Groupe Dextra | Connexions fiables

Recherche
Fermez ce champ de recherche.
Recherche
Fermez ce champ de recherche.

Dextra’s Quarterly Newsletter: Connection #38


The Mumbai Metro Line 2B is a vital infrastructure project designed to enhance public transport in Mumbai. Dextra has contributed to the project by supplying advanced construction solutions to ensure the structure’s durability and strength.

For the elevated section’s U-girders, Dextra provided Barre CR 1080 for both stressing and pre-tensioning. Additionally, fully threaded bars were supplied for temporary stressing, offering flexible and secure connections between precast segments.

Dextra also delivered Unitec couplers, enabling efficient rebar connections without pre-threading, ensuring strong, seamless structural continuity on-site. Moreover, Sonitec CSL testing tubes were provided for concrete pile integrity testing.

By contributing these advanced materials and solutions, Dextra is supporting the development of a reliable metro system that will meet Mumbai’s growing transportation needs for years to come.

More about our latest projects

UK_HS2-ChilternTunnel_Slider3
DE_A66-Salzbachtal-Bridge_Slider5
TH_Neo-Factory_Slider2

High Speed 2 (HS2), UK

Griptec couplers are reinforcing critical rebar connections across multiple key sites in the UK’s new high-speed railway project.

Cairo Monorail Bridge, Egypt

High-strength tension rods were used as hangers for the bowstring monorail bridge to maintain its structural integrity and durability.

Salzbachtal Bridge, Germany

Sonitec CSL tubes were chosen for cross-hole sonic logging to assess deep foundation integrity and ensure the stability of the bridge.

Neo Factory Phase 1, Thaïlande

Bartec et Groutec play a key role in the precast column connections, guaranteeing reliable construction.

Introducing Durabar Carpet: the latest breakthrough from Dextra!

Made from Durabar GFRP rebar, this latest patented Durabar Carpet offers unparalleled versatility for construction projects. Designed for efficiency, its ability to be cut effortlessly in any direction ensures maximum material savings.

Key Features:

•   Bar from Ø 6mm to Ø 16mm
•   Standard length: 5.8m
•   Customizable lengths: 2m to 5.8m
•   Flexible spacing: 100mm to 600mm

Watch Now: FibreCraft Insights – Exploring GFRP in Construction

Dextra is excited to present FibreCraft Insights, our brand-new video series dedicated to Glass Fibre Reinforced Polymer (GFRP) rebar in the infrastructure construction industry.

Hosted by our experts in composite solutions, this series offers valuable insights into the growing role of GFRP in modern construction.

The first three episodes are available now, where we delve into an introduction to the material and its advantages, the unique technical features of GFRP, and real-world applications.

Follow our LinkedIn to stay tuned for more episodes!

Recent activities

Our Collaboration with Makin Juta

Watch our latest interview with Makin Juta, one of our esteemed distributors and partners in Malaysia, and discover our collaboration on the iconic KLCC Lot L and M Podium project, where Bartec was selected as the trusted solution. Watch the interview

 

Tension Rods & PT Bars EPD Verified

Dextra’s tension rods and post-tensioning bars are Environmental Product Declaration (EPD) verified and listed on the EPD Hub, joining our previously verified couplers, GFRP rebars, marine tie bars, ground anchors, rock bolts, and Sonitec. En savoir plus

 
 

 

Headed Bars Now CE Marked with ETA

Bartec, Fortec, and Rolltec headed bars are now CE marked with European Technical Assessments (ETA). Tested by Concrefy and certified by Kiwa, these are our first CE-marked products, meeting the essential requirements. En savoir plus

 

Commitment to Community in Thailand

Dextra Thailand donated to the Cerebral Palsy Sports Association of Thailand. En savoir plus. Additionally, we donated unwanted office furniture to a school and hosted environmental stewardship activities for students. En savoir plus

 

Upcoming events

World of Concrete India

16-18 Oct 2024

Port Dev. MEA Forum, United Arab Emirates

21-22 Oct 2024

ASEAN Ports & Logistics, Malaysia

10-11 Sep 2024

Bauma
Chine

26-29 Nov 2024

CTBUH Asia Conference, Thailand

3-4 Dec 2024

Veuillez entrer vos informations

Contactez-nous

   Partagez vos informations avec nous et nous vous répondrons dans les plus brefs délais.