Dextra Group | Reliable Connections

Fangchenggang Nuclear Power Plant 3&4

Fangchenggang Nuclear Power Plant 3&4

China is one of the world’s largest producers of nuclear power, and it’s consistently expanding its nuclear power production capacity with new reactors.

Units 1 and 2 of the Fangchenggang Nuclear Power Plant have been operational since 2016, while Units 3 and 4 are currently under construction.

A total of six reactors are expected to be operational at the Fangchenggang site. Units 1 and 2 are both CPR-1000 reactors, while Units 3 and 4 are Hualong One reactors. The planned Units 5 and 6 are also expected to be Hualong One reactors.

Construction of Unit 3 began in December 2015, followed by Unit 4 a year later. Dextra has supplied more than 500,000 sleeves of Griptec coupler for the reinforcement of the APC structure.

Griptec is well known for its reliability and high performance in tension, compression, and fatigue, thanks to its unique design that meets the world’s most stringent project specifications, particularly for nuclear reactor construction.

Related Solutions

Expertise

At every moment of your customer journey, Dextra teams dedicate themselves to the production of smart construction solutions that allow our customers to reach higher productivity and safety levels on their construction sites.

Dextra holds physical stocks on several continents, complemented in each country by the local inventories of our distributors. With this extended network, Dextra makes sure our products are always at reach no matter where our partners are.

For solutions that require to be customized, Dextra can also go beyond our standard delivery times and offer accelerated delivery schemes. Consult us for more information.

From 3 major industrial sites located in Bangkok (Thailand), Guangzhou (China), and Pune (India), Dextra completely owns its manufacturing facilities and processes. This allows us to have complete control over the timing of our operations and the quality of the solutions produced.

An independently accredited material testing laboratory, accredited to ISO-IEC17025, is located at Dextra’s main Bangkok factory, allowing the testing of material and products.

Dextra aims to supply products that exceed the most demanding international technical approvals and it is our goal to create maximum customer satisfaction by complying with our clients’ needs and specified requirements.