Liaison ferroviaire Udhampur-Srinagar-Baramulla (USBRL), Inde

Liaison ferroviaire Udhampur-Srinagar-Baramulla (USBRL), Inde

Udhampur-Srinagar-Baramulla Rail Link (USBRL) is a gigantic infrastructure project by Indian Railways in the Himalayan Mountains, designed to provide rail connectivity to Jammu and Kashmir valleys. This project aims to enable access to the rail network from all parts of the country and connect faraway areas with the rest of India, in response to Prime Minister’s vision of a New India by 2022.

The project is divided into three sections – the 25 km Udhampur-Katra, the 129 km Katra-Qazigund and the 118 km Qazigund-Baramulla tracks. Parts of the lines have already been completed and made operational.

For this massive project, Dextra supplied 3,000 sets of Self-Drilling Rock Bolts to stabilize loose rock mass after excavation.
The Self-Drilling Rock Bolt is a bolting solution for unstable ground conditions and fractured rock formations. The loosening of the rock strata is prevented by drilling a hole in the rock, placing standard sacrificial drill bit and a hollow bar (made of steel or FRP): cementitious grout is then injected into the hollow bar.

As the mega infrastructure project nears completion, the USBRL will link Jammu with Kashmir, opening up a new page for the Indian transportation system.

Ligne rose et ligne jaune du MRT Bangkok

Ligne rose et ligne jaune du MRT Bangkok

Les lignes rose et jaune du MRT sont des lignes de transport en commun rapides surélevées en cours de construction et d'exploitation par la coentreprise BSR (BTS Group Holdings, Sino-Thai Engineering and Construction STEC et Ratch Group RATCH) dans les provinces de Bangkok, Samut Prakan et Nonthaburi. Thaïlande.

Le monorail MRT Pink Line mesurera 34,5 kilomètres de long et comptera 30 stations. Il reliera les districts nord de Bangkok et de Nonthaburi à 5 lignes de transport en commun qui longent un axe de transport clé est-ouest.

La Ligne Jaune, longue de 30,4 kilomètres, comptera 23 stations et reliera 6 autres lignes de transports en commun. Il assurera le transport en commun le long des corridors routiers très encombrés de Lat Phrao et de Srinagarindra.

Dextra a été impliqué dans ces 2 projets d'extension de ligne MRT en fournissant les systèmes d'épissure Bartec. Plus de 440 000 pièces de coupleurs, de taille 16 à 32 mm, ont été installées à l'intérieur des dalles de connexion pour relier les poutres de guidage.

De plus, l'entrepreneur a choisi les barres à tête de Dextra comme alternative aux crochets de barres d'armature pour éviter l'encombrement de l'acier dans les zones fortement renforcées telles que les connexions poutre-colonne. Environ 530 000 barres à petite tête ont été livrées aux chantiers.

La ligne rose du MRT devrait être opérationnelle d'ici juin 2022, suivie par la ligne jaune un an plus tard.

Carrière du chemin Anderson

Carrière du chemin Anderson – Passage souterrain

Le passage inférieur d'Anderson Road fait partie d'un plus vaste projet de réhabilitation des terres en cours à la carrière d'Anderson Road. Le vaste terrain de la carrière, situé au nord-est de Kowloon, servira à terme à héberger jusqu'à 25 000 personnes sur une superficie de 12 hectares.

Nouvel âge de la carrière

Après plus de 60 ans de fourniture de granulats, d'asphalte, de pierre et de béton pour des projets d'infrastructure, le vaste terrain de la carrière sera transformé en la plus récente zone résidentielle et commerciale de Hong Kong. L'ARQ pourra accueillir 25 000 personnes sur une superficie de 12 hectares.

Boulons en acier et en roche de Dextra pour l'ingénierie du sol et le creusement de tunnels

Le passage souterrain d'Anderson Road est un projet de tunnel mené par la coentreprise des entrepreneurs Chun Wo, STEC et Vasteam JV, supervisé par le cabinet de conseil Aurecon.
Pour ce projet, Dextra a fourni au sous-traitant Shun Yue Engineering Company Ltd. des boulons d'ancrage en acier utilisés pour le support du toit du tunnel. Plus de 1 500 chevilles en acier, ainsi que 100 poutres en treillis et 500 pieux en acier ont été installés avec succès sur ce projet.

Dextra a été choisi pour ce projet en raison de ses vastes ingénierie du sol et creusement de tunnels expérience à Hong Kong, ayant fourni de nombreux grands projets de tunnels routiers et métropolitains à Hong Kong au cours des 20 dernières années.
Pour plus d'informations sur nos solutions d'ingénierie du sol à Hong Kong et Macao, veuillez contacter notre Bureau de Hong Kong.

Ligne orange MRT (Centre culturel thaïlandais – Min Buri)

Ligne orange MRT (Centre culturel thaïlandais – Min Buri)

La ligne orange MRT de Bangkok est l'une des lignes de transport en commun rapide prévues par la Mass Rapid Transit Authority of Thailand (MRTA). L'objectif principal de cette ligne ferroviaire de 39,5 kilomètres est d'améliorer la connexion entre les parties occidentale, centrale et orientale de Bangkok, et ainsi de réduire les embouteillages dans la capitale thaïlandaise. Ce projet fait également partie du plan thaïlandais visant à stimuler l'économie nationale et à améliorer les infrastructures.
La ligne orange du MRT est séparée en deux sections : de Bang Khun Non au centre culturel thaïlandais et du centre culturel thaïlandais à Min Buri – comprenant 22 stations souterraines et 7 stations surélevées.

Dextra GFRP Soft-Eyes pour la construction de tunnels

Pour la section Centre culturel thaïlandais – Min Buri, l'entrepreneur Joint-Venture de développement italo-thaïlandais et CKST ont opté pour plus de 40 unités de la solution clé en main de Dextra pour le tunnelage FRP Soft-Eye.
Bien connu pour sa technologie de découpe unique, le polymère renforcé de fibres de verre (GFRP) Soft-eye facilite les effractions et les ruptures du tunnelier (TBM). Il s’agit en fait de la meilleure alternative au renforcement conventionnel en acier – qui nécessiterait la mobilisation de main d’œuvre et d’équipements supplémentaires.

Dextra Sonitec pour les tests Crosshole Sonic Logging (CSL)

Afin de vérifier l'intégrité du béton dans les fondations profondes, Italian-Thai Development, CKST JV et Unique Engineering ont également choisi les tubes de diagraphie sonique à trous transversaux de Dextra – Sonitec. Ces tubes CSL sont disponibles en plusieurs diamètres, et ont été spécialement conçus pour une manipulation facile et rapide afin d'accélérer la vitesse de construction. Plus de 30 000 tubes ont été livrés au projet en mars 2022.

Solutions complètes d'épissure de barres d'armature appliquées aux murs en D du métro

Pour optimiser le renforcement des parois moulées (murs D), Bartec, l'un des systèmes d'épissage mécanique des barres d'armature de Dextra, a été installé. Grâce à sa facilité d'installation, Bartec permet d'accélérer le calendrier des projets et de réduire les stocks car le coupleur standard peut également être utilisé pour les épissures de position. Plus d'un million de coupleurs Bartec ont été livrés sur le site.

De plus, environ 7 000 barres à tête ont été installées à l'extrémité de la barre de renfort comme alternative aux crochets dans les zones encombrées de la structure.

Pour plus d'informations sur nos solutions disponibles en Thaïlande, veuillez contacter notre Bureau de Bangkok.

High Speed 2 (HS2), United Kingdom

High Speed 2 (HS2), United Kingdom

 

The UK’s ambitious High Speed 2 (HS2) project, encompassing 140 miles of track, four state-of-the-art stations, two depots, 32 miles of tunnel, and 130 bridges, is set to redefine sustainable travel and foster economic regeneration for generations to come. Dextra is proud to play a vital role in this transformative endeavor by supplying Griptec couplers to various HS2 sites, ensuring the structural integrity and resilience of this extensive rail infrastructure.

Picture: Victoria Road Crossover Box Site

 

Our Griptec couplers, known for their high-performance rebar connections, have been deployed across numerous key sites, including the Long Itchington Wood Tunnel, Old Oak Common Station, Victoria Road Crossover Box, Colne Valley Viaduct, Chiltern Tunnel and Ventilation Shafts, Thame Valley Viaduct, Curzon Street Viaducts, Edgcote Viaduct,  Canterbury Road Works Headhouse and Ventilation Shaft, and many more. The couplers have been integral in connecting rebars for primary collars, piers, base slabs, crown beams, buttresses, and deck segments, ensuring robust and reliable structural connections.

Picture: Chiltern Tunnel and Ventilation Shafts Site

 

Spotlight on Long Itchington Wood Tunnel: A Legacy of Environmental Responsibility

One of the largest construction sites for HS2 is at Long Itchington Wood, where a 1-mile twin bore tunnel is being built. The tunnel serves a critical purpose: preserving the ancient woodland of Long Itchington by diverting the railway underground. To facilitate the launch of the tunnel boring machine (TBM), a massive excavation at the north portal site was necessary. This involved the removal of approximately 250,000 cubic meters of material, which was then repurposed to form environmental embankments along the mainline.

Dextra supplied nearly 20,000 Griptec standard and position couplers in diameters ranging from 12mm to 40mm for the tunnel construction. These couplers were used in the diaphragm walls, pile caps, and portals, ensuring the durability of connections in the deep and challenging excavation environment. The Griptec system, comprising one male and one female sleeve extruded onto the rebar, facilitated efficient and secure rebar connections that are essential for large-scale projects like HS2.

Le Griptec female sleeves were initially installed at the top of the diaphragm wall. Position assembly—a technique that accommodates non-rotatable rebars—was employed to connect the female sleeves to male sleeves on L-shaped bars within the roof slab. This reinforcement approach was extended to pile caps and later stages of construction, where the couplers reinforced the crown beam by connecting with bent bars through lap length.

Picture: Long Itchington Wood Tunnel Site

 

Empowering Infrastructure with Technological Innovation

As HS2 progresses, Dextra’s Griptec couplers continue to enable rapid and reliable rebar connections, supporting the project’s commitment to quality, safety, and sustainability. By contributing advanced construction solutions, we are proud to be part of HS2’s legacy of environmentally responsible travel, economic regeneration, and technological innovation. Our role in HS2 reflects Dextra’s dedication to advancing infrastructure through high-performance products that meet the needs of complex and large-scale projects.

The High Speed 2 project is poised to transform the UK’s transportation landscape, and with Dextra’s Griptec couplers in place, the rail network is set to endure and thrive for generations to come.

Monorail du Caire

Monorail du Caire

Le monorail du Caire est un système de transport rapide monorail à deux lignes situé au Caire, en Égypte, actuellement en construction. Une fois le projet terminé, les deux lignes fourniront les premières liaisons de transport public entre la nouvelle capitale administrative et la ville du 6 Octobre et la zone métropolitaine du Caire.

La ligne de 54 kilomètres entre la nouvelle ville administrative et l'est du Caire prendra 60 minutes, tandis que la ligne de 42 kilomètres entre la ville du 6 octobre et Gizeh prendra 42 minutes.

Dextra a fourni plus de 300 000 coupleurs standards et de pontage Bartec pour la connexion de deux barres d'armature. Bartec est simple à installer et ne nécessite pas de main-d'œuvre professionnelle qualifiée, ce qui réduit la main-d'œuvre sur le chantier, les coûts de coffrage et augmente la sécurité du chantier.

Environ 400 000 barres à tête Bartec ont également été installées pour remplacer les barres droites ou à crochets dans les éléments et connexions en béton.

De plus, le chantier a utilisé des coupleurs boulonnés Unitec lors des travaux de réparation pour la connexion de deux barres d'armature qui n'avaient pas été préparées au préalable (c'est-à-dire sans filetage).

La première étape du système sera ouverte au public en 2022, suivie d'une deuxième étape en 2023.

Lien vers l'aéroport de Forrestfield

Lien vers l'aéroport de Forrestfield

The Forrestfield Airport Link is a rail infrastructure project lolcated in Perth, Western Australia. The 8.5-km line will connect the existing Midland Line to Perth International Airport and further to the eastern suburbs. The project features two twin-tunnels bored with Tunnel Boring Machines (TBMs) which move up to 26 meter underneath the bed of Swan river, highways and Perth Airport, adding three new stations to the city’s transportation network: Belmont, Airport Central and Forrestfield.

Forrestfield metro plan

For the tunnel boring packages, Dextra supplied a total of 10 Yeux doux en PRV between 2016 and 2017 (two for Airport Central Station, two in Abernethy, four in Belmont and two in Bayswater) to the contractor JV of Salini Impregilo and NRW Salini Impregilo. Soft-Eyes are rebar cages made mostly of Glass-Fiber Reinforced Polymer (GRFP) bars and some steel rebar. Soft-Eyes can be cut by the TBMs and allow faster equipment breakthrough, saving precious time while avoiding to damage the TBM heads.

Dextra also supplied a total of 65,000 Griptec connections for the station works. Griptec is distributed in Western Australia by Dextra’s partner InfraBuild Construction Services. They offer the complete service to the contractor: Cutting the rebar, preparing the bar ends with Griptec sleeves and bending them for final installation on site. This allows the contractor to achieve faster cycle times in rebar connection on site .

Sonitec, Dextra’s steel tubes for Crosshole Sonic Logging tests (to check concrete integrity in bored piles) were also supplied.

The Forrestfield-Airport Link will operate in 2022.

For more information about our solutions in Australia, please consult our Bangkok bureau

Ligne 3 du métro de Bruxelles

Ligne 3 du métro de Bruxelles

Brussels Metro is a rapid transit system that serves a large portion of the Brussels, Capital Region of Belgium. It consists of 4 conventional metro lines and 3 pre-metro lines.

Line 3 is tram line that runs through the city center from Churchill in the south to Esplanade in the north, using the North-South Axis tunnel. The total route will be 10.3km long.

An 150m long new tunnel is being dug underneath the Brussels North railway station to connect two existing underground tunnels. It will be an important component of the new metro link.

Dextra supplied Sonitec, a tube solution invented to facilitate the integrity testing of foundations using the CSL testing method, to the construction site of Line 3. 13 kilometers of the tubes were installed in the 18m long pile cages.

Sonitec system have been designed for the sole purpose of facilitating the assembly and installation of long tube lengths in reinforcement cages.

Cairo Metro Line 4 – Phase 1

Cairo Metro Line 4 – Phase 1

The Cairo Metro is the rapid transit system in Greater Cairo, Egypt. It was the first of three full-fledged metro systems built in Africa, as well as the first in the Arab world. It began service in 1987 as Line 1 between Helwan and Ramsis Square, covering a distance of 29 kilometers.

The Cairo Metro currently has 74 stations, 3 of which are transfer stations, with a total length of 89.4 kilometers as of August 2020. There are three operating lines in the system, numbered from 1 to 3.

The new Line 4 will run from Makram Ebeid Station to Police Academy Station near the Ring Road, with bored tunnels following Doctor Hassan El-Sherif Street and Ahmed El-Zomor Street. It will be 24 kilometers long in total. Construction began in Q3 2019 and is expected to be completed in 2024.

Dextra has supplied 450,000 Bartec+ couplers and 42 GFRP soft-eyes for the reinforcement of the diaphragm walls.

Bartec+ is a mechanical splicing system with parallel threads for connecting concrete reinforcement bars with diameters ranging from 12 to 50 mm (ASTM #4 to #18). Its threaded bar end is tensile tested at 90% of the rebar yield strength.

Dextra’s GFRP soft-eye is an integrated turn-key solution that uses cut-able Glass Fiber Reinforced Polymer (GFRP) reinforcement as an alternative to traditional steel rebars, allowing the penetration of Tunnel Boring Machines (TBM) to pass through diaphragm walls with ease.

Métro de Lucknow – Phase 1

Métro de Lucknow – Phase 1

The Lucknow Metro project is built to serve growing population of Uttar Pradesh, North India, as well as to serve the areas that are not connected by the existing rail system. The 35-kilometer rail system comprises 22 stations, of which 19 will be elevated.
The first phase of the project consists in construction of 2 rail lines (North- South and East-West corridor), connecting four corners of Lucknow by running through the heart of the city. Being implemented by Lucknow Metro Rail Corporation (LMRC), the Phase 1 comprises the construction of 22.88-kilometer long North-South corridor. The priority section is 8.5 kilometers, linking Transport Nagar to Charbagh.
Once operational, the Lucknow Metro will help ease the traffic in the city, and will also reduce commuters’ travel time.