



Groutec F IAPMO certified!



Groutec F is a new fully-grouted प्रीकास्ट connection solution that is developed to complement the existing half-grouted systems: Groutec L and Groutec S. Unlike the previous two models, it is designed for the connection of प्रीकास्ट elements without the need for any rebar preparation.
More about our latest projects



HCMC Metro Line 1: Ba Son Shipyard Station, Vietnam
बार्टेक headed bars were used in shear link मजबूतीकरण as an alternative to bends to minimize steel congestion in heavily reinforced areas.
Mahatma Gandhi Setu Rehabilitation, India
Dextra high-tensile fully threaded bars were provided, along with RepairGrip couplers for the connection of old and new पियर्स caps.
Nanyang Technological University Lab, Singapore
जीएफआरपी (ग्लास फाइबर रिइन्फोर्स्ड पॉलिमर) (Glass Fiber Reinforced Polymer) rebars were installed in base slabs and floating slabs as a replacement for steel rebars.
Dextra is proud to be the first manufacturer of products
for civil works construction whose quality management system is
ISO 19443 certified!
This new standard covers « Specific requirements for the application of the ISO 9001 standard by organizations in the supply chain of the nuclear energy sector supplying products and services important to nuclear safety. »
Having supplied concrete reinforcing bar couplers for the construction in over 50 nuclear reactors during the past 20 years, quality and nuclear safety remain Dextra’s priority.
Dextra attended ASEAN Ports & Shipping Exhibition in Malaysia
