Mumbai Metro Line 2B, India
Publié sur par Kansuda Visesthanakorn

Mumbai Metro Line 2B, India
Le Mumbai Metro Line 2B, an essential link connecting several key areas of the city, is a significant infrastructure project aimed at alleviating Mumbai’s traffic congestion and providing efficient public transport. As part of this ambitious project, Dextra has made a valuable contribution, supplying engineered construction materials to ensure the durability and reliability of the structure.
CR Bar 1080 for U-Girder Stressing and Pre-Tensioning
One of the critical components of the project is the elevated section of the metro, which relies on U-girders for support. To enhance the strength and resilience of these U-girders, Dextra supplied its innovative CR Bar 1080 cold-rolled fully threaded post-tensioning bars. These bars, with a diameter of 75mm, are specifically designed to withstand high stress during both U-girder stressing and pre-tensioning operations. The hexagonal nuts provided as part of the system allow for secure fastening and easy adjustment, ensuring precise tensioning to meet the structural demands.
Fully Threaded (FT) Bar for Segment Stitching and Temporary Stressing
For segment stitching and temporary stressing operations during the construction of the metro viaduct, Dextra supplied its fully threaded (FT) bars. These bars provide secure connections between precast segments and offer flexibility for adjustments during the stitching process, ensuring that the structural alignment is perfect before the segments are permanently joined.
Unitec Couplers for Rebar Connections
In addition, Dextra supplied Unitec couplers, designed for connecting rebars at construction sites without the need for pre-threading. These couplers offer a convenient and robust solution, allowing for seamless connection of two rebars, ensuring structural continuity and strength without delays in the construction process.
Sonitec CSL Testing Tubes for Concrete Pile Integrity
In addition to supplying post-tensioning bars, Dextra also provided Sonitec Crosshole Sonic Logging (CSL) testing tubes for the integrity testing of the concrete piles supporting the metro structures. These tubes enable highly accurate non-destructive testing of the concrete, allowing engineers to detect any potential flaws or weaknesses in the piles. This testing is vital for ensuring the piles meet the necessary strength and quality standards, thereby supporting the entire metro system safely and effectively.
Enhancing Metro Connectivity with Quality Solutions
As the Mumbai Metro Line 2B progresses towards completion, Dextra’s contributions to the project highlight its role in providing advanced engineering solutions for infrastructure development. The combination of Barre CR 1080 for post-tensioning, fully threaded bars for segment stitching, Unitec couplers for rebar connection, and Sonitec CSL testing tubes for pile integrity showcases Dextra’s commitment to quality, innovation, and safety in major construction projects.
By contributing to this key metro line, Dextra is playing a part in shaping the future of urban mobility in Mumbai, ensuring that the metro system will be reliable and capable of supporting the city’s growing transportation needs for years to come.
Bartec/Fortec Bridging CAD/BIM Tools Available
Publié sur par Kansuda Visesthanakorn

Bartec/Fortec Bridging Coupler is now available on AutoCAD, Revit, and Tekla for all your construction design and detailing needs!
Ideal for connecting bars that can’t be brought butt-to-butt—perfect for complex prefabricated cages—our Bridging Coupler simplifies rebar connections, helping you streamline your projects.
Start integrating it into your designs today!
Download now:
Central Kowloon Route (CKR) – Central Tunnel, Hong Kong
Publié sur par Kansuda Visesthanakorn

Central Kowloon Route (CKR) – Central Tunnel, Hong Kong
Dextra played a pivotal role in the construction of the Central Kowloon Route (CKR) – Central Tunnel project in Hong Kong by supplying Fortec+ couplers, along with steel rock bolts, expandable friction bolts, umbrella pipes, and post-tensioning bars for tunneling works. These mechanical rebar couplers were integral in ensuring strong and reliable connections within the road tunnel structure, meeting the stringent requirements for safety and durability.
The CKR, a major infrastructure project aimed at improving traffic flow across Kowloon, required advanced construction techniques. Dextra’s Fortec+ couplers, used in locations such as precast panels, tunnel access points, and driveways, contributed significantly to the project’s structural integrity and long-term performance. The Fortec+ system includes a rebar preparation process in which the threaded bar end is proof tested with a tensile load, ensuring non-destructive testing within the elastic zone of the reinforcing bar.
Image credit: Central Kowloon Route – Highways Department
Neo Factory Phase 1, Thailand
Publié sur par Kansuda Visesthanakorn

Neo Factory Phase 1, Thailand
Dextra has played a key role in the construction of the Neo Factory Phase 1 in Pathum Thani, Thailand, one of the country’s leading consumer product manufacturers. By supplying essential Bartec et Groutec S_ systems for precast column connections, Dextra ensured the structural integrity of this significant industrial facility.
Bartec, renowned for its mechanical splicing capabilities, and Groutec S_, designed for secure and easy installation of precast elements, were crucial in making the construction process efficient and reliable. Dextra’s involvement in the Neo Factory project underscores its commitment to providing high-quality, innovative products that support the demands of modern construction, contributing to the continued growth of Thailand’s industrial sector.
San’ao Nuclear Power Plant 1&2, China
Publié sur par Kansuda Visesthanakorn

San’ao Nuclear Power Plant 1&2, China
Création has successfully supplied 340,000 Griptec couplers for the aircraft impact-resistant shell construction of the San’ao Nuclear Power Plant units 1 and 2, featuring the advanced HPR1000 Hualong reactors.
Griptec, recognized as the only 100% proof-tested splicing system, has gained the trust of over ten nuclear reactors globally, cementing its reputation for reliability and safety in high-stakes environments. The system’s stringent quality assurance processes ensure that each coupler meets the demanding standards required for nuclear applications, providing unparalleled performance and durability.
One of the standout features of Griptec is its high-productivity bar end preparation equipment. This state-of-the-art machinery boasts an impressive processing speed of 30 to 45 seconds per bar end, significantly enhancing construction efficiency. Additionally, the equipment is designed for operation by a single operator, optimizing workforce utilization.
Moreover, Création is the first manufacturer of civil construction products with an ISO19443 certified quality management system for nuclear safety. This certification underscores Création‘s commitment to the highest standards of safety and quality in the nuclear industry, demonstrating the company’s commitment to excellence and reliability.
The San’ao Nuclear Power Plant project is a key component of China’s strategic initiative to expand its nuclear power capacity, which is vital for meeting the country’s growing energy needs while reducing carbon emissions. By supplying Griptec couplers, Création is playing a crucial role in ensuring the safety and efficiency of this project.
Réservoirs d'eau de la mission Jal Jeevan, Inde
Publié sur par Kansuda Visesthanakorn

Réservoirs d'eau de la mission Jal Jeevan, Inde
La mission Jal Jeevan du gouvernement indien est une initiative phare visant à garantir un approvisionnement adéquat en eau potable de qualité à des tarifs abordables sur le long terme. Il souligne l'importance d'une bonne gestion de l'eau, du développement des infrastructures et de la participation communautaire pour atteindre l'objectif ambitieux de « Har Ghar Jal » (De l'eau pour chaque foyer).
Compte tenu de la géographie étendue de l’Inde, du terrain accidenté et des établissements humains situés dans des zones reculées, l’accès à l’eau continue constitue un défi. Par conséquent, les réservoirs aériens constituent une bonne option pour stocker et distribuer efficacement l’eau, en particulier dans les zones où les modes d’approvisionnement en eau sont incohérents. La construction et le développement des infrastructures sont encore un autre facteur clé qui a une influence directe sur le développement.
La construction préfabriquée est l'une de ces méthodes qui a pris un essor considérable ces derniers temps en raison de ses avantages, tels qu'une productivité accélérée, un meilleur contrôle de la qualité, le respect de l'environnement et une utilisation optimisée des matériaux et de la main-d'œuvre. Bien que cette méthode entraîne des coûts de mise en œuvre initiaux élevés, son attrait est renforcé par des projets à grande échelle avec des conceptions standardisées. Dans le cadre du projet, notre équipe a travaillé en étroite coordination avec Larsen & Toubro (L&T) dès la phase de conception, en sélectionnant soigneusement les coupleurs Groutec et Bartec pour relier les cadres H et U des réservoirs aériens.
Notre gamme de coupleurs Groutec est sans doute l'épissure mécanique la plus fiable, spécialement conçue pour relier deux éléments préfabriqués sans nécessiter de joints de béton humide sur place. Ces coupleurs ont été qualifiés et testés avec succès au fil des années sur plusieurs projets d'infrastructure majeurs, notamment des supports de canalisations d'usines de traitement, des bâtiments résidentiels et commerciaux et des centres de données, entre autres.
Usine Nestlé LEO, Thaïlande
Publié sur par Kansuda Visesthanakorn

Usine Nestlé LEO, Thaïlande
Nestlé LEO Factory’s reliance on precast elements necessitated a reliable, efficient method for joining the precast structure of the building. The construction utilized Groutec F, a well-known splicing system engineered by Dextra, to meet the exacting demands of the precast building. Groutec F allows for the connection of rebars without the need for bar end preparation and was used for the precast joint connection of beam and column in this project.
Groutec F is a fully grouted connection solution, ensuring robustness and durability in the face of dynamic operational environments. Engineered and manufactured in compliance with industry-leading standards such as Eurocode 2, BS 8110, ACI 318, IBC, and AASHTO, Groutec F guarantees adherence to rigorous structural specifications. It is compatible with major non-shrink grout brands readily available on the market, reducing logistical complexities and procurement lead times.
One Lake Club, Roumanie
Publié sur par Kansuda Visesthanakorn

One Lake Club, Roumanie
One Lake Club est un projet prestigieux qui promet de redéfinir la vie de luxe dans la capitale roumaine. Il vise à établir de nouvelles normes en matière de vie urbaine, en offrant aux résidents un mélange inégalé d'élégance, de confort et de fonctionnalité. Le projet englobe une gamme d'installations résidentielles et récréatives, notamment des appartements de luxe, des espaces verts luxuriants et des équipements de pointe. Avec sa vision ambitieuse et son attention méticuleuse aux détails, One Lake Club représente un phare de l'excellence architecturale moderne à Bucarest.
As construction progresses on this ambitious venture, ensuring the structural integrity of the building is paramount. This is where Dextra’s Bartec couplers come into play. Renowned for their reliability and versatility, Bartec couplers provide robust connections between reinforcing bars, enhancing the strength and durability of concrete structures. In the case of the One Lake Club project, these couplers are specifically tailored for temporary opening applications, offering flexibility and efficiency in construction processes.
The 12mm Bartec couplers serve as the linchpin in the construction workflow, enabling seamless integration of reinforcing bars within the concrete framework. Their innovative design ensures quick and easy installation, minimizing construction time while maximizing safety and performance. By facilitating temporary openings in the concrete structure, these couplers enable efficient access for maintenance, inspection, and future modifications, thereby streamlining the construction process and ensuring long-term durability.