Groupe Dextra | Connexions fiables

Recherche
Fermez ce champ de recherche.
Recherche
Fermez ce champ de recherche.

Port of Neom, Oxagon, Saudi Arabia

 

Port of Neom, Oxagon Port Stage 1 & 2, Saudi Arabia

 
 

As part of Saudi Arabia’s ambitious NEOM development, the Port of NEOM project, also known as the “Oxagon Port Stage 1 & Stage 2”, is envisioned to become the world’s largest floating industrial complex. Located on the Red Sea, the Port of NEOM is set to revolutionize the region with its innovative design and focus on sustainable development.

Dextra has been selected by Six Construct Saudi and MBL (Oxagon Stage 1) and Saudi Archirodon (Oxagon Stage 2), to provide high-performance solutions for this vital infrastructure, supplying 7,750 tons of Barres de liaison marines in various sizes in Grade 500. These tie bars, paired with specialized accessories, are engineered to offer maximum durability and performance, critical to securing the 4-km long quay wall’s stability and longevity in demanding marine conditions.

The Importance of Marine Tie Bars

The quay wall forms the backbone of the new port infrastructure, facilitating vessel docking, cargo handling, and long-term maritime operations. Marine tie bars play an essential role in the integrity of this massive structure.

Dextra’s Barres de liaison marines, manufactured to the highest standards and key to ensuring the required lifetime of the marine structure.

A Partnership for the Future

Dextra’s involvement in the Port of NEOM project underlines the company’s commitment to providing cutting-edge engineering solutions for large-scale infrastructure developments worldwide. As Saudi Arabia continues to build toward its Vision 2030, Dextra’s expertise and high-performance products are playing a pivotal role in shaping the future of this transformative region.

Faire avancer le développement durable : présente les EPD pour les barres de liaison marines

 

Nous sommes fiers d'annoncer le dernier ajout à notre parcours de développement durable : les EPD pour les barres de liaison marines !

Cette réalisation fait suite à nos progrès en matière de construction respectueuse de l'environnement avec les EPD (Déclarations environnementales de produits) pour les coupleurs de barres d'armature et les barres d'armature GFRP. Notre engagement se poursuit alors que nous nous préparons à introduire des EPD pour nos autres systèmes de barres techniques et des solutions supplémentaires. Restez à l’écoute alors que nous continuons à ouvrir la voie à un avenir plus vert et plus durable dans le secteur de la construction !

 

EPD Report for Dextra Marine Tie Bars

Rapport EPD pour les barres d'attache Dextra Marine

Impossible d'afficher le fichier PDF. Télécharger plutôt.

Veuillez entrer vos informations

Contactez-nous

   Partagez vos informations avec nous et nous vous répondrons dans les plus brefs délais.