्नबकल और कप्लर्स के साथ जोड़ा गया।

इस लाम चबांग विस्तार परियोजना के लिए कुल 206 टन समुद्री टाई रॉड्स की आपूर्ति की गई है।

मुबारक अल-कबीर

मुबारक अल-कबीर

मुबारक अल-कबीर एक बड़ा बंदरगाह है, जो कुवैत के पूर्व में बुबियान द्वीप पर स्थित है, जो फारस की खाड़ी की ओर खुलता है।

डेक्सट्रा इस परियोजना के ठेकेदार हुंडई ईएंडसी के साथ मिलकर 2011 और 2012 के बीच निर्माण के पहले चरण के चरण 2 में शामिल रहा है।

इस बड़ी परियोजना के लिए, डेक्सट्रा ने ऑफलोडिंग सुविधा के घाट को सुरक्षित करने के लिए समुद्री टाई रॉड्स की आपूर्ति की।

प्रदान की गई प्रणाली डेक्सट्रा बड़े व्यास एम134 टाई रॉड्स का लाभ उठा रही थी, जो बॉल केज (सभी दिशाओं में ±10° रोटेशन क्षमता) और कैप्टिव नट्स (सभी दिशाओं में ±5° रोटेशन क्षमता) की बदौलत कॉम्बीवॉल में लगी हुई थी।

लंबे टेंडन को समायोजित करने, समायोजन लंबाई प्रदान करने और स्थापना के दौरान अतिरिक्त लचीलापन प्रदान करने के लिए, जहां आवश्यक हो वहां टर्नबकल और हिंज कप्लर्स (± 90° ऊर्ध्वाधर समायोजन) को भी लाइन में जोड़ा गया था।

कृपया अपनी जानकारी दर्ज करें

संपर्क करें

   अपनी जानकारी हमारे साथ साझा करें और हम यथाशीघ्र आपसे संपर्क करेंगे।