Groupe Dextra | Connexions fiables

Recherche
Fermez ce champ de recherche.
Recherche
Fermez ce champ de recherche.

Rail Baltica Bridge Over Neris River, Lithuania

 

Rail Baltica Bridge over the Neris River, Lithuania

 

The construction of the Rail Baltica Bridge over the Neris River near Jonava marks a significant milestone in the region’s railway infrastructure. Stretching 1.5 kilometers, this bridge will not only be the longest in Lithuania but also the entire Baltic States. Designed with a variety of spans—including cast-in-place from traveler, cast-in-place supported on falsework, and span-by-span cantilever—the project showcases advanced engineering techniques and a commitment to environmental protection.

Dextra plays a vital role in ensuring the structural integrity of the bridge by supplying Sonitec crosshole sonic logging (CSL) testing tubes for the testing of piles. CSL testing is a crucial procedure that provides real-time insights into the quality and integrity of concrete in the piles, ensuring they meet stringent safety standards. This advanced technology enables engineers to detect anomalies and assess the quality of the concrete, ensuring the long-term durability of the bridge.

L'utilisation de Sonitec is particularly important given the bridge’s engineering complexity and the environmental considerations surrounding its construction. By integrating this technology, Dextra helps to uphold the highest standards of construction and environmental stewardship.

The Rail Baltica project represents the largest railway infrastructure development in the history of the Baltic States. Once completed, it will provide an electrified double-track European gauge railway line connecting major cities such as Warsaw, Kaunas, Riga, and Tallinn. This ambitious project will span a total of 870 kilometers, with 392 kilometers in Lithuania alone.

With the Rail Baltica Bridge over the Neris River, Dextra is proud to contribute to a landmark project that promises to enhance regional connectivity, promote sustainable transport solutions, and respect the delicate balance between development and environmental conservation. As construction progresses, the bridge will stand as a testament to innovative engineering and collaboration, paving the way for a brighter, more connected future in the Baltics.

Industrial Bridge, Chile

 

Industrial Bridge, Chile

 

Dextra’s engineering expertise and innovative products played a pivotal role in the construction of the Industrial Bridge in Chile. As part of the project, Dextra supplied its Rolltec mechanical splice system, ensuring robust and reliable rebar connections. Additionally, headed bars were provided to enhance anchorage performance, a critical requirement for the bridge’s structural integrity.

The project also utilized Sonitec crosshole sonic logging (CSL) testing tubes, facilitating thorough integrity testing of concrete piles, ensuring long-term safety and performance. These advanced solutions reflect Dextra’s commitment to supporting complex infrastructure projects with high-quality, tailored products.

The Industrial Bridge stands as a testament to modern engineering and showcases the critical role Dextra’s solutions play in shaping resilient and efficient infrastructure worldwide.

Grand Paris Express – Line 16-18, France

 

Grand Paris Express – Line 16-18, France

 

Dextra has proudly supplied its high-performance Fortec coupleurs de barres d'armature et Sonitec crosshole sonic logging (CSL) tubes for the construction of the Grand Paris Express Line 16-18 in France, one of Europe’s most ambitious infrastructure projects. This metro expansion aims to improve connectivity between the suburbs and the city center, providing a more efficient transportation network for millions of commuters.

Dextra’s Fortec couplers were utilized for reliable and durable rebar connections, ensuring the structural integrity of the extensive underground tunnels and stations. In addition, the Sonitec CSL tubes were supplied for concrete pile integrity testing, essential for assessing the quality of deep foundations. These innovative solutions have contributed to the project’s success in meeting high safety and performance standards, underscoring Dextra’s commitment to delivering top-quality materials for large-scale infrastructure developments.

With the Grand Paris Express set to transform the city’s transportation landscape, Dextra’s involvement highlights its role in shaping resilient and sustainable urban infrastructure.

My Enso Loft, Philippines

 

My Enso Lofts, Philippines

 

Dextra has played a key role in the construction of the My Enso Lofts condominium project in Quezon, Philippines, by supplying cutting-edge reinforcement solutions. For this high-rise development, Dextra provided Bartec rebar splicing systems for the raft foundation, columns, and core walls, ensuring robust structural integrity and efficient load transfer across these critical elements.

Additionally, Dextra supplied Groutec S couplers for the precast shear wall and column connections. These couplers are designed for rapid assembly, which accelerated the construction timeline and enhanced the project’s overall structural stability.

By delivering these innovative solutions, Dextra continues to support the construction of resilient and durable buildings in the Philippines, reinforcing their commitment to excellence in infrastructure projects worldwide.

 

Chennai Metro Phase 2, India

 

Chennai Metro Phase 2, India

 
 

The Chennai Metro Phase 2 project is set to redefine urban transportation in one of India’s largest cities, promising enhanced connectivity and efficiency. Playing a pivotal role in the success of this ambitious project, Dextra has supplied an array of cutting-edge construction solutions to meet the project’s demanding structural and safety requirements.

Ensuring Robust Connections with Bartec Rebar Couplers

Dextra supplied nearly 2 million Bartec rebar couplers, essential for creating secure connections across various structural components. These couplers have been utilized extensively in the connections for diaphragm wall (d-wall) caging and slabs, pile cages, piers, and pier caps. By ensuring high-strength rebar connections, Bartec couplers contribute to the overall durability and resilience of the metro structure, particularly important in a densely populated and busy urban environment like Chennai.

Precision Testing with Sonitec CSL Testing Tubes

To ensure the highest standards of concrete integrity, Dextra provided over 80,000 Sonitec crosshole sonic logging (CSL) testing tubes. These tubes facilitate rigorous testing of piles and d-walls, helping to identify potential flaws within the concrete structure. This meticulous testing process enables project engineers to detect and address any irregularities, safeguarding the integrity and longevity of the metro’s foundations.

Supporting Complex Structures with CR Bar 1080 Post-Tensioning Bars

For the support of double-decker piers and the pre-tensioning of U-girders, Dextra supplied 68 CR Bar 1080 post-tensioning bars. These high-strength, fully threaded bars are critical in handling the complex loads and stresses that the elevated sections of the metro will endure. The inclusion of these bars ensures that the metro can withstand heavy traffic and operational demands over time, contributing to the long-term safety and functionality of the infrastructure.

Facilitating Tunnel Boring with GFRP Soft-Eyes

In the tunneling phase, Dextra also provided 42 GFRP soft-eyes, specifically designed for tunnel boring machine (TBM) operations. These soft-eyes allow TBMs to pass through concrete walls smoothly, ensuring safe and efficient tunneling while reducing the risk of structural damage. GFRP’s non-corrosive properties make it an ideal choice for underground construction, where durability and performance are paramount.

Building a Safer, Stronger Future

Dextra’s commitment to supplying top-tier construction materials and solutions underscores its dedication to the Chennai Metro Phase 2 project. As the metro takes shape, Dextra’s innovations contribute not only to the project’s success but also to the future of Chennai’s urban infrastructure, setting new standards in construction excellence and sustainability.

Mumbai Metro Line 2B, India

 

Mumbai Metro Line 2B, India

 
 

Le Mumbai Metro Line 2B, an essential link connecting several key areas of the city, is a significant infrastructure project aimed at alleviating Mumbai’s traffic congestion and providing efficient public transport. As part of this ambitious project, Dextra has made a valuable contribution, supplying engineered construction materials to ensure the durability and reliability of the structure.

CR Bar 1080 for U-Girder Stressing and Pre-Tensioning

One of the critical components of the project is the elevated section of the metro, which relies on U-girders for support. To enhance the strength and resilience of these U-girders, Dextra supplied its innovative CR Bar 1080 cold-rolled fully threaded post-tensioning bars. These bars, with a diameter of 75mm, are specifically designed to withstand high stress during both U-girder stressing and pre-tensioning operations. The hexagonal nuts provided as part of the system allow for secure fastening and easy adjustment, ensuring precise tensioning to meet the structural demands.

 

Fully Threaded (FT) Bar for Segment Stitching and Temporary Stressing

For segment stitching and temporary stressing operations during the construction of the metro viaduct, Dextra supplied its fully threaded (FT) bars. These bars provide secure connections between precast segments and offer flexibility for adjustments during the stitching process, ensuring that the structural alignment is perfect before the segments are permanently joined.

Unitec Couplers for Rebar Connections

In addition, Dextra supplied Unitec couplers, designed for connecting rebars at construction sites without the need for pre-threading. These couplers offer a convenient and robust solution, allowing for seamless connection of two rebars, ensuring structural continuity and strength without delays in the construction process.

Sonitec CSL Testing Tubes for Concrete Pile Integrity

In addition to supplying post-tensioning bars, Dextra also provided Sonitec Crosshole Sonic Logging (CSL) testing tubes for the integrity testing of the concrete piles supporting the metro structures. These tubes enable highly accurate non-destructive testing of the concrete, allowing engineers to detect any potential flaws or weaknesses in the piles. This testing is vital for ensuring the piles meet the necessary strength and quality standards, thereby supporting the entire metro system safely and effectively.

Enhancing Metro Connectivity with Quality Solutions

As the Mumbai Metro Line 2B progresses towards completion, Dextra’s contributions to the project highlight its role in providing advanced engineering solutions for infrastructure development. The combination of Barre CR 1080 for post-tensioning, fully threaded bars for segment stitching, Unitec couplers for rebar connection, and Sonitec CSL testing tubes for pile integrity showcases Dextra’s commitment to quality, innovation, and safety in major construction projects.

By contributing to this key metro line, Dextra is playing a part in shaping the future of urban mobility in Mumbai, ensuring that the metro system will be reliable and capable of supporting the city’s growing transportation needs for years to come.

Sonitec EPD Report Published

Sonitec, a crosshole sonic logging (CSL) tube for concrete structure integrity testing solution from Dextra, now has an EPD (Environmental Product Declarations) report and officially listed on the EPD Hub website!

Our previously approved solutions include:

✅ Coupleurs de barres d'armature

✅ GFRP Rebars

✅ Barres de liaison marines

✅ Steel Ground Anchors

✅ Steel Self-Drilling Rock-Bolts

✅ Steel Combination Bolts

Stay tuned as we work on EPDs for even more of our solutions!

EPD Report for Sonitec

EPD Report for Sonitec

Impossible d'afficher le fichier PDF. Télécharger plutôt.

Sables de Marina Bay

Sables de Marina Bay

Marina Bay Sands is a spectacular resort featuring more than 2,500 rooms, a casino, many restaurants, topped by a unique sky garden. The project was completed and opened to the public in 2010.

For this project, Dextra supplied between 2007 and 2008 solutions for the reinforcement splicing, as well as Sonitec tubes.

Bartec rebar coupler were used in the foundations for Diaphragm Walls, answering a double challenge.

First rebar couplers may be used vertically to connect D-Wall cages together, allowing to achieve longer cage length.

Then couplers may also be used horizontally as pending connections for slabs. In that case, the coupler is usually installed on a hook bars and cast in concrete. At a later stage, the coupler may be reconnected with second phase rebar to start the slab reinforcement.

Couplers were also used for underground tunnels and ventilation building.

For the foundations, Dextra also supplied more than 100,000 linear meters of Sonitec tubes, which are easy to set up in reinforcement cages and reconnect, increasing the productivity and removing the need for tedious and unreliable welding operations. Once installed, the tubes are firmly in place, supporting without issue the cage lifting and handling.

Aéroport de Dubaï

Aéroport de Dubaï

L'aéroport de Dubaï est le principal aéroport des Émirats arabes unis. Le célèbre aéroport, situé à quelques kilomètres au nord de la ville de Dubaï, abrite la célèbre compagnie aérienne Emirates. L’aéroport international de Dubaï est l’aéroport #1 au monde en termes de trafic international de passagers.

Dextra Middle-East, également situé à Dubaï, a participé à de nombreux projets de construction de l'aéroport de Dubaï, notamment entre 2003 et 2005, pour la construction du terminal 3 et des halls associés.

Pour le projet interne de Dubaï, Dextra a fourni son populaire
Bartec solution de coupleur, solution de coupleur de barres d'armature #1 aux Émirats arabes unis. 1,5 million de coupleurs ont été utilisés à l'aéroport international de Dubaï.

Superstructure

Les coupleurs Bartec ont fourni une solution technique pour permettre la reconnexion du renforcement de la deuxième phase entre les poteaux et les poutres, et entre les murs et les poutres.

Des coupleurs de barres d'armature ont également été utilisés pour créer des ouvertures temporaires dans l'armature, permettant le passage de l'homme et du matériel.

Fondations

Des coupleurs Bartec ont été utilisés pour les pieux de fondation. Pour cette application, les coupleurs sont devenus partie intégrante d'un processus de fabrication de cages très intégré et automatisé, permettant de connecter ensemble des barres d'armature de grand diamètre en un minimum de temps et de maximiser le rendement de production des cages.

En complément de la solution de coupleur de barres d'armature Bartec, des tubes Dextra Sonitec ont été utilisés pour assurer une installation et une reconnexion rapides des tubes soniques sur toute la longueur des cages. Les tubes Sonitec sont particulièrement faciles à installer grâce à leur embouchure en caoutchouc Push-Fit, et faciles à mettre en place dans la cage grâce à leurs têtes soudées. Plus de 1 800 000 mètres de tubes Sonitec ont été installés sur l'aéroport international de Dubaï au fil des années !

BTS de Bangkok

BTS de Bangkok

Le système de transport en commun de Bangkok (BTS) est un grand système de métro aérien urbain situé à Bangkok, la capitale de la Thaïlande. Le système a été inauguré en 1999.

Depuis 2017, le système se compose de 24 gares surélevées et de 37 km de voies ferrées surélevées organisées en deux lignes principales se croisant à la gare centrale de Siam.

Le système BTS subit une extension de ses deux lignes principales avec des segments de ligne et des stations qui devraient entrer en service en 2019 et 2020.

Fondations

Au fil des ans, pour divers projets, Dextra a fourni des tubes Sonitec, qui sont utilisés pour tester les fondations sur pieux en béton situées sous les gares et les voies ferrées.

Au total, Dextra a fourni environ 40 000 mètres linéaires de tubes Sonitec, une distance en réalité équivalente à la longueur du système BTS lui-même.

Pylônes

Pour les connexions de barres verticales de pylônes, Dextra a proposé ses
Bartec connexion.
Bartec permet d'assembler facilement des cages d'armature préfabriquées à l'aide d'un simple coupleur de barres d'armature, permettant des économies d'acier par rapport au chevauchement et accélérant les opérations sur site.

En Thaïlande, l'opération de filetage est prise en charge par l'usine Dextra, idéalement située au nord-est de Bankgok. Les entrepreneurs reçoivent les barres d'armature déjà préparées et montées avec leur coupleur de barres d'armature.

Veuillez entrer vos informations

Contactez-nous

   Partagez vos informations avec nous et nous vous répondrons dans les plus brefs délais.