Groupe Dextra | Connexions fiables

Recherche
Fermez ce champ de recherche.
Recherche
Fermez ce champ de recherche.

Grand Paris Express: High Performance Composite Anchors Installed!

ASTEC Active Anchors have been installed by Franki Foundations & Atlas Foundations for stabilizing excavation works of the Bagneux station (Metro M4 extension and future M15), in the North of Paris. The solution has been approved for this project by engineering consulting firm SYSTRA. 

ASTEC Active Anchors are the preferred solution for subway stations works as Tunnel Boring Machine and standard earth-moving equipment can simply cut anchors’ FRP tendons at any stage, removing all needs of unreliable anchors pull out. 

After numerous successful projects in the Middle East, this was the first time ASTEC Active Anchors were installed in Europe.

Learn more about ASTEC Active Anchors

Complexe résidentiel multitours à Bangalore

Dream Acres est un grand complexe résidentiel (superficie de 81 acres) situé à l'est de Bangalore en Inde. L'ambitieux programme immobilier comprend 13 tours de 14 étages construites en un temps record grâce à l'utilisation de méthodes de construction préfabriquées soutenues par une usine spécialement construite et alimentée par les équipements Vollert.

Dextra fournit au propriétaire et développeur Sobha les produits et services suivants :

Coupleurs Groutec, utilisés pour la connexion rapide d'éléments préfabriqués soit à une semelle, soit directement à un autre élément préfabriqué. Sur Dream Acres, les coupleurs Groutec assemblent avantageusement les panneaux muraux porteurs, assurant une connexion haute performance et accélérant l'installation par rapport aux méthodes de joints humides in situ plus traditionnelles.

En savoir plus sur Groutec.

Coupleurs Bartec, la solution d'épissure de barres d'armature haute performance est basée sur deux barres filetées Bartec et un coupleur Bartec. Bartec est utilisé dans Dream Acres pour les applications coulées sur place ainsi qu'à l'intérieur des éléments préfabriqués.

En savoir plus sur Bartec.

Services de préparation de barres d'armature. Dextra India prend en charge les opérations de préparation des barres d'armature à l'aide des équipements Bartec conçus et fabriqués par Dextra. Les barres d'armature avec extrémités filetées Bartec sont livrées directement à Sobha selon leur calendrier. Les mêmes barres peuvent être utilisées indifféremment avec les coupleurs Bartec ou Groutec car les deux solutions bénéficient du même système de filetage.

Félicitations à Sobha pour avoir déjà terminé les premières tours plus tôt que prévu. Les équipes de Dextra attendent avec impatience des connexions préfabriquées et in situ plus réussies sur les prochaines phases du projet !

Charity – Two Dextra team running at Peak24 race in Hong Kong

IMG 7157

 

Two teams of 5 runners mixing members of Dextra Guanghzou factory et Hong Kong offices have lined up at the start of Hong Kong’s Peak24 race.

 

This annual 24-miles race raises awareness and funds to fight against modern days human trafficking. As 35 million children and adults are considered to be enslaved around the world today, including in South East Asia, raising awareness of the public opinion is key to promote ethical consumption alternatives and push governments to put an end to those illegal and barbaric practices.

Congratulations to Aileen, Jenny, Shirley, Michelle, Steven, Kelvin, Keefe, Michael, Owen and Navy for running in the name of Dextra for this great event and completing the race with success!

Learn more about modern slavery and Peak24 event.

 

IMG 7163

IMG 7164

Dextra rebar couplers now available for Revit 2017

Autodesk recently released the latest version of Revit, its main 3D drawing and architectural software. 2017 version of the app now includes a new rebar couplers and end anchors tool, directly available from the tool bar.

To support this new feature, Dextra released all its coupler range in Revit Product Family format so it is now very simple to browse and insert couplers into your structure.

All Revit Family attribute files can be downloaded directly from our Télécharger after registration and log in. All instructions are available into the package.

Contact us at This email address is being protected from spambots. You need JavaScript enabled to view it. if you have any question regarding the use of our designer’s tool.

Architectural Bars for Sabah Al-Salem Kuwait University City

Dextra Architectural Bar Solutions are used around the world in a variety of applications: roof structures, façades, pedestrian and road bridges.

Our range is designed with flexibility in mind so that architects and designers can fully express their creativity. No other barre de tension range on the market provides such a choice of steel grades, diameters, accessories and surface finishes. It’s all about finding the right product to perfectly match your idea.

One of our latest references in the Middle East is the Sabah Al-Salem Kuwait University City. Barres de tension are anchoring the tent-shaped structures which provide shades to all parking areas.

More than a thousand systèmes de barres de tension have been installed across the campus. Steel grade 700 has been systematically preferred in order to use smaller bar diameters (M16 to M33) and accessories. This makes the anchoring less visible and enforces the impression that the “tents” are floating above the ground.

Learn more about tension bar systems

Bangkok MRT Blue Line extension

Bangkok, Thailand.

On the 24th of March 2016, Tunnel Boring Machine successfully broke through Dextra ASTEC Soft Eyes in d-wall of Wang Burapha Station (Burapha/Charoen Krung rd.). Soft Eyes are temporary structures made of cut-able GFRP bars that allow TBMs to pass through, saving much efforts and time for the tunnel creation. More information about ASTEC Soft Eyes.

Coupleurs de barres d'armature pour la plus haute tour du monde

La tour qui deviendra bientôt le bâtiment le plus haut du monde est actuellement en construction en Arabie Saoudite. La tour de Jeddah (anciennement appelée Kingdom Tower) devrait franchir la barre du kilomètre, ce qui la rendra 180 mètres plus haute que la tour Burj Khalifa de Dubaï. La structure de la tour a été conçue par le cabinet de conseil Thornton Tomasetti et est construite par l'entrepreneur Saudi Ben Laden.

La Jeddah Tower accueillera à terme un hôtel Four Seasons de 200 chambres, des appartements de service, plusieurs étages de bureaux et un observatoire. Au total, 59 ascenseurs permettront aux visiteurs de se déplacer entre les étages.

Pour soutenir ces prouesses techniques, Dextra est fier de fournir des coupleurs Bartec pour les fondations et les superstructures de la tour de Djeddah. Deux principaux types de coupleurs Bartec sont utilisés : les assemblages standard et de pontage.

Voir le projet complet

Worldwide teams gather in Thailand to prepare 2016!

Dextra worlwide teams recently gathered in Bangkok, Thailand, to prepare the roadmap for 2016!

The hard work week was topped by a couple of team building days on the seaside near Pattaya, which included diverse activities such as go kart, sailing on a pirate boat, and, of course, degustation of delicious Thai food.

Teams are now ready for 2016! Way to go Dextra teams!

 

teambuilding2015 2

teambuilding2015 3

teambuilding2015 4

​Dextra Industry and Transport – now establishing ISO 14001

With high concern of environment and safety, Dextra Industry and Transport now establishing our Environmental Management System as widely known as ISO 14001 : 2004.

We are proud to communicate our strong intention of environmental care through our environmental policy as follows:

  • We will comply with relevant environmental regulations, registration and all environmental issue.
  • We will continually improve and prevent pollution by disposing of waste according to regulated means.
  • We will educate, train and share our environmental policy and experience with members of our  organization, customers and vendors in order to encourage environmental awareness and excellence.
  • We will incorporate safe practice in usage, through environmental program, objective and target.
  • We strive in the way not creating any global warming or any pollution to the environment.
  • Our aim on environment activities policies is to ensure that we sell product and services  with concept of preservation of ecology and society.

 

Quality & Safety days in Bangkok

Quality excellence and safety first!

This could be the motto of this 3rd edition of the Dextra Manufacturing Quality & Safety days taking place at our Bangkok factory on the 14 and 17 of November.

 

Nouveau !

For two days, Quality and HR departments team up to organize activities promoting quality awareness and safety practices among office staff and factory operators.

This annual event is also an opportunity for the management to reward those who contributed the most through their daily actions to the production of qualitative products in the safest environment possible.

 

With quality and safety key indicators continuously improving over the last 3 years despite the large increase of our production volume, peaking at more than 1.1 million couplers monthly in 2014, there is no doubt that quality efforts of our manufacturing teams paid off in 2014. Congratulations!

qualitydays crowd

Veuillez entrer vos informations

Contactez-nous

   Partagez vos informations avec nous et nous vous répondrons dans les plus brefs délais.