Groupe Dextra | Connexions fiables

Recherche
Fermez ce champ de recherche.
Recherche
Fermez ce champ de recherche.

Dextra’s Quarterly Newsletter: Connection #22


Melbourne Metro project: a showcase of Dextra solutions

 

The Metro Tunnel is a major enhancement to Melbourne’s rail network, a multibillion-dollar project comprising the design and construction of twin nine-kilometer tunnels and five underground stations.

The stations are designed based on the architectural character of the local area.

Dextra has been selected as a one-stop solution supplier, thanks to its wide range of products.

The numbers are impressive:

  • 400,000 Griptec rebar couplers
  • 5,300 GFRP Combination Bolts
  • 900 GFRP soil nails
  • 16 TYMPANS COMPOSITES POUR LES TUNNELIERS

Dextra was able to support and share their expertise on GFRP at design stage and produce the GFRP solutions as per the owner expectation.

Tests de performance des coupleurs à températures élevées

 

L'Imperial College de Londres a testé les coupleurs Dextra Bartec/Fortec et Griptec à des températures élevées pour évaluer leur comportement en cas d'incendie.

Les points forts du test comprennent :

  • Les résultats indiquent que les règles codifiées actuelles peuvent être utilisées pour évaluer les propriétés de résistance et de rigidité des barres d'armature non épissées et des barres d'armature connectées avec des coupleurs Bartec/Fortec ou Griptec.
  • À des températures inférieures à 400°C, la résistance à la traction et la rigidité ultimes des épissures Bartec/Fortec et Griptec, ainsi que des barres d'armature non épissées, ne sont pas affectées de manière significative.
  • Lors des tests de traction à des températures inférieures à 500°C, la rupture se produisait généralement dans les barres d'armature en dehors de la région du coupleur Bartec/Fortec ou Griptec.

More about our latest projects

w660_11563472_onenineelms
w660_11563471_captaincook
w660_11563473_zakhrcity

One Nine Elms, United Kingdom                              

Griptec and Sonitec solutions were supplied to ensure structural safety and integrity of the iconic towers.

Strengthening of Captain Cook Bridge, Australia

In collaboration with Freyssinet, Freyssibar+ was the best smooth post tensioning bar for the job.

Zakhr City, Arabie Saoudite                                                   

3,000 fully threaded steel Rock Bolts were applied to secure the loose rock mass created after excavation.

New Tension Rods design tools!

To facilitate the work of designers and consultants, our team develops and continually improves intuitive tools for AutoCAD, Revit and Tekla users.

The updated Tension Rods systems were added to the Dextra design tool ranges, along with new tutorial videos.

Take advantage of our easy-to-use components, available for free download!

Interview with World Success Solutions

“We have been growing together and become one of the top mechanical splicing system providers in Malaysia, supporting many key customers, both local and international.”

 

 

 

Meet World Success Solutions Sdn Bhd (WSS), an engineering product solutions company in Malaysia that provide one stop service to local customers.

Find out why they have chosen Dextra since their first mega project in Malaysia

Veuillez entrer vos informations

Contactez-nous

   Partagez vos informations avec nous et nous vous répondrons dans les plus brefs délais.