Groupe Dextra | Connexions fiables

Arène de Bangkok

Arène de Bangkok

The Bangkok Arena is a multisport indoor arena located in the Nong Chok district, east of Bangkok. Originally commissioned to host futsal tournaments, an indoor version of football, the arena now also hosts volleyball and basketball events, as well as concerts. It has a seating capacity of up to 12,000 people.

For this project, Dextra engineered and supplied the Tiges de tension suspending the roof of the building in 2012.

The long architectural bar systems are anchored to concrete pylons and act as suspenders to support the building’s roofing structure.

For this project, Tiges de tension were supplied in Grade 700, the highest in our range. The highest grade allows for a better performance-to-steel ratio, enabling the use of smaller diameters. This results in a slimmer structure and overall improved aesthetics. Additionally, smaller-diameter bars and lighter elements facilitate easier handling and installation on-site.

Each bar segment is spliced to the next using either couplers (for fixed lengths) or turnbuckles (for length adjustment and tensioning).

Connection to the concrete structure is achieved through fork ends mounted onto steel gusset plates.

In total, more than 129 tons of Tiges de tension anchor the roof structure, with tendons exceeding 30 meters in length.

Barrage de Chaglla

Barrage de Chaglla

Chaglla Dam is a hydroelectric dam built on the Huallaga River in the Huánuco region of Peru. The dam stands 203 meters high and has a maximum installed capacity of 456 MW.

For this major dam project, Dextra consistently supplied its Rolltec rebar coupler solution to Brazilian contractor Odebrecht from 2012 to 2015.

Rolltec is the most popular rebar splicing solution in Latin America, offering a competitive alternative to lap splices.

Rebar preparation is supported by a unique lightweight machine, which can be operated by a single person. The Rolltec machine is relatively easy to transport and convenient to install, even in remote locations such as dam construction sites.

Beyond just couplers and equipment, Dextra also took charge of machine commissioning and operator training, ensuring the contractor’s team made the most of their rebar coupler solution.

Station de métro Msheireb de Doha

Station de métro Msheireb de Doha

La station Msheireb est la principale station d'échange du métro de Doha. Situé au centre-ville de Doha, il relie les trois lignes (Rouge, Verte et Or) et constituera une porte d'entrée pour les stades de la Coupe du Monde de la FIFA 2022.

La station Msheireb deviendra l’une des plus grandes stations de métro au monde en termes de taille.

TYMPANS COMPOSITES POUR LES TUNNELIERS for TBMs

For this major project, Dextra engineered and supplied between 2013 and 2015 8 large ASTEC GFRP Soft-Eyes, of a diameter of 8 meters each. Soft Eyes are cages of GFRP rebar, positioned into the D-Walls in-between steel segments. GFRP Soft-Eyes allow Tunnel Boring Machines (TBMs) to go through in a minimum time as the bars can be easily crushed by the tunnel machine.

Ancrages d'arrimage

To anchor the massive d-walls and prevent any soil displacement during excavation works, Dextra also supplied its ASTEC Active Anchors (AAA). Those innovative post-tensioned GFRP-based anchors, have the benefits of being cut by the Tunnel Boring Machines or standard excavation equipment. Because it can be easily cut, it doesn’t need to be removed from the ground, even when used for temporary applications.

Dans le cas des stations Msheireb, des ancrages multi-tendons (10 par ancrage sur ce projet) ont même été installés au centre de Soft-Eye pour ancrer le D-Wall. Ces ancrages ont également été coupés lors du percement du tunnel (visible dans la vidéo ci-dessous). Au total, 150 ancres ont été installées dans la station.

Terminal 5 de l'aéroport d'Heathrow

Terminal 5 de l'aéroport d'Heathrow

L'aéroport d'Heathrow, situé à environ 25 km à l'ouest du centre de Londres, est l'aéroport international le plus fréquenté du Royaume-Uni.

Dextra a participé à la construction du Terminal 5 et de ses structures associées.

Pour l'aéroport d'Heathrow, Dextra a fourni ses barres d'armature les plus avancées Solution de raboutage:Griptec, qui est distribué au Royaume-Uni par des fabricants experts locaux.

Grâce à ses hautes performances, sa fiabilité intrinsèque, la mise en charge systématique de chaque connexion en usine et sa certification complète, Griptec est recommandé par les plus grands consultants du monde entier. Au Royaume-Uni, Griptec détient les trois certifications CARES pour les produits d'épissure : TA1-A, TA1-B et TA1-C.

Pour nos distributeurs assurant la préparation des barres d'armature, la solution Griptec est à la fois pratique et productive. Elle s'appuie sur une machine intelligente pilotée par un seul opérateur, offre des temps de cycle très efficaces (environ 45 secondes par barre préparée) et inclut un test qui teste systématiquement les charges de chaque connexion barre/manchon.

Pour les entrepreneurs, Griptec offre un moyen simple, efficace et fiable de connecter les barres d'armature dans les colonnes, parois mouléeset dalles. À Heathrow, l'une des applications concernait le toit de la nouvelle station de métro. Des connexions Griptec ont également été utilisées pour créer des ouvertures temporaires permettant aux ouvriers et aux équipements de circuler librement à travers la structure en acier. Ces ouvertures pouvaient être facilement fermées à l'aide de barres d'armature munies de connexions Griptec à leurs deux extrémités.

Grâce à sa technologie de filetage parallèle, Griptec ne nécessite aucun serrage dynamométrique spécifique et peut être vérifié par simple inspection visuelle, offrant un avantage significatif pour simplifier le calendrier du projet et maximiser la productivité opérationnelle.

Petronas RAPIDE

Petronas RAPID: A Strategic Petrochemical Complex in Malaysia

Petronas RAPID (Refinery And Petrochemical Integrated Development) is a large-scale petrochemical complex located in the southernmost part of Johor, Malaysia, across the sea from Singapore.

Commissioned in 2016, the RAPID development aims to increase local production capacity by 300,000 barrels per day, making it a strategic asset for the Malaysian peninsula.

Pour ce projet, Dextra a fourni son Bartec system for the construction of precast pipe racks across the site. A total of 30,000 Bartec Têtes d'ancrage were used to create horizontal anchoring points for pipe rack beams.

To support the project, a Bartec machine was installed directly on-site and commissioned by the Dextra team, ensuring efficient bar preparation and seamless integration into the construction process.

Stade Ras Abu Aboud, site de la Coupe du Monde de la FIFA 2022

Stade Ras Abu Aboud, site de la Coupe du Monde de la FIFA 2022

Ras Abu Aboud Stadium is a football stadium under construction in Doha, Qatar, with a capacity of 40,000 spectators.

This project has been specifically designed to host the 2022 FIFA World Cup. The stadium features a modular design, incorporating recycled shipping containers, removable seats, and other modular building blocks. After the tournament, it will be completely dismantled and repurposed.

Dextra supplied more than 600 sets of carbon steel tension rods for the cross-bracing of the roofing and bowl structures, as well as for staircases, catwalks, and ramps. The tension rods range in bar thread size from M20 (diameter 19 mm) to M72 (diameter 70 mm).

Upon its expected completion in 2020, Ras Abu Aboud Stadium will set a new standard in sustainable construction design.

L'installation de traitement des eaux usées record d'Égypte

L'installation de traitement des eaux usées record d'Égypte

Le Bahr El Baqar wastewater treatment plant is located in the northern governorate of Port Said and has a daily output capacity of 5.6 million cubic meters. It is a joint venture between the Arab Contractors Company et Orascom Construction.

The plant is the world’s largest of its kind, holding three Guinness World Records:

  • Le largest water treatment facility, processing 64.8 cubic meters per second
  • Le largest sludge treatment plant
  • Le largest single-operator ozone generating plant

Dextra is proud to contribute to this project by supplying Rolltec rebar couplers for the reinforcement of the plant’s concrete structures.

Rolltec is a CARES-approved, rolled parallel-threaded mechanical splicing system designed for connecting concrete reinforcing bars from Ø12 to 50 mm (ASTM #4 to #18). It offers fast and easy preparation and installation on-site.

Source des images : https://www.arabcont.com/english/project-624

Aéroport de Dubaï

Aéroport de Dubaï

L'aéroport de Dubaï est le principal aéroport des Émirats arabes unis. Situé à quelques kilomètres au nord de Dubaï, ce célèbre aéroport abrite la célèbre compagnie aérienne Emirates. L'aéroport international de Dubaï est le #1 au monde en termes de trafic international de passagers.

Dextra Middle East, également basée à Dubaï, a été impliquée dans de nombreux projets liés à la construction de l'aéroport de Dubaï, notamment de 2003 à 2005, lors du développement du Terminal 3 et des halls associés.

Pour le projet international de Dubaï, Dextra a fourni sa solution de coupleur Bartec, leader des coupleurs pour barres d'armature aux Émirats arabes unis. Au total, 1,5 million de coupleurs ont été utilisés à l'aéroport international de Dubaï.

Superstructure

Les coupleurs Bartec ont fourni une solution technique pour reconnecter les armatures de deuxième phase entre les poteaux et les poutres, ainsi qu'entre les murs et les poutres.

Des coupleurs de barres d'armature ont également été utilisés pour créer des ouvertures temporaires dans l'armature, permettant le passage du personnel et de l'équipement.

Fondations

Des coupleurs Bartec ont été utilisés pour les pieux de fondation. Dans cette application, ils ont été intégrés à un processus de fabrication de cages hautement intégré et automatisé, permettant la connexion rapide de barres d'armature de grand diamètre et optimisant la production de cages.

En complément de la solution de couplage pour barres d'armature Bartec, des tubes Dextra Sonitec ont été utilisés pour assurer une installation et une reconnexion rapides des tubes soniques sur toute la longueur des cages. Les tubes Sonitec sont particulièrement faciles à installer grâce à leur embouchure en caoutchouc Push-Fit et à installer dans la cage grâce à leurs têtes soudées. Au fil des ans, plus de 1 800 000 mètres de tubes Sonitec ont été installés à l'aéroport international de Dubaï !

BTS de Bangkok

BTS de Bangkok

The Bangkok Mass Transit System (BTS) is a large urban skytrain system located in Bangkok, the capital of Thailand. The system was inaugurated in 1999.

As of 2017, the system consists of 24 elevated stations and 37 km of elevated rail organized into two main lines crossing each other at Siam central station.

The BTS system is undergoing an extension of its two main lines, with line segments and stations expected to enter into operation in 2019 and 2020.

Fondations

For various packages over the years, Dextra has supplied Sonitec tubes, which are used to test the concrete pile foundations beneath stations and tracks.

In total, Dextra supplied approximately 40,000 linear meters of Sonitec tubes, a distance actually equivalent to the BTS system’s length itself.

Pylônes

Pour les connexions de barres verticales de pylônes, Dextra a proposé ses Bartec solution.

Bartec allows contractors to conveniently splice prefabricated rebar cages using a simple rebar coupler, allowing savings in steel compared to overlap splicing and accelerating site operations.

In Thailand, the threading operation is supported by Dextra’s factory, conveniently located in the northeast of Bangkok. Contractors receive the rebar already prepared and mounted with their rebar coupler.

Réservoirs Cylingas

Cylingas Reservoirs: Industrial Gas Storage in the UAE

The Cylingas gas tanks are part of the industrial complex of Cylingas, located in Al Quoz, United Arab Emirates.

For the installation of new gas tanks, Dextra supplied its tension rods systems, which were used for the cross-bracing of the tank footing structure. Carbon steel rods in Grade 355, with a diameter of 120 mm (thread M123), were selected for this application. The rods were delivered with forks, lock covers, and turnbuckles. A total of 48 sets were installed for this project.

The assemblies were fixed onto the pylons using gusset plates connected to the forks. Turnbuckles were installed in the lower part of the assembly to facilitate installation, allowing for length adjustment and stress control by bringing two bar segments closer together.

For more information on Tension Bars in industrial settings, please download our dedicated introduction brochure.

Pour plus d'informations sur la disponibilité de systèmes de barres hautes performances au Moyen-Orient, veuillez contacter notre Bureau de Dubaï.