Le nouveau pont Champlain est un pont de 3 km de long enjambant le fleuve Saint-Laurent à l'entrée sud-est de Montréal, dans la province de Québec (Canada).
The Champlain Bridge is one of the busiest bridges in Canada and plays an important economical role for its city as it is part of the main itinerary to the United States, accessible 60-km South.
For this project, Dextra is supplying its Épissage mécanique des barres d'armature Rolltec system, in both Carbon Steel and Stainless Steel versions. Rolltec is a certified system by the Department of Transportation of the State of Quebec.