डेक्सट्रा ग्रुप | विश्वसनीय कनेक्शन

खोज
इस खोज बॉक्स को बंद करें.
खोज
इस खोज बॉक्स को बंद करें.

Dextra’s Quarterly Newsletter: Connection #20


The revitalization of a UK landmark

Battersea Power Station, fully decommissioned almost 40 years ago, is being redeveloped in one of UK’s biggest ever construction projects.

The seven-phased redevelopment venture is estimated to be worth £8bn ($13bn).

The 3rd phase consists in the creation of the so-called ‘Electric Boulevard’, which will include a connection to the Northern Line Extension station, more than 1,300 residential units, a 160-room hotel, retail spaces, restaurants and leisure facilities.

The wide range of concrete reinforcement solutions provided by Dextra was proven to be ideal for this iconic project.

Different ranges of couplers have been supplied for cast-in-situ, precast and repair applications, specifically:

  • 100,000 Griptec and Rolltec cast-in-situ couplers
  • 30,000 Groutec precast couplers
  • 3,000 Unitec bolted couplers

ICCX Central Europe 2020: save the date!

Visit Dextra at the ICCX Central Europe 2020 on February 12-13.

At Double Tree Hotel by Hilton Hotel & Conference, Warsaw, Poland.

Discover our well-known rebar connection solutions and latest precast element connection technology at booth #55, from 9AM to 6PM!

New Sonitec V2

Sonitec is a tube solution designed to facilitate the integrity testing of foundations using the Cross Sonic Logging (CSL) testing method.

The release of this new version represents an important milestone for Dextra, bringing some unique features to the market:

  • Cold expansion technique with a limited residual stress around the hole
  • Sturdy shape without thermal deformations
  • Rubber seals are standardized and can easily be outsourced and replaced

More about our latest projects

w660_11261293_smithriverbridge2
w660_11261297_rasabuaboudstadiumqatar1
w660_11261295_1limageaberdeenharbourexpansionproject

USA – Smith River Bridge  

Bartec rebar couplers and headed bars supported the reinforcement of the bridge structure.

Qatar – Ras Abu Aboud Stadium

Tension rods were installed in this innovative modular stadium built specifically for the FIFA World Cup 2022 tournament.

UK – Aberdeen Harbor Expansion

The expansion of one of the oldest ports in the UK was facilitated by the usage of Sonitec for the CSL test.

Interview with SKM Steel Holdings

 

 

” Supportive, systematic, speedy: this is how we would describe Dextra.”

Meet SKM Steel Holdings, a Joint Venture between Steel King Company Ltd. from Myanmar and Mitsui & Co. from Japan, specialized in cut and bend steel fabrication.

 

Discover why they have chosen Dextra as a partner since the first day of operation.

Our People

“I am 4,391 miles away from home and here in Dubai, my second home is Dextra Middle East. At work, we are allowed to express ourselves as if it was a family business instead of a multinational company.”

 

– Ms. Mary Grace, Sales Coordinator,

8 years at Dextra Middle East

On behalf of all Dextra employees, we would like to wish you and your loved ones a very happy and prosperous new year.

We are looking forward to providing you with our best service throughout the new year.

Let’s build together in 2020!

कृपया अपनी जानकारी दर्ज करें

संपर्क करें

   अपनी जानकारी हमारे साथ साझा करें और हम यथाशीघ्र आपसे संपर्क करेंगे।