डेक्सट्रा ग्रुप | विश्वसनीय कनेक्शन

खोज
इस खोज बॉक्स को बंद करें.
खोज
इस खोज बॉक्स को बंद करें.

पुमारेजो ब्रिज

पुमारेजो ब्रिज

Pumarejo Bridge is a 3,200m-long bridge including an 800m-long cable-stayed section and 1,300m of viaducts as well as access roads.

The new cable-stayed bridge is located over the Rio Magdalena river in Barranquilla and the Salamanca Island Road Park in Sitionuevo, Colombia.

It replaces the old Puente Pumarejo: with its two lanes, the old bridge was no longer doing justice to the increased traffic, and it quickly became an obstacle for shipping on the Rio Magdalena due to a clearance below of only 16 meters.

Pumarejo Bridge

View of the new bridge in construction, with the old Pumarejo bridge in the foreground

The new bridge comprises of 6 lanes of traffic (3 lanes each way), 2 side bike paths and a pedestrian path along its side.

Dextra provided rebar connection solutions that were designed to reinforce the concrete structures.

More than 120,000 Rolltec couplers were provided for pier and deck reinforcements.

In addition, over a thousand of Unitec bolted couplers were applied for the connection rebars without the need of threading.

Since its completion, it became the longest road bridge in the country and one of the largest in Latin America.

Source of images: https://www.khl.com/international-construction/colombias-longest-road-bridge/139582.article, https://commons.wikimedia.org/wiki/File:Puente_ pumarejo.jpg

ठाणे-कलवा क्रीक ब्रिज

ठाणे-कलवा क्रीक ब्रिज

ठाणे-कलवा क्रीक ब्रिज भारत के कलवा नाका में ठाणे क्रीक पर लगभग 2.4 किलोमीटर लंबा यू-आकार का सड़क पुल है, जिसका उद्देश्य कलवा और ठाणे शहर क्षेत्रों में भीड़भाड़ के साथ-साथ ठाणे और नवी मुंबई के बीच यातायात की भीड़ को कम करना है।

डेक्सट्रा ने विभिन्न लंबाई में टेंशन रॉड सिस्टम के 20 से अधिक सेट वितरित किए (आपूर्ति की गई अधिकतम लंबाई ~ 24 मीटर है), आकार एम 108, ग्रेड 700, टोकरी हैंडल ब्रिज / स्टील आर्च ब्रिज के लिए सस्पेंडर्स के रूप में उपयोग किया जाता है।

तनाव छड़ें आमतौर पर ब्रेसिंग या सस्पेंशन तत्वों के रूप में कार्य करती हैं और उच्च शक्ति, लंबाई समायोजन, स्थापना में आसानी के साथ-साथ स्थापना के बाद तनावग्रस्त होने की क्षमता का लाभ प्रदान करती हैं। विभिन्न स्टील ग्रेड और कार्बन और स्टेनलेस स्टील दोनों में आकार और सहायक उपकरण की एक विस्तृत श्रृंखला उपलब्ध है।

पुल को मूल रूप से 2020 में खोला जाना था, लेकिन महामारी और उसके बाद के लॉकडाउन के कारण निर्माण में काफी देरी हुई।

ब्रेला-तुलसिया ब्रिज

ब्रेला-तुलसिया ब्रिज

The Braila-Tulcea Bridge is an under-construction road suspension bridge over the Danube river, between Braila, a major city in the east of Romania, and the opposite bank of the river in Tulcea County.

It will be the first bridge over the maritime sector of the Danube river, which will improve road traffic accessibility of the Galați-Braila area to Constanța and Tulcea, and connect Moldavia and Dobruja regions.

The suspension bridge will have a main span of 1,974m, two side spans of respectively 490m on the Braila bank of the river and 365m on the Tulcea bank of the river, along with two access viaducts of 110m length on both sides, and a connecting road with a total length of approximately 23km.

Dextra supplied 280,000 Bartec rebar couplers for the reinforcement of the suspension bridge structure.

Bartec coupler is compliant with seismic design under ISO 15835 category S2. It can withstand tension and compression of large deformation in case of violent earthquakes.

The construction of the bridge is anticipated to be completed in 2023.

196 किलोमीटर बैंग पा-इन - नाखोन रत्चासिमा इंटरसिटी मोटरवे

196 किलोमीटर बैंग पा-इन - नाखोन रत्चासिमा इंटरसिटी मोटरवे

Being the new fast-tracks linking the Center to the East of Thailand, the construction of Bang Pa-In – Nakhon Ratchasima Motorway is therefore considered one of the country’s major infrastructure projects.

The main purpose of this project is to stimulate the country’s economy. When completed, it will connect Thailand’s major urban centers within the Greater Mekong Sub-region.
The Intercity Motorway includes two sections: the six-lane 103-kilometer section from Bang Pa-In to Pak Chong, and the 93-kilometer four-lane from Pak Chong to Nakhon Ratchasima. Having been started in 2016, the project is planned to last until 2020.

The project’s required completion period of 4 years being challenging, the construction of the motorway has been divided into approximately 40 contracts to accelerate the project’s schedule.
To minimize potential impacts to local residents, a number of underpasses, overpasses and elevated structures (e.g. large viaducts) are provided throughout the Bang Pa-In – Nakhon Ratchasima Motorway.

Optimize the infrastructure project with Dextra’s rebar couplers

For the construction of the motorway’s elevated structure, the contractors of different packages opted for Dextra’s full performance Bartec rebar couplers to save time and money on the mechanical connection of the diameter 20mm to 32mm reinforcement bars.
Thanks to Bartec’s unique splicing system, all applications (Standard/ Position) can be fulfilled by one and only model of rebar coupler, reducing inventory management of the project to a minimum.
Further to this, Dextra’s Sonitec sonic tubes were also installed for cross-hole sonic logging tests in the foundations of the Bang Pa-In – Nakhon Ratchasima Intercity Motorway structures.

Dextra’s post-tensioning bars for the Motorway’s elevated structures

In addition to Dextra’s splicing and cross hole logging solutions, both smooth and fully-threaded Post-Tensioning bars were also used for both temporary (lifting and launching girder assembly) and permanent applications in segments. Approximately 28,000 sets of both PT bars have been delivered as per June 2018.
For more information about Dextra’s solutions in Thailand, please contact our Bangkok office.

बिन्ह खान ब्रिज: वियतनाम में नवीनतम केबल-रुका हुआ पुल

बिन्ह खान ब्रिज: वियतनाम में नवीनतम केबल-रुका हुआ पुल

The construction of Binh Khanh Bridge is a part of Vietnam’s Ben Luc – Long Thanh Expressway project, which will run through Ho Chi Minh City and southern Long An province and involves the construction of 58-kilometer long roads.
Being started in 2016 and scheduled to be in service within 2020, the main purpose of this project is to develop the country’s transport facilities for fast vehicles.
To ease the construction of this 58-km long expressway, the project owner Vietnam Expressway Corporation has divided the project into three phases: the western, the middle, and the eastern sections.

Smooth and Fully-threaded PT bars: post-tensioning solutions for bridges and viaducts

For the construction of the 3-kilometer long Binh Khanh Bridge, which is part of the middle section, Dextra has supplied smooth and fully-threaded post-tensioning bars have been delivered. These have been used in the main structure, the stay cable, as well as the bridge’s western and eastern approaches.

For more information about our solutions in Vietnam, please contact our बैंकॉक कार्यालय.

नया एक्सट्राडोज्ड गंगा पुल

नया एक्सट्राडोज्ड गंगा पुल

The six-lane extradosed bridge over the Ganga River in Prayagaraj will span for 9.9 kilometers, with the main bridge covering 3.84 kilometers and the approach segment covering the remaining distance.

The 3.84-kilometer stretch would include 67 pillars and 17 pillar foundations. Also, of this 3.84 km, the span of 860 meters will be extradosed bridge, and the rest will be a precast segmental bridge with a span of 50 meters.

Dextra supplied 20,000 Sonitec tubes, an easy-to-assemble and time-saving tube solution used for the CSL (crosshole sonic logging) testing of foundation piles to determine the structural integrity. The tubes were installed in piles that were 30 to 36 meters deep and had a diameter of 1.2 meters.

The bridge will start from the Pratapgrah road, gain height to over cross the existing Y-junction (going towards Lucknow) and would then cross the Ganga from Kacchar area spanning over Beli village before ending at Stanley Road. It is expected to be in operational in 2024.

न्यू स्टॉरस्ट्रॉम ब्रिज

न्यू स्टॉरस्ट्रॉम ब्रिज

न्यू स्टॉरस्ट्रॉम ब्रिज परिवहन बुनियादी ढांचे में सुधार और देश के द्वीपों को अधिक कुशलता से जोड़ने की डेनमार्क की प्रतिबद्धता का एक प्रमाण है। स्टोर्स्ट्रोमेन जलडमरूमध्य पर फैला यह पुल पुराने स्टोर्स्ट्रॉम ब्रिज की जगह लेगा, जो 1937 से ज़ीलैंड और फाल्स्टर द्वीपों के बीच एक महत्वपूर्ण संपर्क के रूप में काम कर रहा है।

न्यू स्टॉरस्ट्रॉम ब्रिज को न केवल वाहनों के आवागमन बल्कि पैदल यात्रियों और साइकिल चालकों को भी समायोजित करने के लिए डिज़ाइन किया गया है। इसकी नवीन वास्तुकला और इंजीनियरिंग यात्रा के समय को कम करने, सुरक्षा में सुधार करने और इन दो प्रमुख डेनिश द्वीपों के बीच एक विश्वसनीय लिंक प्रदान करने के लिए तैयार हैं।

इंजीनियरिंग निर्माण समाधानों में अपनी विशेषज्ञता के साथ, डेक्सट्रा ने ढेर सुदृढीकरण पिंजरों को जोड़ने के लिए 120,000 रोलटेक कप्लर्स और हेड बार की आपूर्ति की है। ये घटक पुल की नींव के निर्माण के लिए आवश्यक हैं, जिससे यह सुनिश्चित होता है कि पुल अपने जीवनकाल के दौरान भारी वजन और ताकतों का सामना करने के लिए सुरक्षित रूप से एक दूसरे से जुड़ा हुआ है।

पुल की नींव में हमारे योगदान के अलावा, हमने मरम्मत अनुप्रयोगों के लिए यूनिटेक कप्लर्स की भी आपूर्ति की है, जो बिना किसी धागे के स्थापित सरिया को जोड़ते हैं। डेक्सट्रा के योगदान से, यह पुल आने वाली पीढ़ियों के लिए ज़ीलैंड और फाल्स्टर के बीच जीवन रेखा के रूप में काम करेगा, लोगों, समुदायों और अवसरों को जोड़ेगा।

नाने ब्रिज

नाने ब्रिज

The Nanay Bridge is a 2.2km bridge crossing the Nanay River, north of the city of Iquitos, Peru.

The bridge will connect the district of Bellavista on the right bank of the Nanay River with the district of Santo Tomas on the left bank.

With a population of almost half a million people, Iquitos is the largest city in the world that cannot be reached by road – tucked in the Peruvian Amazonia jungle, it is currently accessible only by river and air.

Thanks to this project, the city will finally be connected with the rest of the Loreto Region.

The main structure is a cable-stayed bridge with a main span of 242m and total length of 424m. The approach structures are 1.2km long on the right bank of the river, and 320m long on the left bank of the river.

The bridge carries two lanes of traffic and two pedestrian walkways. The roadway has a total width of 12m, and each pedestrian walkway is 1.2m wide.

It uses light-weight composite steel concrete to minimize the use of concrete and to reduce loads transferred to the foundations.

For this project Dextra has supplied 100,000 Bartec couplers for rebar connection and 30,000 headed bars for shear reinforcement of the anchors.

Once completed, it will be the longest bridge in the Country.

सुवर्णभूमि बैंकॉक अंतर्राष्ट्रीय हवाई अड्डा - चरण 2

सुवर्णभूमि बैंकॉक अंतर्राष्ट्रीय हवाई अड्डा - चरण 2

सुवर्णभूमि हवाई अड्डा थाईलैंड का मुख्य अंतरराष्ट्रीय हवाई अड्डा है, जो घरेलू और अंतरराष्ट्रीय दोनों उड़ानों का संचालन करता है और इस क्षेत्र के यात्रियों के लिए दक्षिण पूर्व एशिया के मुख्य प्रवेश द्वार में से एक है। हवाई अड्डा बैंकॉक के पूर्व में डेक्सट्रा मुख्य विनिर्माण सुविधा से 15 मिलियन से भी कम दूरी पर स्थित है।

डेक्सट्रा 2001 की शुरुआत से ही हवाई अड्डे के निर्माण में शामिल है, और अभी भी हवाई अड्डे की नवीनतम विस्तार परियोजनाओं में योगदान दिया है।

सुवर्णभूमि हवाई अड्डे के दूसरे चरण के विस्तार का उद्देश्य हवाई अड्डे की वार्षिक यात्री प्रबंधन क्षमता को 60 मिलियन यात्रियों तक बढ़ाना और अंतरराष्ट्रीय उड़ानों के लिए अतिरिक्त 28 गेट असाइनमेंट प्रदान करना, सेवा को अंतरराष्ट्रीय मानकों तक लाना और कुल क्षेत्र में यात्रियों और एयरलाइंस की सुविधा में सुधार करना है। 960,000 वर्ग मीटर.

600,000 से अधिक बारटेक रीबार कप्लर्स का उपयोग हवाई अड्डों के सभी हिस्सों में बड़े पैमाने पर किया गया है, जिसमें बीम, कॉलम, डायाफ्राम दीवारें और ढेर पिंजरे शामिल हैं। यह लोकप्रिय रीबार स्प्लिसिंग समाधान ऊर्ध्वाधर या क्षैतिज दोनों अनुप्रयोगों के लिए रीबारों के सुरक्षित और विश्वसनीय कनेक्शन की अनुमति देता है।

यह सुनिश्चित करने के लिए कि उत्पादन आवश्यकताओं को समय पर पूरा किया जाए, समाधान हमारे प्रशिक्षित विशेषज्ञों के साथ, सरिया तैयारी उपकरण के साथ वितरित किए गए थे।

इसके अलावा, रिपेयरग्रिप और यूनिटेक कप्लर्स का उपयोग 2 रिबारों के कनेक्शन के लिए भी किया गया था, जिनमें कोई थ्रेड या रिबार नहीं था, जिसमें स्प्लिसिंग की समस्या थी।

फेकैम्प ऑफशोर विंड फार्म

फेकैम्प ऑफशोर विंड फार्म

फ़्रांस के फ़ेकैंप के तट से 13 से 22 किलोमीटर की दूरी पर स्थित 497 मेगावाट पवन फार्म में 71 गुरुत्वाकर्षण आधारित संरचनाएं (जीबीएस: गुरुत्वाकर्षण आधारित संरचनाएं) शामिल हैं, जिनमें से प्रत्येक 180 मीटर ऊंची पवनचक्की का समर्थन करेगी। यह परियोजना 416,000 से अधिक घरों की बिजली जरूरतों के बराबर बिजली उत्पन्न करेगी।

इन लाभों के लिए डेक्सट्रा फोर्टेक कप्लर्स और हेडेड बार की आपूर्ति की गई थी।

फोर्टेक कप्लर्स

  • निर्माण के विभिन्न चरणों के दौरान सामग्री और कर्मियों की आवाजाही को सुविधाजनक बनाने के लिए अस्थायी उद्घाटन के लिए उपयोग किया जाता है।
  • निरंतरता सलाखों से जुड़ने के लिए कंक्रीट दीवार स्टार्टर सलाखों के रूप में कार्य किया।
  • तीव्र चक्र जीबीएस बिल्डिंग के लिए क्लाइंबिंग फॉर्मवर्क के साथ सहायता प्राप्त निर्माण क्षमता।
  • ओवरलैपिंग स्प्लिसेस से बचते हुए, सरिया की भीड़ में सुधार हुआ।
  • डेक्सट्रा कप्लर्स पैरेलल थ्रेड तकनीक पर आधारित हैं। समान कप्लर्स का उपयोग मानक कनेक्शन (जब निरंतरता बार को घुमाया जा सकता है) और स्थिति कनेक्शन (जब किसी भी बार को घुमाया नहीं जा सकता) के लिए किया जाता है। फ़ेकैंप के लिए, साइट थ्रेडिंग उपकरण के सेट से सुसज्जित थी।

    सिर वाली सलाखें

  • सरिया की भीड़ और स्टील/कंक्रीट अनुपात को कम करके निर्माण क्षमता और साइट पर उत्पादकता में सुधार।
  • हुक वाले एंकरेज के साथ रीबार के विकल्प के रूप में कतरनी दीवार क्रॉस संबंधों के रूप में उपयोग किया जा सकता है।
  • अनुक्रमित कंक्रीट डालने के लिए उपयुक्त।
  • भूकंपीय डिजाइन के लिए उपयुक्त.
  • स्थापित करने में तेज़: कम श्रम और क्रेन समय।
  • रीबोर की स्थितिगत समायोजन में आसानी के लिए हेड को हटाया जा सकता है।
  • कंक्रीट संघनन और सतह की गुणवत्ता में सुधार (हनीकॉम्बिंग में कमी)।
  • डेक्सट्रा हेडेड बार का उपयोग नींव के ऊर्ध्वाधर सुदृढीकरण के लिए एक कुशल समाधान के रूप में किया गया था। वे मानक हुक वाली पट्टियों के लिए एक उत्कृष्ट विकल्प हैं, जिन्हें स्थापित करना मुश्किल होता है, खासकर जब दोनों सिरों पर मुड़े होते हैं, और एक लंगर के रूप में कार्य करने वाली सीधी या मुड़ी हुई सरिया की बंधी हुई लंबाई होती है।

    प्रोजेक्ट केस स्टडी डाउनलोड करें

    कृपया अपनी जानकारी दर्ज करें

    संपर्क करें

       अपनी जानकारी हमारे साथ साझा करें और हम यथाशीघ्र आपसे संपर्क करेंगे।