Pont Tân Vũ – Lạch Huyện
The Tan Vu–Lach Huyen Bridge is a 5.4-km-long bridge located east of Hai Phong, in the north of Vietnam. The bridge is connecting the Hai Han district (east of Hai Phong) to the new port of Lach Huyen, located on the island district of Cat Hai. This will also allow the port of Lach Huyen to be directly connected to the Hai Phong/Hanoi highway, drastically reducing the transit time to Vietnam’s capital city.
The bridge project is part of a broader infrastructure plan: the Tan Vu–Lach Huyen highway infrastructure project, which aims to develop Hai Phong as a main transportation hub in the North of Vietnam.
For this bridge project, Dextra supplied two types of post-tensioning systems:
Pour le renforcement permanent des segments de poutres préfabriquées, Dextra a fourni Systèmes de barres lisses PT avec extrémités filetées dans les tailles M39 et M49, nuances 835/1030 et 930/1080. Les systèmes de barres Dextra sont utilisés pour la post-tension verticale des segments en béton.
For the lifting and temporary fixing of the precast girder segments during the construction phase, Dextra supplied its fully threaded bar systems in diameters 32 and 36, grade 1080/1230.
For all temporary applications such as lifting and fixing operations, fully threaded PT bar systems are a convenient and economical solution, as they can easily be cut, adjusted, and reused several times. Thanks to their continuous thread, the bars can be spliced at any point by the use of couplers or turnbuckles, which are also available from Dextra.
For more information and engineering support regarding post-tensioning systems in Vietnam, please contact our office in Bangkok.