Orhideea Towers, Romania
Orhideea Towers is a double-tower office complex located in the western part of Bucharest. The towers stand 85 meters (17 floors) and 64 meters (13 floors) tall, respectively, and are connected by a sky bridge.
Pour ce projet, Dextra a fourni son Fortec rebar coupler solution. The Fortec system consists of a standard rebar coupler, used for both standard and Système position, connected to two rebar ends that have been enlarged and threaded. Fortec is particularly suitable for seismic environments, making it ideal for buildings in the Bucharest area.
Fortec couplers were used for all Armatures connections in the heavily reinforced foundation mat (1.5 meters thick). Their compact design eliminates the need for overlapping rebar in congested areas, simplifying installation.
Additionally, Fortec couplers facilitated temporary openings, allowing workers and equipment to move through the Armatures. Before casting, continuation bars were simply connected to the couplers, closing the temporary openings.