Grupo Dextra | Conexiones confiables

Buscar
Cierra este cuadro de búsqueda.
Buscar
Cierra este cuadro de búsqueda.

Fortec+ Hong Kong Buildings Department Approved!

Dextra, the leading provider of construction solutions, has received official approval for Fortec+ from the Buildings Department (BD) of the Government of Hong Kong. This approval marks a significant milestone not only for Dextra but also for the entire construction sector in the region.

The approval granted by the BD signifies the endorsement of Fortec+’s cutting-edge parallel thread mechanical splice system. This innovative solution has been proven to offer unprecedented efficiency, reliability, and safety in structural projects.

As the regulatory authority responsible for overseeing building construction and safety standards in Hong Kong, the BD’s endorsement serves as a testament to the reliability and compliance of Fortec+’s technology with local regulations and industry best practices.

“Bar Break” splicing system

Fortec+ is a complete tensile splice system, ensuring bar-break performance of up to 800MPa under tensile load.

 

Compliant with Hong Kong standards

Fortec+ meets the Buildings Department’s Code of Practice for Structural Use of Concrete 2013 and is listed on the Central Data Bank List of Building Materials.

 

Reliable solution

The Plus (+) entails additional testing of proof load, ensuring the most reliable connections through a single set of thread preparation equipment.

 

Technical support

Our team in Hong Kong are available to accompany you through each step of the design process using readily available CAD/BIM tools and during onsite installation.

Trusted by Various Iconic Projects Across Hong Kong!

Penny’s Bay and Kai Tak Community Isolation Facility

Central Kowloon Route – Central Tunnel

Trunk Road T2

Tseung Kwan O – Lam Tin Tunnel

Dextra Achieves New Milestone for Hinkley Point C Project

Dextra, in conjunction with our esteemed partners EDF, BYLOR and Express Reinforcements Ltd., is thrilled to announce a significant achievement: the successful provision of an astounding 2.5 million Griptec connections and 3 million headed bars for the monumental Hinkley Point C nuclear power plant project in the UK!

This milestone serves as a testament to Dextra’s dedication to quality, excellence, and the capability to execute large-scale, intricate projects.

The commitment and adaptability of the Dextra team have been pivotal in ensuring the seamless operation of the supply chain, facilitating timely progress at every juncture.

Dextra is privileged to contribute significantly to the advancement of sustainable energy and is honored to play a vital role in shaping the future.

Breaking Ground: GEOTEC Joins Sustainability Drive with EPDs!

We are proud to share the latest addition to our sustainability journey: EPDs (Environmental Product Declarations) for GEOTEC are here! Check out our geotechnical products now officially published on the EPD Hub website:

This another accomplishment builds on our commitment to eco-conscious construction, following EPDs for rebar couplers, GFRP rebar, and marine tie bars. Our dedication doesn’t stop there – stay tuned as we work on EPDs for more of our solutions!

EPD Report for GEOTEC Steel Ground Anchor

EPD Report for GEOTEC Steel Ground Anchor

No se puede mostrar el archivo PDF. Descargar en cambio.

EPD Report for GEOTEC Steel Self-Drilling Rock-Bolt

EPD Report for GEOTEC Steel Self-Drilling Rock-Bolt

No se puede mostrar el archivo PDF. Descargar en cambio.

EPD Report for GEOTEC Steel Combination Bolt

EPD Report for GEOTEC Steel Combination Bolt

No se puede mostrar el archivo PDF. Descargar en cambio.

Dextra’s Quarterly Newsletter: Connection #36

Welcome to our first newsletter of 2024. On behalf of all Dextra employees, we extend our warmest wishes to you and your loved ones for a joyous and prosperous New Year and Chinese New Year!

As we bid farewell to 2023, a remarkable year for us as we celebrated our 40 years of establishment, we want to express our heartfelt gratitude to you for your presence in our celebration events which added a special touch to our milestone.

In 2024, we eagerly look forward to continuing our collaboration with you. Your dedication and support have been instrumental in our success, and we are excited about the opportunities and achievements that lie ahead.

Thank you for being a valued part of the Dextra family!


India’s Longest Sea Bridge

Unveiled for Public Journeys

The 22-km Mumbai Trans Harbour Link (MTHL), connecting Mumbai with Navi Mumbai, features a 6-lane, 27-meter-wide highway with two emergency exit lanes. Recently opened this month, this sea bridge, the longest in India, aims to alleviate Greater Mumbai’s traffic congestion. Dextra’s contribution includes supplying 290,000 Bartec couplers for concrete structure reinforcement and 50,000 Sonitec sonic tubes for CSL testing in barrette piles.

Read more about our contribution

 

More about our latest projects

Click on the pictures to read more:

 

Grand Inauguration of Dextra’s

State-of-the-Art Factory in India!

We are thrilled to announce the successful inauguration of our brand-new factory in Pune, Maharashtra, India!

Equipped with cutting-edge machinery, our 12,000 square-meter facility is now in full swing to meet the highest industry standards. We produce top-quality rebar couplers at double capacity, Sonitec tubes, and have introduced a new facility for manufacturing GFRP rebars. Additionally, it is equipped with an in-house testing laboratory and workspace for the repair and refurbishment of site equipment.

The factory boasts a comfortable working environment designed with the well-being of our incredible team in mind. Safety is our priority, and our new facility reflects our commitment to providing an outstanding workplace for our dedicated employees.

Watch the video to get an exclusive peek into the joyous celebrations that marked this milestone for Dextra.

Watch the video on YouTube

 

Recent activities

Factory 2 in Thailand Achieves Green Industry Level 3 Certification

Following in the footsteps of our Level 3-certified Factory 1 in Bangkok, Thailand, Factory 2 has recently been awarded the same Green System certification by the Ministry of Industry of Thailand. This illustrates our commitment to systematic environmental management, rigorous monitoring, evaluation, and continuous improvement.

Environmental Leadership Honored: Dextra Receives Award in China

Dextra received the Environmental Leadership Award at the Sino-French GBA Business Summit in Guangzhou, China, in recognition of its outstanding contribution to environmental sustainability. Our GFRP rebars, key players in reducing CO2 emissions compared to traditional steel rebars, underscore our commitment to building a greener, more sustainable future.

 

Upcoming events

Dextra’s New Office in Pune, India

We’re overjoyed to announce the grand inauguration of our brand-new office building at our recently opened Pune factory! This marks a significant milestone in our journey as we expand our services and presence across India.

While our main office continues to thrive in Mumbai, we’re now even closer to our valued customers in Pune with this new addition. Plus, our representatives are readily available in Chennai & Delhi to ensure seamless assistance and support wherever you are.

Big thanks to our dedicated team whose hard work and commitment have made this expansion possible. Once again, here’s to new beginnings, endless opportunities, and continued growth!

Jal Jeevan Mission Water Reservoirs, India

 

Jal Jeevan Mission Water Reservoirs, India

 

The Jal Jeevan Mission of the Government of India is a flagship initiative where attempts are made to ensure adequate supplies of quality drinking water at affordable rates on a long-term basis. It emphasizes the importance of proper water management, infrastructure development, and community participation to achieve the ambitious goal of ‘Har Ghar Jal’ (Water to Every Household).

Considering the widespread geography of India, uneven terrain, and human settlements in remote locations, access to continuous water is a challenge. Therefore, overhead tanks are a good option for efficiently storing and distributing water, particularly in areas with inconsistent water supply patterns. Construction and infrastructure development are yet another key factors that have a direct influence on development.

Precast construction is one such method that has gained tremendous momentum in recent times due to its advantages, such as accelerated productivity, better quality control, environmental friendliness, and optimized material and labor usage. Although this method incurs high initial setup costs, its attractiveness is enhanced by large-scale projects with standardized designs. In the project, our team worked in close coordination with Larsen & Toubro (L&T) from the design stage, carefully selecting Groutec and Bartec couplers to connect the H and U frames of the overhead tanks.

Our range of Groutec couplers is arguably the most reliable mechanical splices, specially designed to connect two precast elements with no requirement for in-situ wet concrete joints. These couplers have been successfully qualified and tested over the years on several major infrastructure projects, including process plant pipe racks, residential and commercial buildings, and data centers, among others.

 

Tai Po Railway Pier – Reconstruction of Tai Po Kau Tide Gauge Station

 

Tai Po Railway Pier – Reconstruction of Tai Po Kau Tide Gauge Station, Hong Kong

 

In the dynamic coastal landscape of Tai Po Kau, New Territories, Hong Kong, infrastructure projects demand robust and resilient solutions. One such endeavor, the Reconstruction of Tai Po Kau Tide Gauge Station project, required innovative materials to withstand the unique challenges posed by its environment. Dextra stepped in to provide approximately 1,000 meters of Glass Fibre Reinforced Polymer (GFRP) rebar for the slab of the Tai Po Railway Pier, showcasing the efficacy of advanced composite materials in marine construction.

The Tai Po Kau Tide Gauge Station project aimed to revitalize the existing infrastructure, enhancing its resilience against tidal forces, corrosion, and environmental degradation. Recognizing the limitations of traditional steel reinforcement in marine environments, the project sought alternatives that could offer superior durability and longevity. Dextra’s GFRP rebar emerged as the ideal solution, offering exceptional resistance to corrosion, rust, and chemical degradation commonly associated with saltwater exposure.

GFRP rebar, composed of high-strength glass fibres embedded in a polymer matrix, delivers mechanical properties comparable to steel but with added benefits. Notably, GFRP rebar exhibits significantly lower thermal conductivity, reducing the risk of thermal bridging and enhancing structural integrity in extreme temperature variations. Furthermore, its non-magnetic properties eliminate electromagnetic interference, making it suitable for sensitive applications such as tide gauge stations.

The application of GFRP rebar within the Tai Po Kau Tide Gauge Station project encompassed both straight and bend bars, catering to the diverse structural requirements of the public pier. Dextra’s expertise in custom fabrication ensured precise bending and shaping of the rebar to fit the intricate geometries of the pier structure, facilitating seamless integration and minimizing construction complexities.

Fábrica Nestlé LEO, Tailandia

 

Fábrica Nestlé LEO, Tailandia

 

La dependencia de Nestlé LEO Factory de elementos prefabricados necesitaba un método confiable y eficiente para unir la estructura prefabricada del edificio. La construcción utilizó Groutec F, un conocido sistema de empalme diseñado por Dextra, para satisfacer las exigentes demandas del edificio prefabricado. Groutec F permite la conexión de barras de refuerzo sin necesidad de preparar los extremos de las barras y se utilizó para la conexión de juntas prefabricadas de vigas y columnas en este proyecto.

Groutec F es una solución de conexión completamente inyectada que garantiza robustez y durabilidad frente a entornos operativos dinámicos. Diseñado y fabricado de conformidad con los estándares líderes de la industria, como Eurocódigo 2, BS 8110, ACI 318, IBC y AASHTO, Groutec F garantiza el cumplimiento de rigurosas especificaciones estructurales. Es compatible con las principales marcas de lechadas sin contracción disponibles en el mercado, lo que reduce las complejidades logísticas y los plazos de adquisición.

 

One Lake Club, Rumania

 

One Lake Club, Rumania

 

One Lake Club es un prestigioso proyecto que promete redefinir la vida de lujo en la capital rumana. Su objetivo es establecer nuevos estándares en la vida urbana, ofreciendo a los residentes una combinación incomparable de elegancia, comodidad y funcionalidad. El proyecto abarca una variedad de instalaciones residenciales y recreativas, que incluyen apartamentos de lujo, exuberantes espacios verdes y comodidades de última generación. Con su visión ambiciosa y su meticulosa atención al detalle, One Lake Club representa un modelo de excelencia arquitectónica moderna en Bucarest.

A medida que avanza la construcción de esta ambiciosa empresa, garantizar la integridad estructural del edificio es primordial. Aquí es donde entran en juego los acopladores Bartec de Dextra. Reconocidos por su confiabilidad y versatilidad, los acopladores Bartec BF brindan conexiones robustas entre barras de refuerzo, mejorando la resistencia y durabilidad de las estructuras de concreto. En el caso del proyecto One Lake Club, estos acopladores están diseñados específicamente para aplicaciones de apertura temporal, ofreciendo flexibilidad y eficiencia en los procesos de construcción.

Los acopladores Bartec BF de 12 mm sirven como eje en el flujo de trabajo de construcción, permitiendo una integración perfecta de las barras de refuerzo dentro de la estructura de hormigón. Su diseño innovador garantiza una instalación rápida y sencilla, minimizando el tiempo de construcción y maximizando la seguridad y el rendimiento. Al facilitar aberturas temporales en la estructura de concreto, estos acopladores permiten un acceso eficiente para mantenimiento, inspección y modificaciones futuras, agilizando así el proceso de construcción y garantizando una durabilidad a largo plazo.

 

Almacén de Uniqlo y Hive Indonesia

 

Almacén de Uniqlo y Hive Indonesia

 

La construcción de edificios en Indonesia ha estimulado la necesidad de métodos de construcción rápidos y eficientes capaces de satisfacer las demandas de una población creciente. La construcción prefabricada ha surgido como una solución a estos desafíos, ya que ayuda a minimizar los requisitos de mano de obra en el sitio, acelera los plazos del proyecto y garantiza una calidad constante.

La base del éxito de una construcción prefabricada es la unión perfecta entre los elementos estructurales. Dextra suministró acopladores prefabricados a Groutec para proyectos en todo el mundo, incluida Indonesia. Se utilizó Groutec en tamaño de 20 mm en el proyecto de construcción de almacenes de Uniqlo & Hive Indonesia para unir columnas prefabricadas, lo que facilitó un montaje rápido y fiable y al mismo tiempo garantizó la integridad estructural.

Los acopladores han minimizado los requisitos de mano de obra en el sitio y han acelerado los hitos del proyecto. Esto no sólo se traduce en ahorros de costos, sino que también garantiza una entrega oportuna, lo que permite que el edificio cumpla antes su propósito previsto. Además, la composición de acero de alta resistencia de los acopladores y las estrictas medidas de control de calidad garantizan conexiones robustas que resisten los rigores de las cargas estructurales dinámicas.

 

Por favor ingresa tu información

Contáctenos

   Comparta su información con nosotros y nos comunicaremos con usted lo antes posible.