Pre-grouted anchors for faster excavatations

Excavation anchor supplier in Saudi Arabia

Duba ISCC Green Power Plant 1 is a large power infrastructure project taking place in the North West of Saudi Arabia, on the Red Sea. The project, based on the ISCC technology (Integretad Solar Combined Cycle) is a combined Gas (500 MW) and Solar (additional 50MW) power generation plant.

For Duba Green Power Plant, Dextra supplied its Geotec Double Corrosion Protection (DCP) Permanent Steel ground anchors to prevent soil movement in the perimeter of the excavation.

For this project, Dextra provided a “factory grouting” service, meaning that the anchors arrived at the site as pre-grouted 12-meters segments, ready to re-connect via couplers and to install.

Learn more about that project

Headed Bars for the Manglar Viaduct in Cartagena

Manguitos-Refuerzo-Colombia

Le projet Viaducto del Manglar est un projet de pont de 5,3 km enjambant la Ciénaga de la Virgen (marais), au nord de la ville de Carthagène, en Colombie. Le projet vise à réduire les embouteillages à la sortie de la ville dans la Zona Norte (zone nord).

For this project, Dextra supplied its Headed Bar systems, used into large prefabricated caissons, in order to reduce the reinforcement congestion. That application allow designers to lower the steel/concrete ratio in eleemnts. Headed Bars are also much easier to install, as they fit on straight bar that can be inserted in the case easily.

Learn more about that project

More about Headed Bars applications

Opening of Louvre Abu Dhabi, a Bartec project

Rebar connections for Abu Dhabi Louvre project in 2013

Louvre Abu Dhabi museum opened its door on the 11th of November! For that landmark project in the UAE, Dextra supplied between 2013 and 2014 more than 110,000 Bartec connections , easing the reinforcement connection for raft and columns, and allowing the creation of temporary openings for the passage of men and equipment.

Learn more about that project

New logistics facility in the United Kingdom

Dextra UK facility

Dextra has recently opened a new logistics center in Newport, UK. The facility will be used as Dextra’s spare parts inventory for the European market and offer a better overall experience to our customers.

Newport will also serve as a base for our European after-sales team which maintains all Dextra equipment at distributor yards and construction sites all over Europe.

Get in touch with Dextra team in the UK

Montenegro viaducts built in seismic environment

The Bar-Boljare Highway is a key infrastructure project in Montenegro led by the Ministry of Transportation and Maritime Affairs and built by China Road and Bridge Corporation (CRBC). The 2×2 lanes highway spans over 40km, in seismic environment.

iNGEROP, the consulting firm on the project, required the rebar couplers to comply with ISO 15835 requirements (cyclic requirements as per class S2). For that reason, CRBC chose Dextra Bartec® solution for reinforcement connection.

Learn more about this project

Soft-Eyes installed at Singapore Marine Terrace Station

Four large diameter soft eyes have been installed in the diaphragm wall cages of the new Singapore MRT Marine Terrace Station during August 2017.

Les Soft-Eyes sont fabriqués à partir de barres d'armature en PRV, qui sont utilisées pour remplacer le renfort en acier dans les murs en D des puits de construction. Lorsque le tunnelier (TBM) perce les murs en D, il coupe facilement les barres GFRP, ce qui permet d'économiser du temps sur le calendrier du projet et de l'argent sur l'utilisation de l'équipement.

Dextra a été le pionnier de cette application depuis sa première utilisation dans le projet du métro de Bangkok en 1998 et possède une vaste expérience dans la conception et la fabrication en interne de Soft-Eyes.

The D-Walls installed on Terrace Station also feature Bartec® rebar couplers, a common application which allows for the horizontal re-connection of the station slabs.

Left: Part of the Soft Eye with overlap between steel & GFRP
Right: Bartec couplers in the D-Wall will be used for slab reconnection.

Left: Raising the Soft Eye in position
Right: Vertical position. Circular shape of the TMB breakthrough target is visible in light color.

Learn more about Soft eyes

New design tool for Marine Tie Rods!

Marine Tie Rod solutions can seem at start overwhelming at first as there are many many types of quay walls, anchorage types and ways to connect them with tie rods.

To guide designers through the creation of the perfect quay structure, Dextra has developped a comprehensive step-by-step palette of AutoCAD tool to be used in complement of our Marine Tie Rods Technical Guide. This new tool features our complete range of diameters, grades and accessories.


We hope that this new AutoCAD tool will speed up both understanding of our systems and the design of your structure. For all questions, Dextra Bar Systems dedicated engineering team remains available to support you in the system selection and drawing.

Demonstration


No Youtube access? Download the tool documentation to get a glimpse at how it is used >> Download (PDF)

How to get started ?

1. Download and install AutoCAD palette .zip >> Download (registration required)
2. Download and open Dextra Marine Tie Rods Technical Guide >> Download (registration required)
3. Gather your project loads and identify the M-size and Grade required for your project in our Technical Guide.
4. In AutoCAD, follow the step-by-step approach detailed in the application documentation. The application will help you select the right accessories based on the type of walls on your project. Draw a full system in now time.
5. Generate and add specification notes directly in AutoCAD by simply selecting the block (bar, thread, accessory) you want to specify.

Un été sportif mouvementé à Bangkok !

L'été sportif a été riche en événements dans notre usine de Bangkok avec l'organisation de deux événements sportifs consécutifs où les équipes ont prouvé leur esprit d'équipe et leur motivation pour aller gagner !

Suan Luang 2017 « Baxter Charity Run » – édition 2017

Awards
Running event at Suan Luang
Running event at Suan Luang
dimanche 3 septembre, l'équipe Dextra en Thaïlande a aligné 57 coureurs lors du « Baxter Run for Fund 2017 » qui se déroule à Suan Luang Rok 9, un grand parc non loin de l'usine principale de Dextra. Tous les coureurs Dextra ont concouru sur 2 distances : 5km et 10km.

Courir, ça fait du bien mais ça fait du bien aussi ! Tous les bénéfices de cet événement (1 800 coureurs au total) seront reversés aux associations caritatives thaïlandaises suivantes :

Plus d'informations sur Site de l'organisateur

Coupe DMFL – édition 2017

Awards

Football event DextraAu cours des mois de juin, juillet et août, un total de 7 départements et équipes de production Dextra se sont affrontés pour la Dextra Manufacturing Football League, la « DMFL » ! La bataille a été acharnée, mais la finale a désigné son vainqueur : félicitations à l'équipe de l'alliance « Certification Qualité & Production Coupleurs », pour avoir remporté ce tournoi et prouvé une fois de plus que Qualité et Production vont de pair pour créer des résultats exceptionnels !

1ère place : équipe de certification de qualité et de production de coupleurs

2e place : Équipe du magasin

3ème Place : Équipe de maintenance des équipements

New Groutec “S” range fits even thin precast elements

Groutec S

Dextra has expanded the range of Groutec, its rebar splice designed for the quick and easy connection of precast elements.

The new Groutec S (“Slim”) features a narrower body that makes it apt for use even in very thin precast panels, walls or columns. Thanks to its compact design, Groutec S also allows extra savings on grouting mortar, making its use even more economical.

For contractors that need to work with larger tolerances, the Groutec standard range, rebranded as Groutec L, remains available.

For more information about Groutec and access to Tekla, Revit and AutoCAD models, please refer to the dedicated product page

More about Groutec

Awarded at Mumbai CIA World Builders & Infra 2017

Awards Dextra has been awarded “Best Company in innovative construction methodology” at the ceremony of the CIA World Builders & Infra 2017. This award acknowledges the technical solutions brought by Dextra to the Indian construction industry in the recent years. Mr. Suniil Desai, General Manager of Dextra India, received the award at the ceremony.

Awards
Dextra has more than 16 years presence in the construction Indian market, offering its full construction range, including Concrete Reinforcement splicing systems (Bartec) and equipment, Tension Bars solutions, Post Tensioning Solutions, and new innovative Ground Anchoring solutions coming in steel and FRP material.

For more information, please contact Dextra India Mumbai office
Dextra India's General Manager receiving the CIA award
Dextra India's General Manager delivering a speech

Veuillez entrer vos informations

Contactez-nous

   Partagez vos informations avec nous et nous vous répondrons dans les plus brefs délais.