Bâtiment d'entretien automobile Kung Chong Rd. Singapour

Bâtiment d'entretien automobile Kung Chong Rd. Singapour

The Car Servicing Building located at 2 Kung Chong Road in Singapore is a mixed-use 7-storey car park basement, car servicing facility and office building. The building will be occupied by the Automobile Association of Singapore.

This project, built by Zhengda Corporporation Pte Ltd, is taking advantage of precast technology to achieve faster construction cycles. The production of the precast elements was performed by the Malaysian precaster Eastern Pretech.

For this project, Dextra delivered to Malaysia about 6,000 Groutec couplers, which have been embedded into shear walls and column elements.

The elements were then brought to site and reconnected to protruding reinforcement by injecting non-shrink grouting mortar. Bracing around the precast element is usually removed in the 3 days following the grout injection, significantly reducing the assembly time.

For more information about the availability of precast solutions in Singapore, please contact Dextra team in Malaysia.

Agrandissement du BITEC de Bangkok

Agrandissement du BITEC de Bangkok

BITEC, Bangkok International Trade & Exhibition Centre, est un grand lieu d'exposition situé à l'est de Bangkok, dans le quartier de Bang Na.

Dextra a participé à l'agrandissement de la phase II du parc des expositions, qui s'est déroulé entre 2014 et 2016. Le projet d'agrandissement a ajouté 3 halls d'exposition, soit plus de 32 000 m² d'espace d'exposition sous une hauteur de plafond de 25 mètres.

Dextra a travaillé en collaboration avec l'entrepreneur italo-thaïlandais pour concevoir et fournir à long terme systèmes de barres de tensionqui soutiendra la structure du toit au-dessus des nouveaux halls d'exposition BITEC.

Au total, Dextra a livré 298 assemblages de différents diamètres, chacun composé de plusieurs barres reliées par des coupleurs et des tendeurs et ancrées à la structure par des extrémités en fourche, avec des longueurs totales d'assemblage dans plusieurs cas dépassant 50 mètres de long (33 mètres en moyenne).

La livraison a eu lieu fin 2015 et l'installation a été achevée mi-2016. Les Bangkokiens peuvent encore facilement admirer le Barres de tension structure de toiture lorsque vous vous arrêtez à la station BTS Bearing ou que vous empruntez l'autoroute Bang Na Trat.

Pour des structures aussi grandes, Barres de tension offrent de nombreux avantages par rapport aux autres solutions de « tension » : un allongement sous charge plus faible, des forces de post-tension requises moindres, une meilleure résistance à la corrosion, une relaxation à long terme réduite et des coûts de maintenance et de surveillance réduits.

De plus, ils sont faciles à installer grâce à leurs extrémités en fourche et offrent une structure de toiture très esthétique.

Mumbai Nathani Heights

Mumbai Nathani Heights

Nathani Heights is a 72-storeys skycrapper in Mumbai. With a total height of 262 meters it is among the 30 tallest building in the city. The construction of the building started in 2012 and will be completed in 2018.

For this project, Dextra supplied its famous Bartec rebar coupler solution. Bartec is the main rebar coupler solutions in India, satisfying all technical requirements even in seismic areas.

As in other highrise building, rebar couplers have been used for large diameter rebar connection in vertical applications such as columns and corewalls (bar to bar vertical connection).

Rebar couplers were also used for slab connections. In that case, the coupler is pre-positionner flush with formwork (allowing climbing formwork to go up). After casting, a threaded rebar is simply screwed inside the coupler to create the starter bar.

Musée du Louvre Abou Dhabi

Musée du Louvre Abou Dhabi

Le Louvre Abu Dhabi est un musée d'art et de civilisation innovant situé au nord de la ville d'Abu Dhabi, capitale des Émirats arabes unis. C'est le plus grand musée de la péninsule arabique, avec une superficie totale de 24 000 mètres carrés. Le Musée du Louvre Abu Dhabi a ouvert ses portes le 11 novembre 2017.

Pour ce projet, Dextra a participé aux travaux de bétonnage entre 2013 et 2014, en fournissant Bartec Solution de coupleur de barres d'armature d'Arabtec pour toutes les connexions de barres d'armature dans les radiers et les colonnes. Des coupleurs ont également été utilisés pour créer des ouvertures temporaires dans la structure de renfort afin de permettre le passage des hommes et du matériel. Au total 110 000 Bartec des coupleurs de barres d'armature ont été fournis pour ce projet.

Le Bartec solution est une solution approuvée par le DCL (Dubai Central Laboratory), rendant son utilisation possible aux Emirats Arabes Unis. Tous les services de filetage pour préparer les barres d'armature utilisées au Louvre Abu Dhabi ont été réalisés par le réseau de distributeurs de Dextra.

Pour plus d'informations sur la disponibilité des solutions d'épissure de barres d'armature au Moyen-Orient, veuillez contacter notre Bureau de Dubaï pour plus d'informations.

Nouvelle Grande Mosquée d'Alger

Nouvelle Grande Mosquée d'Alger

La nouvelle mosquée Djamaa El Djazair d'Alger est un vaste projet de construction situé dans la partie orientale de la capitale algérienne. Il comportera le minaret le plus haut du monde avec une hauteur de 265 m. De plus, le grand complexe pourra accueillir jusqu’à 120 000 fidèles.

Pour le bâtiment de la mosquée principale, Dextra a fourni ses Systèmes de barres de tension à China State Construction Engineering Corporation, l'entrepreneur principal de ce projet. Au total, ce sont plus de 800 structures barre de tension des assemblages de diamètres allant de M16 à M56 qui sont utilisés pour le contreventement de la structure de toiture de la salle de prière en forme de dôme.

Chaque tige de tension est peint en blanc pour correspondre au design intérieur de la mosquée. Les disques de renfort (photo en haut à gauche) ajoutent à la finition architectonique particulière de la structure.

Pour la construction du bâtiment et du minaret, Dextra a également fourni son populaire Bartec solution de coupleur, également disponible en Algérie à travers notre réseau de distributeurs. consultez notre bureau de Paris pour plus d'informations.

Place Maryah

Place Maryah

Maryah Plaza est un développement commercial à usage mixte situé sur l'île d'Al Maryah, désigné pour devenir la nouvelle destination commerciale et de style de vie des Émirats. Les quatre tours adjacentes à l'eau comprennent des appartements résidentiels, un hôtel 5 étoiles et des points de vente. Le projet vise à créer un espace public ouvert où les utilisateurs peuvent se promener librement dans le développement.

Création Jambes de compression sont utilisés dans l'une des quatre tours de Maryah Plaza. Les quatre ensembles de Jambes de compression livrés par Dextra, s'intègrent élégamment dans les étages du hall de la tour, l'ouvrant ainsi sur une vue sur le front de mer. Les entretoises de compression sont utilisées pour soutenir des structures lourdes. Dans ce projet, elles sont utilisées comme élément de contreventement transversal, augmentant ainsi la capacité de la tour à résister aux charges sismiques.

Quatre ensembles de 60 cm de diamètre Jambes de compression ont été utilisés dans le projet. Ce sont les ensembles les plus grands et les plus performants Jambes de compression Dextra jamais construit. Grâce à une conception épurée et à sa fonction pratique de verrouillage par goupille et fourche, les ensembles ont été assemblés sur site en une semaine.

Le Jambes de compression est une barre circulaire à section creuse et est coiffée aux extrémités par une fourche filetée. Cette conception à fourche filetée facilite l'assemblage, permettant aux travailleurs d'assembler la jambe de force sur site en quelques minutes.

Tours de jardin

Tours de jardin

Business Garden Bucharest is a modern mixed used class A office complex. It features retail spaces, pairing with commercial and public services on the ground level. The name Business Garden stems from its integrated spacious green area, a garden connecting the buildings with designated recreation spaces. Generous lawn area, pedestrian pathways, and benches with free Wi-Fi are provided to invite the office goers to work or take a refreshing break outside. The complex is LEED Platinum pre-certified. To support the tenant’s everyday life needs of their employees, Business Garden Bucharest’s offices are designed to have efficient layout, built with high quality finishes and sustainable solutions that are in line with LEED Platinum green certifications.

For this project, Dextra was involved in the supply of its Fortec rebar coupler solution. The Fortec solution is made up of a standard rebar coupler that can be utilize as both standard and position splices connecting two rebar ends that have been previously enlarged and threaded. Fortec is especially suitable for seismic environment construction, which is the case of buildings in the Bucharest area.

Fortec couplers have been used to provide superstructure vertical connections. Fortec couplers are relatively compact and can help to reduce the congestion created from rebar lapping. Fortec couplers also provided temporary opening, allowing movement of the workers and equipment around the reinforcement. Before casting, the continuation bars are simply connecting to the couplers, filling the temporary opening gap.

Complexe Icon Siam | ไอคอนสยาม

Complexe Icon Siam | ไอคอนสยาม

Le complexe Icon Siam, situé sur la rive droite de la rivière Chao Phraya à l'ouest de Bangkok, est un nouveau complexe commercial/résidentiel polyvalent composé de deux immeubles de grande hauteur et d'un centre commercial. Ce nouveau projet d'envergure vise à redonner son glamour aux rives du fleuve Chao Praya.

Les deux tours devraient atteindre respectivement 280 m (SuperLux Tower) et 315 m (Magnolia Tower). La tour Magnolia sera ainsi légèrement plus haute que la tour MahaNakhon, le plus haut bâtiment de Bangkok depuis 2015.

Dextra fournit à Thai-Obayashi (entrepreneur de la structure du centre commercial) et Italian-Thai (entrepreneur des deux tours) sa solution d'épissure de barres d'armature Bartec.

Les ingénieurs de Dextra ont dispensé des formations aux opérateurs et effectué une maintenance préventive directement sur site pour garantir un rendement maximal dans la production de filetage.

Au total, plus de 800 000 Bartec coupleurs de barres d'armature et 20 000 Bartec Barres à tête sont utilisés dans les fondations et les superstructures dans les applications suivantes :

Chevilles en forme de L (connexions mur-dalle)

Il s'agit d'une application typique utilisée dans les murs en D de fondation pour éviter les barres d'armature saillantes. il est également utilisé en superstructure pour permettre au coffrage glissant de remonter sans aucune perturbation

Remplacement des barres à crochets par des ancrages d'extrémité

Lorsque l'armature du mur est particulièrement encombrée, l'utilisation de barres à tête (également appelées ancrages d'extrémité) permet d'ancrer l'armature dans le mur sans avoir besoin de réaliser des crochets.

Assemblage à double extrémité dans les murs de refend

Cette solution permet de créer une continuité à l'intérieur de la colonne ou du mur en reliant deux dalles ou poutres horizontales.

Coupleurs soudés pour structures composites

Parfois, il est nécessaire de commencer le renforcement à partir de la structure en acier. Dans ce cas, les coupleurs soudables sont la solution idéale : fabriqués en acier à faible teneur en carbone, ils peuvent être soudés facilement et permettent la connexion à une barre d'armature filetée.

Monument 81, Hô Chi Minh-Ville

Monument 81, Hô Chi Minh-Ville

Landmark 81 est un nouveau projet de tour situé sur la rive de la rivière Saigon à Hô Chi Minh-Ville. Le projet appartient à la société vietnamienne Vingroup.

La tour, dont la construction a débuté fin 2014, devrait atteindre une hauteur de 462 mètres, un nouveau record de hauteur au Vietnam. Landmark 81 sera la 11ème tour la plus haute du monde.

Pour ce projet, Dextra fournit son réputé
Bartec solution à l'entrepreneur Coteccons. La solution Bartec a été approuvée par ARUP, consultant représentant le propriétaire, et MACE International, consultant en structure.

Au total, 250 000 coupleurs Bartec seront utilisés pour la connexion des barres d'armature verticales dans le mur central et les colonnes ainsi que pour les applications horizontales telles que les connexions mur central à poutre et mur central à dalle.

L'utilisation de coupleurs de barres d'armature permet aux coffrages grimpants de se déplacer sans entrave et de relier les barres de départ des dalles de manière très productive. Ces technologies combinées à une surveillance du béton de pointe permettent des cycles de construction très rapides aussi courts que 35 heures par étage.

Pour les applications composites (poteaux en acier vers poutres), Dextra a également fourni 20 000 coupleurs soudables.


Exemple de coupleur Bartec soudable sur poutre

Le chantier de construction au rythme rapide est soutenu par trois ensembles d'équipements Dextra Bartec, installés directement sur place. L'équipement est entretenu par Dextra et exploité par le distributeur de Dextra au Vietnam, Lotus Greentech.

Les travaux de bétonnage ont été achevés plus tôt que prévu début 2018.

Tours Orhideea de Bucarest

Tours Orhideea de Bucarest

Orhideea Towers est un complexe d'immeubles de bureaux à deux tours situé dans la partie ouest de Bucarest. Les tours mesurent respectivement 85 m (17 étages) et 64 mètres de haut (13 étages). Les deux tours sont reliées par l'utilisation d'un pont aérien.

Pour ce projet, Dextra a participé à la fourniture de sa solution de coupleur de barres d'armature Fortec. La solution Fortec est composée d'un coupleur de barres d'armature standard, utilisé à la fois pour des applications standard et positionnelles, connecté à deux extrémités de barres d'armature préalablement élargies et filetées. Fortec est particulièrement adapté à la construction en environnement sismique, ce qui est le cas des bâtiments de Bucarest. zone.

Des coupleurs Fortec ont été utilisés pour fournir toutes les connexions de renforcement dans le tapis de fondation fortement renforcé (1,5 mètres d'épaisseur). Les coupleurs Fortec sont relativement compacts et évitent la tâche fastidieuse de chevauchement des barres d'armature dans un environnement encombré.

Des coupleurs Fortec assuraient également une ouverture temporaire, permettant la circulation des hommes et des équipements autour du renfort. Avant la coulée, les barres de continuation se connectent simplement aux coupleurs, comblant ainsi l'espace d'ouverture temporaire.